In our project, CL9 and above roles are expected to have larger capacity, which more work is expected to them because of the initial capacity points I saw before that are set to them. But right now, it looks to me that some of my team members with high CLs are hesitant to accept more work, and instead I always have been assigned to do the opposite (having a larger scope of workload than them). How do you deal with this situation? Assume you are the lowest CL (CL10) that feels unfair to accept larger scope of work because of the salary.
A. Burn the bridges by looking for a greener pasture
B. Delay the completion of my current items
C. Accept smaller work to temporary fill the hole, avoiding more work
D. Others. Pls specify ___