r/Juniper • • 20d ago

Question EX4300 Stack, Chassis Control Process error

Hello Everyone,

I have stack of EX4300 switch. When I try to commit interface configuration I receive the following error.

I tried using the AI, AI is not helpful at this point.

I already checked the alarms and logs, there is not much going on as far as I understand.

The only change I have from last time is, NAC has connection to switches. That's why I was focusing to see if there is a conflict with the users like if the NAC is connnected , it wouldn't allow my user to make changes. I am just guessing. But when I check the users, I don't see the connection from the NAC.

error: Check-out failed for Chassis control process (/usr/sbin/chassisd) without details

error: configuration check-out failed

1 Upvotes

20 comments sorted by

View all comments

1

u/dasmoothride 10d ago

I would be extra careful issuing the restart chassis-control command if my uplinks are layer 2 running STP. I would single-homed it first.