r/DataEngineeringPH • u/AdStreet2258 • 1d ago
🆘 Help First day full time, no contract, and they want the whole medallion architecture done in Three Weeks. Is that real?
Hi everyone. I am the only person building this whole medallion architecture. I just finished a two-week trial as a data engineer at a startup, and today is my first day full time. There is no contract yet. They want the whole medallion setup finished this Saturday. We started from scratch on day one of the trial. Is that actually possible?
Medallion here is three layers, and the screen is a fourth stop that is not a layer.
Bronze saves the original file exactly as it arrived, with a note of which run saved it, and nothing is cleaned. Silver turns that file into one stable row per real thing, cleans dates, money, and yes/no, leaves blanks empty, and keeps every older version. Gold is the short list one screen needs, and it only stores the Silver id for that list. The app keeps its own table, and a total the screen calculates is not a Gold row.
A safety check sits between Bronze and Silver. The clean load stays switched off until that check passes on a real saved file.
About twenty data sources are in scope. In the two weeks we got this far:
- About ten sources have a Bronze file that already passed its save check.
- Six safety checks are written. Two of those are done. Four have never been run on a real saved file.
- Four safety checks are not written yet, and they all edit the same program, so they have to land one at a time.
- A few sources are parked on purpose, waiting on a business sign-off or a broken download.
- Gold is only partly built. The app is not reading this pipeline yet.
Every source walks the same path: a one-page job card, a QA script that includes the bad paths, a fake-data test, a local run with the clean load still off, one review, a human merge that updates the test environment only, a real run of the saved file plus the save check and the safety check, a small follow-up if that fails, and only then may the clean load be turned on, with Gold publishing the list and the screen connection left for later.
My read is that Saturday can cover a couple of those safety checks if someone is free to merge and to run production. It cannot walk about twenty sources through Bronze, Silver, Gold, and the screens. The two weeks got the raw files started. The rest is the long part. Would you tell them Saturday is the wrong finish line, or am I missing a way to cut this down?