r/ArduinoProjects • u/Confident_Ring5246 • 3d ago
Project Design/Guidance Powering 12 MG90s servos
I need to power 12, MG90s servos. From what I can tell, this will require 5V, and about 3A.
I tried using a MB102 breadboard power module connected to a power plug, but this wasnt enough, so what power supply board can i use, and what battery do i connect to the power supply board, since i want it to use a battery instead of a power plug
4
Upvotes
2
u/jfc62 3d ago
Battery size depends on how long you want to run them. I would use 2s lipos with beefy step down / buck converters.
1
u/OkProperty41 2d ago
The earlier reply about a 2S LiPo into a beefy 5V buck is the right shape. I'd also revisit the 3A figure.
Tower Pro's MG90S page quotes stall torque at 4.8V (1.8 kg·cm) and 6.6V (2.2 kg·cm), and speed at 4.8V and 6.0V, and it says to power the servo from an external adapter. It does not publish a stall current. In this class of micro servo, stall is commonly well over half an amp each. If several of the 12 stall or start at once, 3A will sag. I'd size the 5V supply as if they can all stall together, which means a 10A-class buck is the comfortable choice, and use short, thick wires.
The MB102 breadboard supply is why the first attempt fell over. Those modules are a small linear regulator feeding breadboard rails, and they are a poor match for a dozen servos. Keep servo power off the breadboard and off the Arduino's 5V pin.
A practical setup:
- 2S LiPo (7.4V nominal, 8.4V full) into a 5V buck rated for that stall budget, or a 5-6V pack if you already have one that can deliver the current.
- All servo red wires to the buck's 5V, all brown wires to the buck's ground.
- Tie that ground to the Arduino GND so the signal pulses have a return path.
- Orange/yellow signal wires only to the Arduino pins.
- A large electrolytic cap across 5V and GND at the servo power distribution, to help the buck through the startup spikes.
Battery size then depends on how long you want it to run under typical motion, not under a 12-servo stall. If you give a target runtime, the pack capacity is easier to pin down.