r/spacex • u/ElongatedMuskrat Mod Team • Oct 23 '17
Launch: Jan 7th Zuma Launch Campaign Thread
Zuma Launch Campaign Thread
The only solid information we have on this payload comes from NSF:
NASASpaceflight.com has confirmed that Northrop Grumman is the payload provider for Zuma through a commercial launch contract with SpaceX for a LEO satellite with a mission type labeled as “government” and a needed launch date range of 1-30 November 2017.
| Liftoff currently scheduled for: | January 7th 2018, 20:00 - 22:00 EST (January 8th 2018, 01:00 - 03:00 UTC) |
|---|---|
| Static fire complete: | November 11th 2017, 18:00 EST / 23:00 UTC Although the stage has already finished SF, it did it at LC-39A. On January 3 they also did a propellant load test since the launch site is now the freshly reactivated SLC-40. |
| Vehicle component locations: | First stage: SLC-40 // Second stage: SLC-40 // Satellite: Cape Canaveral |
| Payload: | Zuma |
| Payload mass: | Unknown |
| Destination orbit: | LEO |
| Vehicle: | Falcon 9 v1.2 (47th launch of F9, 27th of F9 v1.2) |
| Core: | B1043.1 |
| Flights of this core: | 0 |
| Launch site: | |
| Landing: | Yes |
| Landing Site: | LZ-1, Cape Canaveral Air Force Station, Florida |
| Mission success criteria: | Successful separation & deployment of the satellite into the target orbit. |
Links & Resources
SpaceX stands down Falcon launch of clandestine Zuma satellite from NASA Spaceflight
SpaceX adds mystery "Zuma" mission... from NASA Spaceflight
We may keep this self-post occasionally updated with links and relevant news articles, but for the most part we expect the community to supply the information. This is a great place to discuss the launch, ask mission-specific questions, and track the minor movements of the vehicle, payload, weather and more as we progress towards launch. Sometime after the static fire is complete, the launch thread will be posted.
Campaign threads are not launch threads. Normal subreddit rules still apply.
15
u/peterabbit456 Oct 24 '17
It occurs to me this could be preparation against a scenario where Russia cuts off the supply of RD-180 engines before the contractual or treaty or legislated end date. The military likes to be prepared for every eventuality.
My thought when I wrote the above was that Atlas 5 comes in a dozen or more different models, from the Atlas 5, 4-0-1 to the rarely seen Atlas 5, 5-5-2. To do the quickest possible launch, ULA would have to keep an Atlas 5, 5-5-1 on hand, and launch it with fewer solid side boosters if a smaller payload is needed.
I think I have read elsewhere that what they actually do is to keep an almost finished Atlas 5 in the factory, and when a quick launch order comes in, they bolt on the necessary parts, mostly solid motor mounts, to finish it in the desired configuration. This process takes a couple of weeks.
With the combination of used boosters, 2 Florida launch pads, and a high cadence, I see little reason why SpaceX should not be able to launch faster than the second Atlas 5 scenario. The Air Force, etc., will want to keep multiple launch providers in business, so ULA, as the weaker company overall, will still probably get most of the military launch orders, but at this point the Russians are probably regretting their comment about the US having to launch using trampolines.