u/ruaridh42 Jul 13 '21

Fantastic comparison, but honestly it makes me pretty sad. SLS is incredibly held back by its comparitely tiny upper stage, where as the S-IVb packed the serious oomf that Saturn needed to run its gauntlet of moon missions

34

u/rustybeancake Jul 13 '21

That’s because 1960s NASA funding packed the serious oomf that the agency needed to develop the first two stages and the third stage simultaneously. ;) The SLS program had to defer developing the ‘proper’ EUS upper stage until the first stage had been developed.

9

u/royalkeys Jul 18 '21

There’s no sugarcoating this. Us manned spaceflight (Congressional interests)has achieved less for the money, arguably less for more money even in considering inflation with the already paid development costs.But hey,,,, let’s re spend the development costs again and again for the same capability or even less capability per launch cost versus the 60s. They need to continue to mod the incentive structure for contracts which was a start ie for commercial crew.

12

u/seanflyon Jul 13 '21

To put this is more concrete numbers, the current NASA budget is about 80% of the average in the 1960s, adjusted for inflation.

11

u/citybadger Jul 13 '21

That’s a surprisingly large percentage, considering now NASA has help from the ESA, JAXA, and others for missions. Adjusted for inflation, the total non-commercial space spending from the “free world” must be more that it was in the 60’s

13

u/seanflyon Jul 13 '21

A lot of people get confused because in the 1960s America had a significantly smaller and poorer population. Inflation adjusted means purchasing power, todays NASA budget can purchase 80% as much as NASA's average budget in the 1960s could. Purchasing power is different from how difficult it was to pay for. It is easier for us to pay for NASAs budget today because we are so much richer.

6

u/lespritd Jul 14 '21

A lot of people get confused because in the 1960s America had a significantly smaller and poorer population. Inflation adjusted means purchasing power, todays NASA budget can purchase 80% as much as NASA's average budget in the 1960s could. Purchasing power is different from how difficult it was to pay for. It is easier for us to pay for NASAs budget today because we are so much richer.

Additionally, some things, like ICs, are way cheaper than "inflation adjusted" would suggest. Other things, like additive manufacturing didn't exist at the time at all.

→ More replies (1)

18

u/TheSkalman Jul 13 '21

Do you think $25B is not enough development money before the first flight?! The problem lies not in the funding, but in the contracting schemes that NASA use.

16

u/jadebenn Jul 13 '21

A more constrained per-year budget actually tends to raise total costs, because people and infrastructure are paid for yearly. It's not mutually exclusive.

9

u/rough_rider7 Jul 14 '21

Good then that the choice to use old hardware, that made sure development timelines were short and they could do it in 5 years.

→ More replies (3)

0

u/[deleted] Jul 13 '21

[deleted] — view deleted comment

11

u/import_willtolive Jul 14 '21

I just want to say that you are the first person I’ve seen in an internet conversation about SLS to absolutely hit the nail on this topic. It’s shocking how few people are aware of why projects like this actually go over budget.

10

u/lespritd Jul 14 '21

It’s shocking how few people are aware of why projects like this actually go over budget.

I mean NASA does lots of projects. It seems like they're generally pretty on budget outside of the human space flight program (excepting JWST). That may be a reason why SLS is over budget and delayed, but it can't be the only reason.

8

u/import_willtolive Jul 14 '21

The reason is that big ticket projects like SLS or Orion suffer from this because they attract attention, while Congress doesn’t really differ from NASA’s requests for smaller projects.

6

u/rough_rider7 Jul 14 '21

Human space flight has suffered from serious political capture since after Apollo.

→ More replies (2)

10

u/rustybeancake Jul 13 '21

Yes, but also they didn’t get the surge in spending needed to do the programs simultaneously. They’re still getting the money, but sequentially rather than in parallel.

5

u/RRU4MLP Jul 14 '21

You have to remember, through most of the 2010s when SLS development was actually happening, their budget was closer to $17-18B. Also remember, unlike in the 1960s where NASA was 100% pushing towards the Moon and everything was a step to that goal, thats not the case anymore. ISS alone takes up just as much if not more funding than SLS a year. JWST, all the various probes and such, earth science, etc. So any money for a rocket has to come on a flat budget. That's actually stated as one of the 3 reasons that NASA went with the RAC-1 concept (current SLS) vs a RAC-2 concept (kerolox 1st stage SLS).

→ More replies (2)

9

u/dhibhika Jul 14 '21

So what you are saying is $20 Billion and 10 years was not enough to even match Saturn V while having:

  1. pre-existing flown engines (30-year history)
  2. pre-existing solid booster tech (30-year history)
  3. pre-existing GSE

7

u/shankroxx Jul 14 '21

Being constrained to use pre existing hardware probaboy led to this

4

u/[deleted] Jul 14 '21

Yep. Congress didn’t want to pay for another Saturn V, and keeping the same contractors as the Shuttle kept the same jobs for millions of people.

The Saturn V was a technology rocket. SLS is a Congress rocket.

7

u/rough_rider7 Jul 14 '21

The RAC2 (modern Saturn V) would have been cheaper probably. Even with the engine development.

millions of people

Not that many.

2

u/[deleted] Jul 14 '21

RAC2? I can’t find what you’re referencing?

Not that many.

Yes, I was exaggerating but to a congressperson, 8,000 jobs and a $1.35 billion dollar economic impact (as outlined in a NASA report in 2014) would be a big point for them.

5

u/rough_rider7 Jul 14 '21

There are a number of post on this sub about how the SLS was picked as a design. There was a contest between RAC1, RAC2, RAC3. Well, there were multiple different assessments and studies about what SLS would be.

RAC1 is more or less what SLS is now.

RAC2 was essentially a modern day Saturn V.

RAC3 being a pretty absurd Frankenstein rocket out of commercial rocket parts

You can read about the whole thing here:

https://www.reddit.com/r/SpaceLaunchSystem/comments/kt1vlf/rac_stuff_summary_kinda_idk_anymore/

→ More replies (4)
→ More replies (1)
→ More replies (2)
→ More replies (4)

3

u/[deleted] Jul 14 '21

However the SLS core stage can put the upper stage effectively into orbit, which the SIC and SII stages couldn’t (or could barely) do (the small ICPS stage helps with that), but the ICPS stage is also has a slightly better isp with the SIVB having 420 seconds and the DCSS (what the ICPS is based off of with minor upgrades) having 462 seconds. The SIVB had MUCH higher thrust, but with an upper stage, efficiency > thrust.

4

u/Xaxxon Jul 14 '21

The hats the part that makes you sad? Not the $20b development budget the years and years of delays and the $1b+ incremental cost of launch?