r/spacex • NASASpaceflight.com Writer • Sep 06 '17

Multiple Updates per McGregor Engineers

3 McGregor engineers and a recruiter came to Texas A&M yesterday and I was able to learn some pretty interesting news:

  1. Yesterday (September 5), McGregor successfully tested an M1D, an MVac, a Block V engine (!), and the upper stage for Iridium-3.
  2. Last week, the upper stage for Falcon Heavy was tested successfully.
  3. Boca Chica is currently on the back burner, and will remain so until LC-40 is back up and LC-39A upgrades are complete. However, once Boca Chica construction ramps up, the focus will be specifically on the "Mars Vehicle." With Red Dragon cancelled, this means ITS/BFR/Falcon XX/Whatever it's called now. (Also, hearing a SpaceX engineer say "BFR" in an official presentation is oddly amusing.)
  4. SpaceX is targeting to launch 20 missions this year (including the 12 they've done already). Next year, they want to fly 40.
  5. When asked if SpaceX is pursuing any alternatives to Dragon 2 splashdown (since propulsive landing is out), the Dragon engineer said yes, and suggested that it would align closely with ITS. He couldn't say much more, so I'm not sure how to interpret this. Does that simply reference the subscale ITS vehicle? Or, is there going to be a another vehicle (Dragon 3?) that has bottom mounted engines and side mounted landing legs like ITS? It would seem that comparing even the subscale ITS to Dragon 2 is a big jump in capacity, which leads me to believe he's referencing something else.

One comment an engineer made was "Sometimes reddit seems to know more than we do." So, let the speculation begin.

897 Upvotes

358 comments sorted by

View all comments

78

u/rustybeancake Sep 06 '17

Thanks for the great info!

Boca Chica is currently on the back burner, and will remain so until LC-40 is back up and LC-39A upgrades are complete. However, once Boca Chica construction ramps up, the focus will be specifically on the "Mars Vehicle."

Just trying to clarify: do you mean that engineers will be working on the Boca Chica construction somehow, and once done they'll shift to designing the Mars vehicle? Or something else?

When asked if SpaceX is pursuing any alternatives to Dragon 2 splashdown (since propulsive landing is out), the Dragon engineer said yes, and suggested that it would align closely with ITS.

This seems to fit with what Garrett Reisman said a month ago:

Reisman: "Yeah, so I can tell you that, um, that we are... one of the reasons that we're not as keen on demonstrating it with Dragon is that we've come up with a different... a slightly different plan of how we're going to do Entry, Descent & Landing with the big ship on Mars. And that's all I'm going to say about it because Elon's going to say it much better and with a lot of awesome graphics and animation, so... he's going to do that in Australia so I encourage all of you to tune in at IAC in Australia and Elon's going to tell the world about what we have in mind."

Again, it's hard to tell if they mean the ITS EDL method shown last year at IAC or something a bit different.

35

u/shaggy99 Sep 06 '17

This sort of thing is the big difference between SpaceX and NASA. Once committed to a design path, NASA has a strong tendency to keep on churning through the issues and making an attempt to perfect it and iron out all the bugs. Once the bureaucracy is in place, it's very hard to shift tracks. In this case, it seems like SpaceX has seen that the original idea for Dragon isn't workable as such, so they're going to keep perfecting it for the client, (NASA) so they can make the promised deliveries, but they’re also kicking off a new design that has better potential for future endeavours.

Looking forward to the IAC and hoping for better vetting of the questions. I would have been so embarrassed if I'd asked some of those questions.

15

u/[deleted] Sep 06 '17

But NASA never wanted propulsive landing. Dragon fills all other requirements. And remember that Spacex is on a fixed price contract. They have no incentive to go above and beyond because they are only getting paid ~2.4B to meet all requirements. So dropping a feature, actually helps. Especially since it was probably something NASA was not looking forward to certifying.

6

u/shaggy99 Sep 06 '17

Well, quite, but I wasn't specifically talking about propulsive landing.

My point was that once on any specific path, NASA and the large bureaucracy, has a lot of momentum to an idea. I may have an unfair attitude to NASA though, I am not an expert, but that is the impression I get from outside.

Of course SapceX is on a fixed price contract, for NASA, but they can use the Dragon design for other stuff, (are they still talking about using it for the manned trip around the moon?) so if it made sense, they could have carried on with it, but have now dropped it for something better. (apparently)

12

u/burn_at_zero Sep 06 '17

My outsider's perspective is that NASA is tremendously flexible during the design phase. Any approach to meeting the mission's design requirements will be considered, even low-probability ideas. Once a large field of possibilities are developed, ruthless pruning is performed until the designs are settled and TRLs are high enough to reasonably assure success.

From that point on, the path is the path. Deviating from it means discarding the results of years of modeling, planning, research and development. It also means introducing new sources of risk late in the process. Historically, late changes cause incidents, delays and cost overruns. Every effort is made to avoid this, so a lot of effort is poured into the planning phase and early testing.

Of course, if the mission requirements change when they are already building hardware then there's no good mitigation strategy.

5

u/PaulL73 Sep 07 '17

One of the advantages of having such a hands on CEO. Elon's in a place where he can listen to everything and then go "you know what guys, I've heard what you've said and that's just not gonna work. Let's go with that other idea you had over there instead." Inertia is often about inability to make painful decisions - Elon doesn't seem to suffer from that.

→ More replies (1)
→ More replies (1)

3

u/MauiHawk Sep 06 '17

Agile. It'd be fun if SpaceX actually worked in 2-weeks sprints like I do...

3

u/warp99 Sep 06 '17

Hardware design is not quite like that because there is more inertia and much longer leadtimes in the process - but we do work in approximately 3-6 month sprints that are called prototype cycles.

Source: Hardware design engineer embedded in a 90% software engineer design lab - and they do use sprints.

→ More replies (1)
→ More replies (2)

53

u/TGMetsFan98 NASASpaceflight.com Writer Sep 06 '17

In regards to Boca Chica, I mean that once their construction resources are no longer needed at the Cape, that the facilities constructed at Boca Chica will be for the Mars vehicle. In other words, expect ITS to launch from there.

28

u/avboden Sep 06 '17

I think it means they'll build the flame trench big/strong to handle it, but clearly no other sort of hardware is going to be ready yet. It'll launch falcon 9s for a good while first

23

u/imrys Sep 06 '17

If the first maned mission to Mars launches from there it will make Boca Chica go from some empty dirt in the middle of nowhere to one of the most famous places in the world.

9

u/somewhat_pragmatic Sep 07 '17

That sounds very similar to the timeline that Kitty Hawk, NC took.

The Wright brothers chose it because someone collected and published wind data and found it was consistently windy. So very specific geography was chosen in the middle of nowhere to make the most optimal conditions for flight. That sounds identical to Boca Chica.

15

u/Chairboy Sep 06 '17

Whoa, this is a pretty big change. Interesting, there's roughly 15 miles of no houses/buildings northwestwest approaching the SpaceX facility along the path that matches the inclination they're most likely to launch to (threading the needle between Cuba/Jamaica/Haiti etc).

Perhaps there will be a concerted effort to implement a glide-path/terminal approach into BC for orbital vehicles launched out of it.

Will ~18 (or whatever the exact inclination) become the 'Martian Orbit' because it's used for Mars staging? How much of a leap would it be for a natural-gas liquification plant to expand to also do O2 liquification? Seems like a useful piece of infrastructure for a hypothetical super-high throughput future launch facility.

→ More replies (3)

7

u/CProphet Sep 06 '17

expect ITS to launch from there

Makes sense, they've filled in one of the flame trenches at LC39A so it probably can't handle even a 9m mini-ITS. Also they need two operational pads at the Cape for redundancy, in case of another AMOS-6. Boca Chica seems more practical for BFR, considering its a little closer to the equator. Doubt NASA wants to give up LC-39B considering they plan to launch SLS there.

7

u/Captain_Hadock Sep 06 '17

they've filled in one of the flame trenches at LC39A so it probably can't handle even a 9m mini-ITS

Didn't Saturn V launch from LC39A? (And wasn't the pad build to handle an hypothetical Saturn 8?)

4

u/CProphet Sep 06 '17

Yes they were even thinking about launching a Nova Mars rocket eventually, which was even more powerful than Saturn V. However, the ITS design has twice the thrust of the Nova. Even if they downsize ITS it will probably be too much thrust for LC-39A to handle, if they can only use half of its flame duct capacity. Unfortunately If they reopen flame duct I believe the exhaust would direct towards the HIF - which is probably why they decided to close it off originally.

4

u/rustybeancake Sep 06 '17

Doubt NASA wants to give up LC-39B considering they plan to launch SLS there.

Supposedly NASA are actively looking to lease 39B as a multi-user pad, whereby each user moves their own MLP onto it. Anyway, SLS is hardly going to keep it busy! :)

4

u/CProphet Sep 06 '17

Heard Orbital ATK plan to use LC-39B for their NGL launcher. Solids are an easy shoe-in, however, a methalox launch vehicle like ITS might require some extra plumbing. Also ITS will probably require an embedded launch stand because SpaceX plan to launch and land it from the same pad. If that's still the plan after IAC 2017.

→ More replies (6)
→ More replies (1)
→ More replies (1)

16

u/flattop100 Sep 06 '17

we've come up with a different... a slightly different plan of how we're going to do Entry, Descent & Landing with the big ship on Mars.

Part of me really hopes they've developed a magnetic field system, and that they're going to implement it on ITS first stage.

17

u/zeekzeek22 Sep 06 '17

Ever since that NASA advanced technologies competition thingy advanced the magnetic plasma field for aerobreaking to level 2 like two years ago, I've been super eager to see who ends up jumping on that technology. If SpaceX does, it'll be awesome and fit right in with a lot of their ideas. I wish I could remember what that program is called, they spotlight/support a lot of cool new tech there, like this ultra-white paint that significantly decreases a spacecraft's heating compared to the existing "space-white"

12

u/jonwah Sep 06 '17

NASA Innovative Advanced Concepts? They do a heap of crazy stuff - reading their proposal list is like a science fiction fan's wet dream https://www.nasa.gov/content/niac-overview

17

u/kuldan5853 Sep 06 '17

So, when you are coming in for reentry, the "Captain" will be on the "Bridge" and state "Shields to Maximum! Prepare for turbulences! All Power to the structural integrity field!"?

...that's a future I can live with. Yep, can totally live with. And then you might also ask the brits to install some tea dispensers for some "Earl Grey, Hot" while you're landing...

→ More replies (1)

5

u/Martianspirit Sep 06 '17

Magnetoshell aerobraking yields a lot of hits in Google.

4

u/zadecy Sep 06 '17

Mag-braking could also be a technology that helps with reuse of the Falcon second stage, if it's lighter than a traditional heat shield.

You'd think they'd have to test it on a small scale in Earth orbit anyway, so why not add the system to the second stages on easy LEO missions.