COUNCIL MEETING – 30 NOVEMBER 2026
Agenda – Council Meeting Open Portion
10. Motions of which Notice has been Given
IN ACCORDANCE WITH REGULATION 19(1) OF THE LOCAL GOVERNMENT (MEETING PROCEDURES) REGULATIONS 2025
ITEM NUMBER: 10.1.
MOTION TITLE: Collins Street Changes
SUBMITTED BY:
• Councillor L M Elliot
• Councillor S Behrakis
• Deputy Lord Mayor J L Kelly
• Councillor H G Lennon
• Lord Mayor C Wooley
ATTACHMENTS:
1. Report - 12 months - Collins Street \[23 pages\]
CONFIDENTIAL REASONS: This report is not of a confidential nature.
MOTION
“That the Council:
(a) Declares the ‘Transforming Collins Street’ trial a failure and resolves that the trial be ended immediately; and
(b) Require changes made to Collins Street as part of the ‘Transforming Collins Street’ trial be reversed and Council instead pursue treatments that promote the use of Collins Street as a shared space, specifically including but not limited to:
(i) Removing the in-road bus stop in Collins Street;
(ii) Removing the separated bike lanes between Molle and Murray Streets;
(iii) Restoring parking, loading zones, no parking zones, disability parking and bus stops that were removed in Collins Street between Murray and Molle Street (except for the new road-side dining ‘parklets’ located near corner of Collins and Harrington Streets); and
(iv) Retains the current 30km/h speed limit on Collins Street.
(c) Require a report be provided to Council (or the relevant committee) as soon as practicable that presents options for providing secure and covered bike storage at the end of the Rivulet/top of Collins Street.”
Rationale:
“The purpose of a genuine trial is to test a concept, evaluate its performance and determine whether it should continue, be modified or discontinued.
While the previous Council branded the Transforming Collins Street project a ‘trial’, this was misleading as this trial concerned the design of the bicycle lanes, not whether separated bicycle lanes should be installed on Collins Street at all.
The design implemented by the previous Council was prioritised one mode of transport and one comparatively never small user group at the expense of other legitimate uses of Collins Street, with detrimental consequences for many businesses, motorists, public transport users, delivery drivers, parents, young people, the elderly and people with mobility limitations.
Two independent technical assessments undertaken by Midson Traffic and Trafficworks in August 2026 provide substantial evidence supporting the discontinuation of the trial.
In the six-plus years preceding the trial, only one non-injury cyclist crash was recorded. During approximately the first year of the trial, four cyclist crashes were recorded, including two involving injuries. A fifth cyclist crash was subsequently reported in August 2026.
The independent Trafficworks Road Safety Audit identified numerous safety concerns, including:
• An Extreme-rated risk involving buses turning from Barrack Street into Collins Street.
• High-rated risks associated with intersection congestion, the in-road bus stop, commercial loading arrangements and conflicts between turning vehicles and cyclists.
• Concrete separators presenting collision and tripping hazards.
• Infrastructure apparently designed to protect cyclists creating new safety hazards.
The Midson Traffic review challenges Council's reported 15% increase in cycling participation, questioning the reliability of uncalibrated AI counting technology and the methodology used. Manual cyclist surveys indicate that, after accounting for seasonal variations, cycling volumes are estimated to have decreased by between 17% and 37% across the corridor.
Vehicle traffic on Collins Street decreased by approximately 9–13%, while traffic on Barrack and Molle Streets increased by approximately 8%. Bathurst Street recorded approximately 288 additional northbound vehicles per day. The evidence indicates that traffic has largely been displaced rather than replaced by cycling trips. Increased congestion, queuing and inefficient vehicle movements have also undermined the anticipated environmental benefits, although actual emissions changes have not been quantified.
The removal of parking, disability parking and loading facilities has compromised accessibility and commercial operations. These consequences demonstrate the shortcomings of an uncompromising approach that insufficiently accommodates the diverse needs of the community.
Ending the trial does not represent a widespread withdrawal of support for cycling. Rather, it provides an opportunity to move away from a divisive approach that has made accessing the city more difficult and dangerous, and instead pursue solutions that accommodate all sections of the community.
Restoring parking, loading facilities and conventional bus stops, removing separated bicycle lanes, while retaining outdoor dining parklets would seek to achieve a more balanced, accessible and functional shared road environment.
Investigating secure and covered bicycle storage at the entrance to the Hobart Rivulet Track is a commitment to supporting cycling through practical alternative measures. This will enable people to secure their bike at the end of the rivulet and walk.
Council should acknowledge the shortcomings of the trial and pursue an approach that brings the community together rather than divides it.”
ADMINISTRATION RESPONSE TO NOTICE OF MOTION
Length of the trial – paragraph (a)
- The Transforming Collins Street Trial was endorsed by Council on 16 September 2024 as a two-year tactical trial to test a different approach to the function of Collins Street, including separated cycling facilities, improved pedestrian conditions, lower vehicle speeds, streetside dining, greening and improved accessibility.
- The decision of the Council included a resolution as follows:
A report be provided to the Council on the outcomes of the trial after 24 months of the installation of the bicycle infrastructure.
3. Given this requirement, the trial formally commenced in May 2025 and a final report was due to be provided to the Council in June 2027.
4. It is open to the Council to change the timeframe for the trial so that it formally ends sooner. After approximately 18 months of operation, it is reasonable to conclude that extending the trial is unlikely to materially change the broad pattern of community feedback received to date. However, a further period of monitoring would improve the completeness of the quantitative dataset. It is recommended that the trial continue until at least February 2027, so that the data for the trial includes two summer periods.
Success of the trial – paragraph (a)
5. It is also recommended that the trial is not brought to an end without a proper report on the outcomes of the trial. This would allow decisions about which elements should be retained, modified or removed to be made on the basis of the evidence gathered through the trial.
6. Council established a structured monitoring and evaluation program at the outset, with reporting at pre-installation, one-month, three-month, 12-month and end-of-trial stages and seven key performance metrics (quantitative and qualitative).
7. The most recent report is the 12-month report, which was produced in July 2026. A copy of that report is provided with this agenda. The following summary information is provided based on the information in that report.
Summary of 12-month report
Quantitative
| Metric | Evidence to date | Assessment | Comments |
|---|
| Number of bike and micromobility riders, targeting an increase in riders | Comparable cycling movements increased by approximately 15%, with more than 92,000 cycling movements recorded over 12 months. | Positive | Demonstrates increased cycling use on Collins Street and supports retaining safe and attractive cycling access as an objective of any future design, although not necessarily in its current configuration. |
| Diversity of users, targeting an increase in the proportion of women and children and types of bicycles (e.g. road bikes, cargo bikes, mountain bikes) indicating the perceived safety and accessibility of infrastructure | Women represented approximately 38% of observed cyclists, compared with approximately 35% before the trial. | Positive | Indicates an improvement in rider diversity and this should be considered alongside other safety and accessibility evidence. |
| Increased access for people walking, targeting increases in people crossing mid-block indicating perceived safety | Pedestrian movements increased approximately 4%, with around 2.48 million pedestrian movements recorded over 12 months. Additional pedestrian crossing and amenity treatments were introduced. | Positive | Supports retaining pedestrian amenity, crossing opportunities and street activation as key objectives in the future design. |
| Road safety, targeting reduced vehicle speeds | Eastbound 85th-percentile speeds reduced from approximately 36 km/h to 32 km/h, with westbound speeds reducing from approximately 34 km/h to 33 km/h. | Positive | Demonstrates progress towards a lower-speed street environment. The future speed environment should be considered as part of the alternative design and broader CBD transport assessment. |
Qualitative
| Metric | Evidence to date | Assessment | Comments |
|---|
| User confidence, targeting increased perceptions of safety for people walking and riding | Walking safety perceptions were strongly positive. Cycling perceptions were more mixed, although more respondents reported feeling safe or very safe (239) than unsafe or very unsafe (160), with 176 reported feeling neither safe nor unsafe. | Majority positive | Future design should retain demonstrated pedestrian benefits while addressing identified cycling, pedestrian, bus and vehicle interaction issues. |
| Feedback from local stakeholders, including users of the street, nearby properties and businesses. Targeting net positive sentiment towards the project | Local stakeholder sentiment has remained divided. 276 indicated positive or very positive compared with 267 negative or very negative responses, with 18 neutral. | Divided | The current configuration, particularly the separated bicycle-lane treatment, has not achieved broad community acceptance. After approximately 18 months of operation, it appears unlikely that continuation for the remaining trial period would materially change this result. |
| Feedback from broader stakeholders, targeting net positive sentiment towards the project | A total of 8 either positive or very positive and 4 either negative or very negative, with 2 neutral, indicates a clear majority in support of the project. | Divided | Alternative designs should seek to retain demonstrated transport and place benefits while responding more effectively to concerns regarding parking, loading, business access, accessibility, public transport and traffic operation. |
8. The evidence to date indicates that the trial has achieved a number of its intended objectives, particularly in relation to cycling activity, pedestrian activity and lower vehicle speeds. The results are less conclusive in relation to community acceptance and perceptions of safety, with local stakeholder sentiment remaining approximately evenly divided and cycling safety perceptions more mixed.
9. The survey results also indicate support for retaining individual elements of the trial. Respondents were asked which trial installations they would like to retain. The results for online and face-to-face responses respectively were:
a. Separated cycle lanes: 250 & 35
b. Lower speed limits: 273 & 44
c. New zebra crossing: 236 & 37
d. Street plantings and greening: 246 & 41
e. Street side dining: 226 & 44
f. Accessible parking spaces: 35 & 31
10. By comparison, 134 online respondents and five face-to-face respondents indicated that they did not wish to retain any elements of the trial.
11. As respondents could identify individual elements they wished to retain, these results should not be interpreted as demonstrating majority support for every element of the trial. They do, however, demonstrate meaningful support for retaining a number of the individual interventions, particularly the lower speed limit, greening, separated cycling infrastructure, the new pedestrian crossing and streetside dining.
12. It is noted that the bus boarder between Victoria and Murray had only just been installed prior to the 12-month survey. It was not specifically addressed in the survey.
13. Collins Street is identified as a key corridor for bicycles and pedestrians across a number of strategic and operational documents. Those documents include:
a. the Hobart City Council Principal Bicycle Network Plan, which was endorsed by Council in 2008;
b. the Inner-City Action Plan, produced in response to the 2010 Gehl Architects report “Hobart 2010 Public Spaces and Public Life – a city with people in mind”;
c. the Central Hobart Plan;
d. the City of Hobart Transport Strategy;
e. the City of Hobart Bike Plan; and
f. the Transport Network Operations Plan, jointly developed by the State Government and City of Hobart.
14. Having regard to the monitoring results, it is not considered that the available evidence supports an unqualified conclusion that the trial has failed. The trial has achieved positive outcomes against a number of the measures established at its commencement, while results relating to community sentiment and perceptions of safety are more mixed. The evaluation also provides useful evidence about which elements could appropriately be retained, modified or removed in developing a permanent treatment for Collins Street.
15. It is also relevant that the works were deliberately implemented as a tactical trial rather than permanent infrastructure. This enabled different street treatments to be tested at substantially lower cost than permanent works and allowed adjustments to be made as operational issues emerged. The value of a trial is not dependent on every element ultimately being retained; it is also intended to provide evidence about what works, what does not, and what should be modified before investment is made in permanent infrastructure.
16. In response to the points raised in the rationale of a technical nature:
a. The alternate assessment by Midson Traffic Pty Ltd dated August 2026 is noted. The counts of cyclists were only taken on one day, 23 July 2026. The weather on that date was a maximum of 10.2°C, rainy and windy (gusts of up to 67 kph). This likely explains the low number of cyclists on this date. It is not disputed that the weather can impact the tendency of people to ride their bikes, although it is disputed that measurements taken on one day should be considered more important that the broader data that has been captured for the trial.
b. It is correct to say that there was a safety issue identified with the concrete dividers. This was not identified in the 12 month report, but came to the attention of officers soon after as a risk that needed to be addressed. The bollards were swiftly replaced with bollards to remove the risk of the dividers.
c. The Road Safety Audit raised a number of risks in which most recommendations have already been mitigated and the remaining are under review.
d. Adjustments to the markings and removal of bollards on Collins Street at Barrack Street have been made to assist drivers turning left from Barrack Street into Collins Street.
e. Overall there has been a change in parking numbers and reallocation of kerbside space but the number of disability car parking spaces and loading zones have either increased or remained the same.
Future treatment of Collins Street – paragraph (b)
17. Regardless of whether the trial is characterised as a success or failure, it is open to Council to determine which elements of the trial should be retained, modified or removed and the form of any future permanent treatment of Collins Street.
18. Subject to ongoing maintenance and operational requirements, the existing arrangement could continue while a permanent design is developed. This would avoid the cost of removing the current infrastructure and subsequently undertaking further works to implement a permanent treatment.
19. Paragraph (b) of the motion provides a clear direction for an alternative treatment based on a lower-speed, shared street environment without separated bicycle lanes. Further design and technical assessment would be required to determine how this could best accommodate pedestrians, cyclists, public transport, servicing, parking and general traffic, and whether additional measures would be required to achieve an acceptable level of safety and accessibility for all users.
20. In relation to the bus boarder between Victoria and Murray Streets, its operation and impacts should be considered as part of the final evaluation. Under the previous configuration, buses stopping in Collins Street could also affect the movement of following vehicles. Accordingly, removal of the bus boarder would not necessarily eliminate delays to general traffic. Its future should be assessed having regard to public transport operation, passenger accessibility and safety, interaction with cyclists and pedestrians, and the operation of general traffic.
21. As the Collins Street works have been undertaken as a tactical trial, detailed design work has not yet been undertaken for a possible permanent configuration. Development of a permanent design will require further technical work and is expected to take a number of months. This work would enable a more reliable estimate of the cost, delivery timeframe and implications of the alternative treatments to be provided to Council.
22. Following completion of the design work, procurement would also be required for the permanent works. On the current indicative timeframe, it is unlikely that construction of a permanent treatment would commence before the beginning of the 2027–28 financial year.
23. Accordingly, while Council may resolve to end the trial immediately, physical changes on Collins Street would require a program of implementation rather than occurring immediately.
24. It is noted that if the Council does make a decision to end the trial that this would not represent a widespread withdrawal of support for cycling. Active transport is an important part of the Council's Transport Strategy and Bike Plan.
Permanent infrastructure – paragraph (c)
25. The proposal for a further report on secure and covered bicycle storage at the Rivulet/top of Collins Street is supported. The report could consider potential locations, expected demand, security and access arrangements, integration with existing and proposed cycling routes, capital and operating costs and potential delivery models.
Strategic, Legislative and Policy Implications
Capital City Strategic Plan
Pillar 5: Movement and connectivity
Outcome: 5.1 An accessible and connected city environment helps maintain Hobart’s pace of life.
Outcome: 5.2 Hobart has effective and environmentally sustainable transport systems.
Legislation and Policy
Legislation: Not applicable
Policy: Not applicable
Financial Implications
- There will be a cost to design and install changes to Collins Street if this motion is successful. It is difficult to provide an accurate cost for those changes until the design work has been completed. As stated above, it is not likely that those works could be carried out in this financial year and the Council will have the opportunity to consider the costs as part of the annual capital works program for 27/28 in the usual way.
Naturally, there's a petition 😂
(The "will of the people" bit makes me laugh the most)
On 26 November 2026, Hobart City Council's (HCC) elected members (Council) secured a majority vote in favour of stopping the trial of the Collins Street transformation, particularly regarding removal of bike lane infrastructure.
If the vote is upheld at the next Council meeting, the trial may be stopped 6 months prior to it's end date, with no documented evidence to support it's termination.
It should also be noted, this motion is against the will of the people. HCC held a public meeting, at the behest of the opponents. This meeting, through democratic voting, upheld the proposal for the trial to proceed.
Understandably, there have been some teething issues and the design may need altering. However, that is the role of this being a trial.
This petition requests -
- That Council upholds the will of the people and allows the trial to be completed; and,
- Any alterations/changes/removals are based on tangible, informed analysis of the trial.
The petition will be presented to the CEO of HCC prior to the next Council meeting 30 November 2026.