After the Surfside collapse, Florida created two condo-safety tools that still get mixed up. One is an inspection of the building. The other is a plan for how the association will pay for major structural work.
A milestone inspection is a structural inspection of a residential condo or co-op that is three or more habitable stories tall. It's generally due by December 31 of the year the building turns 30, based on the certificate of occupancy, and then every 10 years after that. The local building official can require it at 25 years instead. Phase one is a visual exam by a licensed architect or engineer. Phase two is only required if that exam finds substantial structural deterioration. Buildings already 30 before July 1, 2022, were due by December 31, 2024. Buildings that hit 30 between that date and December 31, 2024, were due by December 31, 2025.
A Structural Integrity Reserve Study, or SIRS, is different. It's a visual inspection plus a funding plan for the roof, structure, fire protection, plumbing, electrical systems, waterproofing and exterior painting, windows and exterior doors, and other items over a $25,000 inflation-adjusted threshold that affect those systems. Buildings three or more habitable stories need a SIRS at least every 10 years.
Unit-owner-controlled associations that already existed on July 1, 2022, were required to complete that first SIRS by December 31, 2025. If a milestone inspection was also due on or before December 31, 2026, the association could finish the SIRS at the same time, but the statute says it still cannot be completed after December 31, 2026.
HB 913, which took effect in 2025, moved the original SIRS deadline from the end of 2024 to the end of 2025 and raised the reserve-item threshold from $10,000 to $25,000. It also allowed baseline funding plans that are supposed to keep the reserve balance above zero, pooling of structural reserve accounts, and funding through special assessments, loans, or lines of credit with a majority vote. An association that has completed a milestone inspection can pause or reduce reserve contributions for up to two consecutive budgets to pay for those repairs, but only for a budget adopted on or before December 31, 2028, and only with majority approval. A new SIRS is required before funding starts back up. Structural reserves generally cannot be waived.
If you're buying, contracts entered after December 31, 2024, have to disclose whether a required milestone inspection, turnover inspection, or SIRS has been completed, and the buyer should get the current reports. On a typical resale, the buyer can cancel in writing within 7 days, excluding weekends and legal holidays, after signing and receiving those documents. That right can't be waived and ends at closing. I'd also look at what the reports recommended, whether reserves are being funded or were paused for repairs, and whether a special assessment or loan is already in the picture.
I'm a licensed agent with William Raveis in SWFL. Not legal advice, so check with your association/attorney.