r/spacex • Mod Team • Sep 01 '17

r/SpaceX Discusses [September 2017, #36]

If you have a short question or spaceflight news...

You may ask short, spaceflight-related questions and post news here, even if it is not about SpaceX. Be sure to check the FAQ and Wiki first to ensure you aren't submitting duplicate questions.

If you have a long question...

If your question is in-depth or an open-ended discussion, you can submit it to the subreddit as a post.

If you'd like to discuss slightly relevant SpaceX content in greater detail...

Please post to r/SpaceXLounge and create a thread there!

This thread is not for...


You can read and browse past Discussion threads in the Wiki.

186 Upvotes

1.8k comments sorted by

2

u/[deleted] Sep 05 '17

I'am not so sure it has anything to do with money, or at least not exclusively. They have trouble with meeting LOC figures already. Because of that Nasa will try to make sure by extensive reviewing that every detail is designed the safest way possible. If there is any doubt, they might ask for additional tests or calculations to back up their design choice. Might seem unfair, but if they where in compliance with LOC figure with their preliminary designs Nasa had no grounds for these additional testing/changes. Nonetheless, al these extra design steps take time, maybe they expected to lose a lot more time reviewing and perhaps changing the design of landing hardware, setting their first test mission back to who nows where in 2018/2019. Sice they already have a second landing option, they chose to put their schedule first over the more badass landing option (unlike they did with FH, where new options and changes, along with some other things put it's launch date back to this point in time)

3

u/warp99 Sep 06 '17

if they where in compliance with LOC figure with their preliminary designs Nasa had no grounds for these additional testing/changes

NASA changed the goal posts by using a much more stringent model for MMOD risk. So not an issue that SpaceX caused.

1

u/JadedIdealist Sep 06 '17

It does seem to me that evaluation metrics for commercial contracts ought to be given up front as part of the contract.

2

u/warp99 Sep 06 '17

Yes - clearly SpaceX is surprised about the level of detailed evaluation of the design that NASA requires and their variation of the design standards. Under a normal cost plus contract the contractor is all for this kind of variation because it adds to the costs and therefore the profits.

Under a fixed price contract it is potentially a serious threat to have the standards being moved like this causing major design changes with no compensation.