r/Decks • u/J0SH_P0INT_0H • 2d ago
Building a deck Comments on Initial Deck Design
I ripped out my 20+ year old deck that someone built (the posts were rotting, glad I pulled it off when I did).
I used Simpson strong ties deck designer for most of this, but of course the addition that was put on my house was at a 30 degree angle not a 45 degree so it wouldn’t work exactly in the program.
Based on code I could use 2x8 joists and 16” centers but was going to use 2x10s and 12” centers just because I’m an over designer. If that’s dumb, I’ll just do 2x8s on 12” centers.
I read the important parts of my county’s code and put it in the AI to pull other important info and between all that I’ve arrive at this. I’d appreciate any comments before I start. I found these (below) to use for the 30 degree hangers but if anyone has a better suggestions I’m all ears. I might also put some SDWS screws or leger lok screws through the skewed joists into the ledger board for extra support.
I’m going to make sure the stairs land on something other than dirt and make sure the ledger board is adequately waterproofed. Any other tips are appreciated!
11
u/Valuable-Leather-914 2d ago
Where do these stupid plans come from? I built a shed last week and the homeowner gave me one which he immediately changed and made bigger after I bought the lumber.
8
u/Fulaw60 2d ago
Don’t need that many posts on a 17.5 foot span with double 2x10.
2
u/Many-Blueberry968 2d ago
2.1 the alternative is 2x8 at 16" spacing if you insert a midspan beam with its own 3 piers. Doing this would likely allow your outer beam to use only 3 piers also.
3. The diagram is nutty in its beam post connection, basically showing as a 4x4 post. Make sure you look up actual notching directions.
3.1. The better approach may be a 3-2x8 beam sitting on 6x6 posts. Sturdy as a rock and the post saddles are inexpensive.
1
u/J0SH_P0INT_0H 2d ago
Also forgot to say sorry for the shitty AI drawing. Especially the top view, it’s bad lol.
1
u/blueberries105 2d ago
Joist space can also depend on what decking you are planing on useing. Wooden decking you can space joist 16in oc. Composite and pvc often is 12in oc. I like to go 12in oc on all composite and pvc
1
u/Environmental_Tap792 2d ago edited 2d ago
This is ludicrous.
Builder for 40 years at 6,000 ft elevation. Never seen anything as labor intensive as this set of plans.
12”oc joists, 2x10, double 2x10 girder that is notched over the posts.
The notching is unnecessary and destroys structural integrity, the SDS two rows is fine but why not use a 4x10 or similar? Knife plate post attachment is far stronger and is 90% hidden.
No call out for standoff post bases, no call out for decking.
Assuming the yellow pine call out, this is in the southern US, this is way over engineered.
My apprentice could draw you a better more appropriate set of plans.
2
u/Extreme-Awareness478 2d ago
I’m a little confused are you planning a flush beam or a drop beam deck? These diagrams strange. Drop beam is far superior to flush beam but in these pictures there’s no cantilever or very small. With a deck of this size as a drop beam you only need 4 footers.
12-16” diameter concrete footers 3-4” deeper than frost line. Tamp the holes a lot and fill them with concrete rent or buy a Vibrator ($120) harbor freight. Sink 3-4 rebars #4 in concrete. The top of the sonotube should be 4-6” higher than grade. Trowel and leave it alone.
Begin preparing the ledger to house connection measurements if you can access the rim board of the basement you can get a better idea the construction of the house. Is it a floor truss system like web truss or wood I beam or a standard 2x10/12 joist. All that stuff is very important later on when you are putting tension ties on.
Back to the rim: put a self adhesion butyl membrane tucked under the siding 3” all around,
After the ledger is secured properly, tuck under ledger flashing.
The rest of this is everything you are looking at now.
1
u/RevolutionaryGas778 2d ago
The post and beam connection doesn't make sense. I think you're over complicating it.
1
u/Working_Rest_1054 2d ago
It’s a fine start. Deeper joists 12” oc is a good idea, to the extent you have 6” or more clear under the joists to the ground surface.
The double 2x10 beam should ideally be a 4x10, if available in your area (one less place to rot). No need to notch a 6x6 either, use a 4x4 with a post cap.
The dimension of the joist span is incorrect, in either the plan view or the joist cantilever section view (by the width of the beam).
The plan view omitted the 1’-6” joist cantilever, so don’t use the 13’-0” dimension to actually cut anything.
Don’t use a boarder that raised above the deck surface, that’s a wonderful trip hazard. Not to mention a nice place for rot to develop. If you want a picture frame, then build a proper one. Put the facia under the decking, not over the edge/end of the decking.
Make sure you have at least 6” ground clearance under the drop beam. If not, use a flush beam and get rid of the joist overhang.
Have fun.
-1
u/TipperGore-69 2d ago
Oh Jesus
1
u/BLACKtoothDIME 2d ago
2x10 @13’ is a hard no. That thing will be bouncy asf. Generally the 2x? Should Match the length. You can go 1’ over but absolute max. You could split the difference between that and the cantilever by using 2x12 joist