r/spacex • • Jan 06 '18

I passed through Pad 39A and take a photo of this... What is that? Can anyone tell me why there isn’t falcon heavy on the launch pad??

Post image
1.4k Upvotes

222 comments sorted by

1

u/CAM-Gerlach Star✦Fleet Commander Jan 14 '18

Understand Fairing 2.0 is a little larger which might help with Starlink. Generally they'll need lots of sats delivered to each plane.

By a small amount, yes. However, lets take a rough look at the numbers. We have 4,425 sats going to 83 orbital planes, which implies an average (though quite possibly not what is actually used in any plane) of 53 sats per plane. Their mass has been listed as between 300-400 kg, which is just under 2x that of Iridium (860 kg); let's be generous and assume 400 kg. Although it would seem volume should be the limiting constraint, which should scale linearly with mass, it is in fact most likely surface area on the dispenser, at least in the manner by which all previous satellites have been deployed. Invoking the square-cube law, this implies the satellites will have 45% of the mass, but 60% the dispenser surface area, and 75-80% the average length dimensions (of course, this all assumes the same density, which should be within the margin of error for a ballpark estimate such as this).

Looking at photos of the Iridium sats being encapsulated in their fairing, it appears that about one satellite's worth of space remains at the top of the fairing, albeit constrained by the radial dimension, so lets assume satellites are stacked 4 high inside (given this comes out to be a little more than the approximate length of one additional Iridium satellite). Furthermore, more can can fit the same diameter around the dispenser, which may be also increased somewhat in diameter, though not too much as the stack will be diameter-constrained near the top. Given again their relative dimensions and a 15% increase in the radius of the dispenser, 7 satellites can fit in the same space.

We can also calculate this another way, by assuming production sats are equivalent in dimensions and mass to the Microsat test satellites. The former assumption is likely at least approximately accurate, given it was stated they were testing the satellite bus, though given the satellites include test hardware and are likely not mass-optimized with more expensive materials at this point, and elsewhere a mass in the 300 kg range has been stated, at least a modest decrease in mass seems reasonable. In any case, going by the 1.1 m x 0.7 m x 0.7 m published specs, and assuming a 10 cm gap between satellites, this implies a satellite and dispenser arrangement similar to the above would have a height of 5.4 m, relative to a max fairing height of 6.7 m (as described in the F9 Payload User's Guide), and probably not reasonable to add another stack due to margins and implying a much higher center of gravity than the PAF can tolerate in the horizontal orientation—currently, the publicly available data indicates the maximum center of gravity height the PAF can tolerate near its max load is around 3m, or a total payload height of 6m assuming a homogeneous mass distribution.

On the diameter side, given the necessary diameter for an adapter of the appropriate circumference for 7 satellites, plus the depth of the satellites, plus the same 10 cm margins as before, this implies a radius of 0.9 m for the adapter plus 0.8 m for the satellites, implying an outer diameter of 3.4 m, which allowing for ~10-15% non-circularity due to the shape plus 0.1 m protrusions on the satellites themselves leads to a maximum diameter of 4.0 m, with a 0.6 m margin to the 4.6 m interior fairing wall. They could perhaps add one more satellite to the ring, but that would further increase dispenser mass and volume and allow only minimal margins to the end of the fairing.

Therefore, this (not coincidentally) gives a total number of 27-28 sats, half one average plane (i.e. two launches per plane), to be deployed each launch, which implies a 8,400-10,800 kg launch mass (plus, say, a 1,000 kg dispenser, a modest amount greater than Iridium and proportional to the sat mass increase). We know Block IV, with minor alternations, improved performance (likely mostly due to faster prop loading) past the point where Iridium, with 9,600 kg to an orbit only slightly lower than Starlink, can RTLS with enough margin to spare. Therefore, with the more substantial improvements in Block V, scaling the ~300-400 kg increase in expected GTO performance by the 2.8x greater LEO capacity and greater impact of gravity losses (thus thrust increases are more meaningful), so let's say 3x, we arrive at a minimum of 900 - 1200 kg more payload being able to RTLS over the current Iridium numbers, so right around 10,800 kg, our upper limit above even under relatively worst case assumptions (maximum expected launch mass, etc.). Therefore, it makes little sense to build more FH cores and refurbish two more cores, plus the greater risk of an in flight or landing RUD, and greater expense and resource utilization recovering all three, not to mention possibly building a West Coast pad and landing zones for FH, just to get at most a few more sats up there per launch, particularly when F9 can already do one average plane in two trips, and Falcon Heavy cannot do one in one, therefore there might be no savings whatsoever.

It's possible FH S2 could relight enabling sats to be delivered to multiple planes if necessary.

A plane change maneuver is a very Delta-V expensive and inefficient one, especially once in a low, high-velocity orbit, thus the chance of such happening is slim to none. Satellites could drift into different planes as Iridium does, but this would greatly delay their introduction into service and further limit their already tight on board fuel reserves.