👋 Hey, there. My wife and I just wrapped up building an ADU this summer and I thought I'd share some of our learnings and the numbers here.
We moved into our home in W. Colfax in Spring of '21. Our neighbor next door had already built an ADU on their lot just a few years before and were able to offer a lot of insight about the process and the flexibility of the space.
We really settled on the idea because it could serve us in many ways: we could live there and rent the house out, we could short/medium/long term rent it out, and it could be a place for friends and family during visits or extended stays.
With that in mind, we started talking to an architect in 2023. We went through a few iterations on the design. It was difficult to decide on how big it should be. We had a 20x20 garage in the back yard and if we wanted to use a similar footprint, the unit was going to be quite small. Ultimately, we settled on something that occupied the full width of the yard.
It took some time to land on a contractor. I spoke to many, with wide ranges of bids. As low as under $300k (somehow) and as high as $700k+. The project was hard to financially justify even at the low range, so I'm not sure who out there is hiring these folks at that end of the spectrum. We had gone into things in '23 with the hope of getting something done for around $350k.
I actually ended up finding our builder on Reddit after posting one of our bids in r/homebuilding. We got close with a couple others, but I really wanted to find "a guy" vs paying for a full-service construction company. I was fine being involved and we weren't in a rush to build because we were still saving. After some due diligence, we called it off with the other builders and chose Berner Construction.
A few years of aggressive saving later, we kicked off the build in Spring of '25. Things went really smoothly, minus a few small hiccups. Having an architect familiar with the city's ADU code was invaluable. There are a bunch of restrictions for how big it can be built and how it's designed, though things have been improving recently.
We got the Certificate of Occupancy in June of '26. All said and done, including the plans, permitting costs, and other misc. costs, we spent about $460k. We are really thrilled with the results. It's been a hit with friends and family, and the recreation space in the 2-car garage is a great extension of our yard. It's not finished yet, but that's the next project.
In the meantime, we've been using it as a STR since the summer where it's been well received, but we have arrangements for a friend to move into it in January to stay through the summer.
It's absolutely possible to build cheaper than we did. We made a couple of choices that added significant cost, but we figured if we're gonna go through with all of this, it might as well be something delightful that we love.
Happy to answer any questions if anyone has any.
Edit: Since this is getting some attention, wanted to plug the series I made on my YouTube channel that follows the build. 23 videos going through each stage of construction, with a full cost breakdown at the end. https://www.youtube.com/playlist?list=PLCfmomANv8vG6ThDMl3MWIaQs-9dNbAsM