Hey everyone, looking for advice from people working in residential construction...
I'm looking to book a pre-construction house in Okotoks / Calgary area and I'll have about 1 to 1.5 years before possession.
If you were in my shoes, sitting at the table with the builder, what are the things you'd make sure to get done NOW in the rough-in stage — before drywall goes up?
Specifically looking for perspective from:
1. HVAC guys — Furnace size, HRV, AC rough-in, ductwork, garage heater gas line? What do homeowners always regret not getting?
2. Plumbers — Basement rough-in, gas stubs, water softener loop, 3/4" main? What is cheap now but crazy expensive later?
3. Residential Electricians — 200A panel, EV charger, Cat6, pot light rough-ins, extra outlets? Where do builders overcharge the most?
I don't want to pay builder prices for fixtures I can do myself later. I want to pay for what is inside the walls and save money long-term.
What are the non-negotiables you'd fight for, and what are the traps to avoid in the contract?
Trades guys — booking a pre-construction home, possession in 1-1.5 years. If you were buying, what HVAC / plumbing / electrical rough-ins would you INSIST the builder do now? What is cheap now, expensive later, and what upgrades are a total rip-off?