I have a contract with a well-regarded GC for a new home build under a fixed price + materials contract. HCOL area--contract will be at least $1.3M.
I have very detailed plans from my architect, who will also be doing Construction Admin, with 10 site visits. While most material specifications are called out in the GC contract (type of siding,
type of HVAC systems, windows/doors) specific details around the build are
missing. Importantly, the GC contract states:
"This contract supersedes material specifications listed on the architectural plans with respect to builder-grade substitutions, unless specifically agreed otherwise in writing. All work is based on builder standard materials, standard installation methods, and the use of GC's established vendors and suppliers."
Should this be cause for concern? I asked to have the construction drawings and spec list directly incorporated into the contract, and received this in response:
"While we work from the architectural drawings, we do not agree to have an architect's specifications supersede the terms of our construction contract. We do not approach our
projects by individually reconciling every material and installation method
against an architect's specifications."
My question: What is the norm for a high-end build? I didn’t think that building according to the architect’s specification would have been problematic, but maybe my architect’s level of
detail is overkill and I have unrealistic expectations. As written, there is also no clause that
protects me against deficient work. I asked to have payments tied to sign-off
from my architect, but was told no. Is
this normal or am I expecting too much in having a home built exactly to what
is in the constructing drawings? I know
many GCs don’t like AIA contracts, but is what I’m asking for extreme?
Example:
From my architect’s construction drawings re: concrete/masonry/vapor barrier
Concrete: Reference standard shall be American Concrete Institute (ACI) 318 (latest edition).
Unless otherwise noted, all concrete shall be 3,500-psi ultimate compressive strength at 28 days and made with normal weight stone aggregate. Footings shall be formed as conditions require or as indicated on the drawings.
All grout shall be non-shrink type with a minimum compressive strength of 3,500 psi.
Reinforcing steel shall be deformed bars of new material conforming to American Society of Testing Materials (ASTM) a615, grade 60. The size and spacing of bars shall be as indicated on the drawings. Provide chairs or similar means to locate reinforcing. Unless otherwise noted, concrete coverage of reinforcing steel shall be 3”.
If specified, welded wire fabric shall conform to ASTM A185 with a minimum tensile strength of 70,000 psi.
If specified, screed slab in crawl shall be 2" minimum thick, unless otherwise noted.
Concrete Unit Masonry: [reference standards shall be the National Concrete Masonry Association (NCMA) Tek manual for concrete masonry design and construction, and ASTM c90 (latest edition). All concrete masonry units shall be normal weight crushed stone or gravel aggregate moisture-controlled block conforming to ASTM c90 (latest edition) type 1, grade n. Unless otherwise noted, provide and install 'dur-o-wall' nine gauge horizontal joint reinforcement at 16” on center vertical spacing.
Mortar shall conform to ASTM c270 of the following type(s):
Type m - for foundations in contact with the earth.
Where the drawings require that hollow masonry blocks be filled, use mortar or grout with a comprehensive strength of 3,500 psi in accordance with ASTM c476, and installed in accordance with ACI 531 for low lift procedures.
The first block course of foundation walls to be keyed to footings and filled solid.
Fill block solid at all beam bearing and column support locations.
Coordinate masonry work with all trades requiring work to be built in place including but not limited to conduits and beam seats.
All exterior concrete masonry walls and piers shall be parged with (2) coats, 1/4” minimum thickness, of Portland cement plaster (1: 2-1/2 mix by volume) or the mortar used in laying up a masonry foundation wall. When parging is dry, damproof exterior of wall from footing to grade line, see section: thermal and moisture protection.
Vapor barrier below all interior concrete slabs:
Provide and install 10 mil polyethylene vapor barrier by 'American Sisal Kraft Corp.' under all concrete slabs. Install over 1-1/2" minimum, clean, dry sand.
All seams shall be lapped a minimum of 1'-0”.
Infiltration barrier: Provide and install Blueskin wp 200 self-adhering membrane, by Henry Company, over sheathing. Install per manufacturer's specifications.
What is in the GC contract:
· Concrete footings, CMU foundation walls and interior piers per foundation plan S-1; footings to undisturbed virgin soil, perimeter foundations maintaining a minimum 32" depth below grade. First block course keyed to footings and filled solid; cells filled solid at all beam bearing and column support locations. Sump pit, per plan.
· 4" concrete slab reinforced with 6x6 / W1.4 x W1.4 W.W.F. over 10 mil vapor barrier over 4" gravel base at crawl space and one-car garage.
· Exterior masonry walls and piers parged with (2) coats, 1/4" minimum thickness, and damproofed; block foundation vents per crawl space venting calculations.