r/civilengineering • u/BeanTutorials • Oct 01 '24
Meme You guys think there's power lines under here?
/img/g45h6njtm2sd1.jpeg
128
Upvotes
r/civilengineering • u/BeanTutorials • Oct 01 '24
158
u/troll606 Oct 01 '24
What do we look like to you 811?
96
u/quigonskeptic Oct 01 '24
No. The contractor will start excavating and find them 20 ft to the left.
44
u/[deleted] Oct 01 '24
Not according to my boss, there is definitely space to get a boring in there, we already paid for the rig after all
22
u/i_like_concrete Oct 01 '24
Looks like a Friday afternoon job.
14
u/[deleted] Oct 01 '24
What gave it away
13
u/Vincent_LeRoux Oct 01 '24
SW 18th Ave at Madison St. Have fun digging out there. It's a mess. PGE still has old tile lined duct banks in that part of town.
8
u/[deleted] Oct 01 '24
Either that or that vault is radioactive
8
u/mycondishuns Oct 01 '24
As a utility design engineer, no, not at all. Those are just alternate crosswalks for pets.
7
u/astrospud Oct 01 '24
The red lines mean “dig here”
5
u/ddg31415 Oct 01 '24
Nah, someone just drew some funky red hair on the plate. Just start diggin bud, you're good.
3
u/Tombo426 Oct 01 '24
Lmao…naw prob just not sure exactly where so they just marked the whole area! 😆
2
u/eatnhappens Oct 01 '24
Looks like a lot of concrete, I’d recommend blasting it out.
2
u/Ok-Suspect2099 Oct 01 '24
Nah you good
1
u/38DDs_Please Oct 01 '24
Those are Schrodinger's lines. You don't know until you drill...
Edit: I can't spell.
1
u/[deleted] Oct 01 '24
Rip them out and ask for forgiveness later.
1
u/WideFlangeA992 Oct 01 '24
I cannot offer advice only prayers 🙏🙏
1
u/[deleted] Oct 01 '24
only one way to find out
1
u/[deleted] Oct 06 '24
Probably at least one
1
u/theekevinbacon Oct 01 '24
Ome time the utility company mis marked a 11kv (maybe more, 5" thick) line. The line essentially ran parallel with the curb, 10 feet offset from it. There was an abandoned duct bank 20' offset from the curn as well.
Problem was we had already moved the curb to it's new location, now a 20' offset from the live wires.
I found out as the inspector where they were digging and stopped them just after they had popped an empty duct bank line 4 inches from the 11kv one. That was the next one to go. We were probably 45 seconds from the two guys standing there getting fried.