On Friday, 6 November 2026, I travelled on the inaugural passenger journey of SNCF's TGV Nouvelle Génération, also known as the TGV M and based on Alstom's Avelia Horizon platform. The outward journey was operated by trainset 1011 on service 35081, the 09:56 from Paris Gare de Lyon to Marseille Saint-Charles. It arrived in Marseille at 13:05.
Many dignitaries, railway industry representatives and members of the press were onboard for the inaugural journey. Among those present was Jean Castex, President of SNCF, whom I saw during the event.
I returned from Marseille to Paris later that day on trainset 1014. The return service, 35080, departed Marseille Saint-Charles at 14:59.
The TGV Nouvelle Génération, developed under the TGV M programme, is based on Alstom's Avelia Horizon platform and is the fifth generation of France's TGV. Like earlier TGVs, each train has a power car at either end with articulated double-deck passenger coaches between them. However, the shorter power cars allow each train to accommodate nine passenger coaches rather than eight within approximately the same overall train length.
The initial TGV INOUI configuration has 573 seats. Passenger improvements include additional legroom, increased luggage capacity, eight spaces for assembled bicycles, improved Wi‑Fi, power sockets and a two-level bistro with a seating area on the upper deck. The train is also designed to allow wheelchair users to board and travel more independently.
The Alstom Avelia Horizon design is expected to use around 20% less energy than the previous generation, helped by reduced weight, improved aerodynamics and more efficient traction equipment. Its modular interior also allows SNCF to alter the balance between first-class and second-class accommodation during the fleet's service life.
The first TGV Nouvelle Génération trainsets are being introduced on services between Paris and Marseille, with the fleet subsequently being extended to other destinations. Their introduction begins the gradual replacement of older TGV equipment and follows an extensive testing programme covering approximately one million kilometres.
Here are some photographs I took of the inaugural trains and journeys.