r/OctopusEnergy • • 7d ago

Getting an EV, maybe problem with installation, help please

We are in the process of getting an EV through Octopus, coming with a free charger.

Standard insulation classes as brick or plaster other website. We have a poured concrete house (old miners houses) anyone any experience with this, hoping to not have to pay any extra towards the cost of installation!

1 Upvotes

17 comments sorted by

3

u/geekypenguin91 7d ago

Standard installation is an external meter where they split the tails to a new CU which feeds the EV charger a few meters away. What your walls are made of doesn't really matter as long as they can get a solid fixing.

If you want your charger further away from your meter, or your meter is internal, then it'll be a non-standard install

1

u/mum-3691 7d ago

Without ordering I’ve gone through and said my meter is internal anyway and this was no extra cost? It only says standard installation on brick or plaster. Obviously ours isn’t but it still classes the internal meter as standard?

1

u/geekypenguin91 7d ago

Is the meter on an external wall still? Or very close to?

1

u/mum-3691 7d ago

Yes it’s on an external wall to the back of the property, parking is round the front of the property

2

u/geekypenguin91 7d ago

Concrete will be fine then, but the distance getting the cable to the front will make it non-standard

1

u/mum-3691 7d ago

Measured up, If the were to run the cable externally its 8.5 meters from eclectic box to our ideal location for it! Would they do this?

1

u/geekypenguin91 7d ago

Yes they'll do otz but anything over 5m (iirc) is a chargeable extra. They'll run it clipped along the wall outside just above ground level

1

u/mum-3691 7d ago

It’s the “mounting to brick or plaster” that’s bothering me, we have cladded house with concrete

1

u/geekypenguin91 7d ago

It'll be fine

-1

u/mum-3691 7d ago

Don’t 100% trust AI crap but it’s saying this

→ More replies

1

u/Senior-Release-274 4d ago

They’re more bothered about cladding. That causes damage and issues

1

u/Comfortable-Fall1419 7d ago

You're confusing the length of the the cable on the charger with the length of the cable run.

If you look at the FAQ's at the bottom of the Octopus installation page the standard cable run is 10m.

3

u/geekypenguin91 7d ago edited 7d ago

Not confused, they've increased the maximum distance since I last did any work for them. Thank you for the correction

1

u/mum-3691 7d ago

happy to pay for extra length as this is the cheapest extra 🤣 would they run the cable externally and clip it round the outside edge of the house? Or would they still do internal to the charger?

1

u/Comfortable-Fall1419 7d ago

They'll run it externally for 10m or less before you incur an additional charge.

Look at the FAQ at the bottom of the installation page "What does a Standard Installation Invovle?"https://octopus.energy/ev-charger-sales/