r/Decks • u/OpticalTransit • 2d ago
questions for the community My First Deck.
I am thinking of tackling this deck solo.
22' x 12' attached deck (minus stairs & landing); about 6 ft off the ground; joists sit on 1¼" cleats; no joist hangers; nails everywhere.
Based on the photos, what sticks out as troublesome and which sections will be most time consuming?
All the wood seems to be pressure treated; as I was poking the wood, none crumbled. Can anything be salvaged?
My main worries are
- redoing footings
- the soil where footings will go (will they sink?)
- having the posts cut to length & properly aligned
- supporting joists during demo + install
- supporting the stair stringer during install
- stair landing
- getting rail posts, rim joists, beams flush against siding
- what calculations go into determining where posts/beams/joists go (load, frost-depth, span distance, grading of land)
- contraction/expansion
- weather (rain, sleet, hail, snow...)
- flashing
- land grading + drainage
- if ledger rot, remedy?
8
Upvotes




















33
u/cheechaco 2d ago
I don't see anything to difficult. Just remove the deck and rebuild it. Seriously, this should just be replaced.
11
u/ExcellentCan914 2d ago
Looks like the front fell off
11
u/AspiringEnchilada 2d ago
Full demo and rebuild honestly, this thing looks like a death trap not worth trying to bandaid together
7
u/Icy-Beautiful-7334 2d ago
Scrap it all, which honestly will be the crappy part. Then just rebuild from ground up. Take this piece of advice, if you are doing it for yourself then take your time… there is no clock or calendar that says it needs to be done in x amount of time… learn as you go, read a lot, ask questions when needed… 3 weeks or 3 months doesn’t matter in an average 80 year lifespan
3
u/Exotic_Box_9416 2d ago
You are asking a lot of good questions. For anybody with any kind of experience with construction, a project like this should be fairly easy. If you don't have any experience, then it is still doable. As long as you have the time and patience to learn.
First task should be finding your local codes relevant to deck building. These will give you the information you need to answer some of your questions. While you were doing that, you should also find out if your local government requires a building permit for this particular work. If it is something that is optional, I would say, get one. Anyway, as this provides a layer of protection and peace of mind for you because the inspector "should" catch any mistakes that need to be corrected.
As for reusing any of the wood, I would say no. Even treated wood has a limited lifespan, so if you reuse any of the old wood, you are immediately reducing the lifespan of the new deck.
3
u/Extreme-Awareness478 2d ago
It’s a FULL demo and replacement. Remove everything including the footers. We do this all the time and when it’s that bad you can’t do half measures.
2
u/teamcarramrod8 2d ago
Few suggestions for when you tear down and re-build.
2
u/RazorWitted 2d ago
The precise reason for joist hangers.
2
u/Odd-Midnight906 2d ago
It may be your first deck, but it will soon be your last deck.
1
u/Hour-Reward-2355 2d ago
Looks like a tearout.
The problem with trying to save money.
Just buy once and cry once. It's a redo buddy. Nothing to save here.
1
u/NorthWoodsDiver 2d ago
When you put it back build it better than the last person did. Use hangers and tension ties to avoid the current problems.
1
u/questafari 2d ago
There’s zero saving this deck. You should know that if you say you’re capable of replacing it!
1
u/hloodybell 2d ago
weee skate ramp!
1
u/MaximusCanibis 2d ago
Your worries indicate that you dont have what it takes to do this on your own.
1
u/wijeepguy 2d ago
Was there a hot tub on here?
1
u/Objective_Amount_914 2d ago
Use 6x6 posts, double your outside bands, and use joist hangers or a ledger board.
1
u/Polkadotical 2d ago
It's wavin' at yah. It'd be best if you didn't build another one.
1
u/JAlley2 2d ago
I would tear it down and not even try to reuse material. That wood may not be rotten but reusing will shorten the life of the deck.
Looking at the failure of the deck, it appears the front pulled away from the deck. Three things could prevent they from happening. 1. angle braces from each column to the joist (make sure joists line up to suit). 2. Joist hangers work to tie the structure together. 3. As an option, the Simpson Strong Tie Deck Tension Tie would guarantee a solution. This is normally used to at a ledger but could be used at the outboard end of the joists.
Check with your municipality, some have great resources for home owner/builders. Here is a link to one for an Ontario, Canada municipality. Depending on your climate, your footings may go to a different depth and your snow load may be different. While this is for the Ontario Building Code, it should work for most places in North America.
https://carletonplace.ca/wp-content/uploads/2025/07/Code-Guideline-Part-9-Decks2025.pdf
1
u/StraightLook53 1d ago
That’s a heavy shadow!
1
u/mcds99 1d ago
If Ledger rot be sure to check the rim joist for rot you may need to replace the rim joist.
1
u/Straight-Scar2128 1d ago
Demo it!!! There is no safe way to save it
1
u/Fireman_9516 1d ago
Completely tear down to ground and pull permits get inspection and rebuild
1
u/boscobilly 1d ago
Rebuild it including footings. Power clean some of the wood and decide if it''s usable, then rebuild it and put a beam at the back of the deck and don't connect it to the house except for a few screws to keep the house in place.
0
u/DIY_nightmares 2d ago
Given the high cost of lumber, does anyone besides me believe it would be worth the time and effort to salvage usable individual boards...maybe after demolition pressure wash and sand to remove moss and then treat with wood preservative if necessary. Or not worth it?