r/Decks • • 2d ago

Building a deck Comments on Initial Deck Design

Post image

I ripped out my 20+ year old deck that someone built (the posts were rotting, glad I pulled it off when I did).

I used Simpson strong ties deck designer for most of this, but of course the addition that was put on my house was at a 30 degree angle not a 45 degree so it wouldn’t work exactly in the program.

Based on code I could use 2x8 joists and 16” centers but was going to use 2x10s and 12” centers just because I’m an over designer. If that’s dumb, I’ll just do 2x8s on 12” centers.

I read the important parts of my county’s code and put it in the AI to pull other important info and between all that I’ve arrive at this. I’d appreciate any comments before I start. I found these (below) to use for the 30 degree hangers but if anyone has a better suggestions I’m all ears. I might also put some SDWS screws or leger lok screws through the skewed joists into the ledger board for extra support.

I’m going to make sure the stairs land on something other than dirt and make sure the ledger board is adequately waterproofed. Any other tips are appreciated!

https://www.fastenersplus.com/products/simpson-lssr210z-field-adjustable-rafter-hanger-zmax-finish?utm_term=&utm_campaign=&utm_source=adwords&utm_medium=ppc&hsa_acc=3477180114&hsa_cam=24147944867&hsa_grp=&hsa_ad=&hsa_src=x&hsa_tgt=&hsa_kw=&hsa_mt=&hsa_net=adwords&hsa_ver=3&gad_source=1&gad_campaignid=24147948365&gclid=Cj0KCQiAworYBhDoARIsAP5ft3JcZFfOPltOim5A746jnyrgNoG9oueP_bflX6g-NDORTaFSSgP5QZEaAnhzEALw_wcB

0 Upvotes

22 comments sorted by

11

u/Valuable-Leather-914 2d ago

Where do these stupid plans come from? I built a shed last week and the homeowner gave me one which he immediately changed and made bigger after I bought the lumber.

6

u/ol-heavy-kevy 2d ago

"Chat gpt said this should only cost $1200 to build"

-1

u/J0SH_P0INT_0H 2d ago

But that’s really annoying.

-1

u/it_is_raining_now 2d ago

These plans are good for preliminary purposes

-5

u/J0SH_P0INT_0H 2d ago

Chat GPT. They are mostly stupid when people just take what the AI says as gospel and fail to check what it’s spitting out. If the Simpson strong tie program let me do 30 degree angles I would have put that in here but it won’t.

8

u/Fulaw60 2d ago

Don’t need that many posts on a 17.5 foot span with double 2x10. 

7

u/phi1_sebben 2d ago

Because ai doesn’t know. It’s literally just spitting out what it has seen.

-1

u/J0SH_P0INT_0H 2d ago

I actually got 5 footers in the Simpson strong tie deck designer that’s why I used 5. It seemed like a lot from my untrained eye, but am going back now to calculate and see if 4 will be up to spec.

2

u/Many-Blueberry968 2d ago
  1. You likely only need 3 or 4 piers, 5 seems excessive.
  2. I wouldn't use 2x8 to span 14' regardless of code and 12" spacing, it's gonna be bouncy under load. 2x10 @ 12" is probably nice and sturdy.

2.1 the alternative is 2x8 at 16" spacing if you insert a midspan beam with its own 3 piers. Doing this would likely allow your outer beam to use only 3 piers also.

3. The diagram is nutty in its beam post connection, basically showing as a 4x4 post. Make sure you look up actual notching directions.

3.1. The better approach may be a 3-2x8 beam sitting on 6x6 posts. Sturdy as a rock and the post saddles are inexpensive.

1

u/J0SH_P0INT_0H 2d ago

This is exactly what I was hoping for, really appreciate the comment!

  1. Noted
  2. Yeah that’s what I was thinking and why I thought the 2x10 at 12” OC made sense.
    2.1 do you think this makes more sense? From my perspective id rather hang more and beefier 2x10s than drill more holes and mix more concrete simply because I think it’s probably a bit less labor intensive since I’ll be renting a 2 person or tow behind auger and hand mixing concrete.
  3. Yep I’ve done a lot of research on how to properly notch the 6x6s. It’s just the shit AI diagram.
    3.1 Hmmm never thought of this. Would they fit exactly to the edge of the 6x6 (I forget the exact measurements of the 6x6s)

1

u/Many-Blueberry968 2d ago

2.1 - it's probably easier to go with beefy joists, but a midspan beam would make the whole deck stronger and reduce the (very small) risk that your ledger fails. But keep in mind that 2 beams with 3 piers each really isn't that much more difficult to do than putting 5 piers along the single beam (assuming that load Calcs dont let you reduce that to 4 as I had noted in #1).

3.1 - 3ply beam will be about 4.5-4.75", while the 6" post is about 5.5". There are saddles designed for this exact connection. https://www.homedepot.ca/product/simpson-strong-tie-bcs-zmax-galvanized-post-cap-base-for-double-3x-beam-6x-post/1001400217

1

u/J0SH_P0INT_0H 2d ago

Also forgot to say sorry for the shitty AI drawing. Especially the top view, it’s bad lol.

1

u/blueberries105 2d ago

Joist space can also depend on what decking you are planing on useing. Wooden decking you can space joist 16in oc. Composite and pvc often is 12in oc. I like to go 12in oc on all composite and pvc

2

u/J0SH_P0INT_0H 2d ago

Yeah it’s pvc and while it says you can go 16” OC my deck guy was like if you’re going to be at the house for a long time it’s worth it (going 12” OC)

1

u/Environmental_Tap792 2d ago edited 2d ago

This is ludicrous.
Builder for 40 years at 6,000 ft elevation. Never seen anything as labor intensive as this set of plans.
12”oc joists, 2x10, double 2x10 girder that is notched over the posts.
The notching is unnecessary and destroys structural integrity, the SDS two rows is fine but why not use a 4x10 or similar? Knife plate post attachment is far stronger and is 90% hidden.
No call out for standoff post bases, no call out for decking.
Assuming the yellow pine call out, this is in the southern US, this is way over engineered.
My apprentice could draw you a better more appropriate set of plans.

1

u/J0SH_P0INT_0H 2d ago

I posted this in here because I was hoping for feedback like this. I am not a builder and just a DIYer and understand it’s over engineered but I’m not trying to make a profit im just trying to make it nice while saving 20+k. So over engineered might cost me an extra $800 but it will save me tens of thousands over having someone do it.

I appreciate the advice though.

1

u/Environmental_Tap792 2d ago

If you can save that much, more power to you!

2

u/Extreme-Awareness478 2d ago

I’m a little confused are you planning a flush beam or a drop beam deck? These diagrams strange. Drop beam is far superior to flush beam but in these pictures there’s no cantilever or very small. With a deck of this size as a drop beam you only need 4 footers.
12-16” diameter concrete footers 3-4” deeper than frost line. Tamp the holes a lot and fill them with concrete rent or buy a Vibrator ($120) harbor freight. Sink 3-4 rebars #4 in concrete. The top of the sonotube should be 4-6” higher than grade. Trowel and leave it alone.
Begin preparing the ledger to house connection measurements if you can access the rim board of the basement you can get a better idea the construction of the house. Is it a floor truss system like web truss or wood I beam or a standard 2x10/12 joist. All that stuff is very important later on when you are putting tension ties on.
Back to the rim: put a self adhesion butyl membrane tucked under the siding 3” all around,
After the ledger is secured properly, tuck under ledger flashing.
The rest of this is everything you are looking at now.

1

u/RevolutionaryGas778 2d ago

The post and beam connection doesn't make sense. I think you're over complicating it.

1

u/Working_Rest_1054 2d ago

It’s a fine start. Deeper joists 12” oc is a good idea, to the extent you have 6” or more clear under the joists to the ground surface.

The double 2x10 beam should ideally be a 4x10, if available in your area (one less place to rot). No need to notch a 6x6 either, use a 4x4 with a post cap.

The dimension of the joist span is incorrect, in either the plan view or the joist cantilever section view (by the width of the beam).

The plan view omitted the 1’-6” joist cantilever, so don’t use the 13’-0” dimension to actually cut anything.

Don’t use a boarder that raised above the deck surface, that’s a wonderful trip hazard. Not to mention a nice place for rot to develop. If you want a picture frame, then build a proper one. Put the facia under the decking, not over the edge/end of the decking.

Make sure you have at least 6” ground clearance under the drop beam. If not, use a flush beam and get rid of the joist overhang.

Have fun.

-1

u/TipperGore-69 2d ago

Oh Jesus

1

u/BLACKtoothDIME 2d ago

2x10 @13’ is a hard no. That thing will be bouncy asf. Generally the 2x? Should Match the length. You can go 1’ over but absolute max. You could split the difference between that and the cantilever by using 2x12 joist