I run a small research site (AtomProphet) and wrote up how I think about copper supply. Posting here because I'd like pushback from people who follow the miners closely.
The usual pitch is "demand goes up, mines can't keep up." That's part of it, but the sources I went through point to a few separate chokepoints:
- Grades and lead times. The IEA says average mine grades are down roughly 40% since 1991, and discovery-to-production takes about 17 years. More rock per tonne means more energy, water and capex per tonne.
- The gap is a scenario, not a forecast. S&P Global has demand going from 28 Mt (2025) to 42 Mt (2040), with a ~10 Mt shortfall in its constrained-supply case. The IEA sees a potential ~30% deficit by 2035 on the current project pipeline.
- Processing. The IEA estimates China did about half of global smelter output in 2025 and over 90% of smelter growth since 2005. Securing ore without processing doesn't really give you an independent supply chain.
- Power and water at the mine. Zambia wants to get to ~3 Mt/yr by 2031, but it has missed targets before, and its grid leans heavily on hydro. Kariba usable storage was only about 14% a year ago (it has recovered to ~38% since). The Lobito Corridor helps with logistics, but it doesn't fix that.
How I look at the names (not investment advice, just how the exposures differ):
- FCX: scale and leverage to price, plus long permitting cycles and Arizona water-rights litigation in its filings.
- SCCO: long-lived assets, concentrated in Peru and Mexico.
- COPX: spreads single-company risk across ~40 miners, but it's still equities, not the metal.
- First Quantum and other Copperbelt operators: more direct regional exposure, with higher jurisdiction and balance-sheet risk.
The counterforces are real too: aluminum substitution in lines, more scrap, and demand could disappoint if EVs, China or AI capex slow down.
Full writeup with sources: https://atomprophet.io/posts/copper-chokepoint/
Curious which you think binds first for the miners over the next 5 years: power, water, permitting or smelter capacity?