r/DataAnnotationTech • • 3d ago

Six months in and...

...I still feeling guilty claiming 100% of the ceiling time on a project, even though I actually worked 120% of that time 🤣

They can have some of the "waiting for responses" time on me. They've been good to me.

19 Upvotes

34 comments sorted by

29

u/Mysterious_Dolphin14 3d ago

Are you saying that you under report your time? Because, don't under report your time, and don't feel guilty about it if you're actually working.

ETA: "actually working" includes waiting for models to respond, etc. ANYTHING that is required to complete the task is actively working.

11

u/sansmorixz 3d ago

Depends. Some projects last 1-2 weeks and it’s expected that model would run for hours sometimes even multiple days. You aren’t expected to report time waiting for those.

8

u/Mysterious_Dolphin14 3d ago

Good point. It's always important to follow the instructions in those cases.

5

u/The_7thHokage 3d ago

Waiting for model response is not considered as actively working. In some projects this model generation turn can take couple of hours. And in those projects its specified to not consider as work time when you just waiting.

3

u/YogurtclosetNo770 2d ago

If you submit your time over what they allow you to report, you’ll stop getting projects.

1

u/johnnycoconut 2d ago edited 2d ago

(Edit: I misunderstood and thought you were talking about the timer. Ugh, I should probably go to bed.)

In my experience that hasn’t always been the case. Granted, things could have changed or it could depend on the project.

1

u/hwertz10 5h ago

Most likely.

Although I've seen like one or two projects (that must have been running for a while) where they had part of the instructions about the length of time given, and it had been crossed out and extended several times. I only got on these with the "most recent' time, but given the rest of the instructions had not been extensively overhauled, that implied to me they found the time they originally gave was simply inadequate. I mean, after all the people setting up the projects are human (... I mean, I assume... of course if they have an AI setting up a project it could also underestimate how long it takes a regular ol' human to complete the given tasks.)

2

u/johnnycoconut 2d ago

I agree insofar as I’ve advocated on multiple occasions to report the time worked.

With that being said, I notice a concerning trend lately where project instructions will stipulate a hard maximum for time reporting without even something like a ā€œtell an admin if it’s going to be moreā€.

1

u/hwertz10 5h ago

Yeah, I've seen projects that specifically say work time includes waiting for the responses; a few that said it does *if* you are watching it as it processes (i.e. it shows thought process as it's going); and a few that say that time is not included (and in general on those, the system does not show it as it's going, only shows the response when it's completely finished). A few of these actually specifically allow working on other projects during that time (and give a large enough time window that you are unlikely to go over the alloted time just because you didn't frequently check and get back as soon as the model finished thinking.)

7

u/Worth_Priority_8870 3d ago

I have been way under the ceiling so far on everything I completed. Don’t see any reason to pad the hours, since so far I have been really pushing to get it in around other independent contracting.

7

u/RightAd2304 3d ago

I’m doing design tasks and each turn takes more than an hour to generate. Feeling bad about charging for that.

-8

u/Worth_Priority_8870 3d ago

I don’t think you are supposed to report that time unless you are doing other things for the project while it’s generating.

2

u/RightAd2304 3d ago

There seems to be mixed opinions.

-5

u/Worth_Priority_8870 3d ago

By whom? The onboarding instructions say to pause a timer when not actively doing work on a project.

4

u/yungassed 2d ago

You are doing work though. Those tasks would be at a massive disadvantage to get picked otherwise. Since you can typically only have one active project, if 2 projects where both 6 hours long but the design one spent half of it generating and you couldn't bill for that time, no one would ever pick them over the 6 hour ones that were considered work the entire time.

If the platform allowed you to have multiple projects active then i could see a little more validity for you side of things

1

u/RightAd2304 1d ago

That’s where I’m at. I’ve had comparing tasks where you can keep running multiple conversations while the tasks running but for these tasks that art heavy I’m not able to take any other tasks.

3

u/RangerOriginal6632 2d ago

Don’t report more than the timer allows. You can leave a note in the comment box saying you think more time should be given for that particular task.

1

u/Hot-Rip7322 1d ago

Totally unrelated but how much have u made in 6 months

-2

u/Ordinary_Round3928 3d ago

I have completed the 3 onboarfing courses , submitted the Math knowledge assessment just now . I see a survey asking, if I I have access to Math projects? How do I know if I have access?

-21

u/Last-Direction521 3d ago

I applied to the platform as an engineering domain expert and did the starting assessment two months ago - I'm still waiting to hear back šŸ˜®ā€šŸ’Ø

9

u/Klutzy_Instance_4149 3d ago

If it's been 2 months, that usually means you didn't get the job.

-4

u/Single-Owl2771 3d ago

An agency reached out to me called MSH. When I clicked on the link it said ā€œagency partnerā€. Do you think I have a higher chance of getting in because of that

8

u/Klutzy_Instance_4149 3d ago

Data Annotation Tech doesn't work with recruiters or use talent acquisition companies. Anyone saying otherwise is a scam. The only way to get a job with DAT is to apply directly. So, no. MSH is not an agency partner of DAT and can't help you get a job there.

2

u/data_annotator_tot 2d ago

This is probably broadly true, but it's not universally so. I got hired by DAT as they were a client of mine on a freelancing platform. (Granted this was many years ago, but I am certain there are others like me, as well.)

2

u/Single-Owl2771 3d ago

Check this out

6

u/Klutzy_Instance_4149 3d ago

Holy smokes!! Color me wrong. DAT always say they don't partner with anyone. I retract my statement.

0

u/Single-Owl2771 3d ago

Yeaaa I’m new to DAT. Can you tell me what this means? Is it worthy to do the long assessment for mechanical engineering

2

u/Aggravating_Run8950 3d ago

If you have the skills to pass the assessments, yes it will be worth. Probably very worth given your domain.