You may remember my last post;
My builders completely F'd it and Building Control failed my £43k extension.
I have an update.
I gave the building company 14 days to respond to an itemised list of my issues, and on the 14th day at the 11th hour they responded. In short, they've agreed to send a tradesman out to inspect the roof and identify whether a Plastic Underlay system for the tiles is appropriate. Annoyingly, they've suggested they refund me for the Labour & Materials already spent on the Tile Roof, and then they would charge me for the Labour & Materials to reinstate the roof.
I find this unacceptable, I already paid over the fixed-price of the roof in the quotation, so while I will accept their tradesman identifying the issue and rectifying it, I won't be paying any extra for their corrective works.
Where they've really fucked it is in the ceiling. When the rafters were installed Building Control visited and told the tradesman, while I was present, that regulations changed in 2022 and there is now a requirement to fit 25mm of insulation board as a minimum underneath the rafters in a continuous layer to prevent cold-bridging from the rafters (This isn't exactly a fixed requirement, it's actually based on a u-Value, but this is the most common & cost-effective way to pass that test)
Building Control requested documentation of the installation of this insulation, and my builders wrote back confirming they had installed 150mm of insulation between the rafters, plus the 25mm required underneath.
Well..
I had a gent from another building company out to inspect the floor & ceiling, and we removed a couple downlights, and couldn't find any evidence of a 25mm insulation layer. So now it looks like in addition to my tiles needing to be removed, so does the ceiling! That's going to be an awful lot of mess.
The builders are also predictably pushing back on the flooring too, stating because I installed it they can't be held responsible for the tiles gapping, however I've had two independent tradesmen out to inspect and they have noted the significant depressions across the floor and stated this is a common cause of LVT separation.
It looks like I will probably be taking them to court unless they gracefully concede their various errors and agree to correct. Stay tuned for the next update.