In Progress

Looking like my contractor may start laying down the boards today (using Timbertech Advanced PVC). All Madison Wood No1 Ground Contact rated. Looking good? A couple of things to note:

They spaced the joists too far apart initially and so had to move them all after they already nailed them - how concerned should I be about the joists and beam being compromised by that? They are now 12" o/c.

They made small notches in the bottom of many joists where they rest on the beam, I assume for leveling purposes. They also put wood shims from spare wood in a bunch of those notches. Seems like something that will rot quickly.

The posts in the first two pics are clearly tilted, but not sure if it's an issue.

Thanks community!

4 Upvotes

19 comments sorted by

4

u/StevieG-2021 1d ago

I’m wondering how someone does not space joists properly? Do they not know how to use a tape measure?

2

u/delfic_rhythms 1d ago

They didnt really have a good excuse. It was obvious to me it wasn't right as soon as I saw it.

1

u/Sliceasouroo 20h ago

Sounds like somebody went with 16-in centers because they thought it would be Lumber decking? 12 inch usually you only need for composite decking unless you have extremely long spans.

2

u/delfic_rhythms 20h ago

The drawings called for 12", so really no excuse. They were all around 14.5". There is some hvac in one area which prevented the 12" spacing and they said they just carried the spacing they used for that area all the way through the rest of the deck, which was obviously not the right thing to do.

1

u/Sliceasouroo 13h ago

Just saying it might not be on the guy who nailed them.

0

u/Randy_Flirt 1d ago

Why pay them for slipshod work? Have licensed inspector exam and write a report.

1

u/delfic_rhythms 1d ago

Permits were pulled for the project. The piers passed inspection a week or two ago and the frame passed inspection yesterday.

3

u/1wife2dogs0kids professional builder 22h ago

These guys are definitely house framers. They live in a 16"oc world. Some decking needs to be 12"oc if run on a 45⁰ to the framing. It's a very common mistake to have the decking running perpindicular or parallel to the house, but the framing is layed out at an angle. It can be a small detail on a poorly made print, or a footnote missed on a larger/better drawing. Either way, I see signs of the framing having multiple angles and odd shapes, and the guys framing it just went 16oc mostly out of habit. Or they just didn't have the smarter of the guys doing layout that morning. Sometimes there's crews that have that 1 asshole that thinks he's in charge, and won't let anyone else look at the print. That guy will also blame his mistakes on everyone and everything else... every time.

Those little oversights are easy to make. And normally most framers will just add in extra joists, because the difference between 16"oc and 12"oc means every other other joist still lines up correct. 1 in 4 are 8" off, 1 is 4", and 2 share the same common spot. It's easier to add 1 or 2, instead of cutting and moving 2. Stronger as well.

I see other small mistakes that really only actual framers will see, regular Joes wouldn't see them. They're the same small "mistakes" that you'll see on new homes, and they're more of a "taking pride in your work" category instead of an actual wrong or incorrect mistake.

Rough framing on new construction is done by rough framers... Who use the term "rough opening" as a loophole, instead of a particular style of framing. Some crews will sometimes be so accurate, so nit picky on some jobs, that every other trade gets held up and delayed because 1 guy with an 8ft level and several expensive lasers is trying to plane floor joists that he planed yesterday, and because the humidity dropped, some crowned or cupped more than others, and now he's checking all of them. That level of micro management or attention to detail can be good on some high end jobs, but it will definitely fuck the schedules up of every trade coming after yhe framers, and thats EVERYBODY. roofers, siders, plumbing and electricians. Painters, drywallers, trim guys, cabinets, floors.... EVERY BODY.

Most decks dont need kitchen cabinets precision, but that doesn't mean they can get away with those rough framers that do rough framing. This looks like the case here.

1

u/Sliceasouroo 20h ago

I wouldn't necessarily beat up on the guy who did the 16-in spacing. He might have just been sent over there and told to put the joists in with no drawings or direction.

2

u/Randy_Flirt 1d ago

Support post is not plumb. Will fail.sooner or later.

1

u/delfic_rhythms 1d ago

Thanks. I pointed it out to them and they said they will straighten it.

1

u/Sliceasouroo 20h ago

They can move the bottom of the post sideways and just slip a piece of sill plate gasket under it so the post does not touch the concrete. Most of that bracket will still be holding it.

1

u/delfic_rhythms 19h ago

They jacked up the deck and slid the post and bracket and refined it to the concrete

6

u/donedoer professional builder 1d ago

Thanks. I hate it.

1

u/Hour-Reward-2355 12h ago

Not great but pretty average.

1

u/acoffeetablebook 11h ago

Moving the joists isn't a big deal by itself. The old nail holes don't weaken them much as long as the new hangers are fully nailed. The notches in the bottom are what I'd ask about. Cutting into the bottom edge mid span takes away more strength than anything near the ends, so ask them why those are there before the boards go down. Once the decking is on you won't see any of it.

1

u/dirtroadhomie 1d ago

Certainly not ideal

0

u/OBX69 9h ago

The lowest bid means lowest quality, and vice versa. If you got any references & followed up on them, you would have seen red flags. Instead, you went cheap.

1

u/delfic_rhythms 2h ago

Wasn't the lowest bid and did get a reference