r/PowerSystemsEE • u/Icy_Inevitable_7432 • 8d ago
Is moving into Generation Interconnection Studies a good long-term career move, or is this field becoming automated?
I recently received an offer from Mitsubishi Power Americas for a System Studies Engineer position on their Generation Interconnection Studies team, and I’m quite confused about whether I should make the move.
I’m interested in power systems and want to build deeper technical expertise in areas like transmission planning, generation interconnection, and power system studies.
However, I’m concerned about the long-term future of this field. A lot of studies seem to involve running simulations, analyzing results, evaluating contingencies, and preparing reports. With AI and automation advancing rapidly, I wonder how much of this work will eventually be automated. Are companies already developing tools to automate much of the study process?
I don’t want to spend the next several years in a role that eventually becomes repetitive or has limited career growth because much of the technical work can be automated.
I’d love to hear from people working in generation interconnection, transmission planning, consulting, or power system studies.
I have few questions:
What does long-term career progression look like in generation interconnection studies?
Is the work primarily running simulation tools like PSS/E and PSCAD, or does it involve substantial engineering judgment and problem-solving?
How vulnerable is this field to AI and automation over the next 5–10 years?
Is moving to Mitsubishi Power for a system studies role a good career move?
What skills should I develop to remain valuable and competitive in this industry?
I’d appreciate honest opinions, particularly from people with several years of experience in this field. I’m trying to make a decision based on long-term career growth, technical development, and job security rather than just the immediate opportunity.
15
u/ItchyDragonfruit890 8d ago edited 8d ago
The utility I’ve been co-op’ing for in their transmission planning stability group has been automating their TPL-001 contingency studies using ML. Obviously, the direct benefit is less time that engineers will have to spend on running individual studies for a number of contingencies. Additionally, less work will have to be contracted out to consultants. The idea is to bring more of the study work in-house.
That said, the transmission evaluation process & project management aspects will keep humans in the loop. The more technical EMT studies will continue to require engineers. How engineering functions will be reallocated/repurposed remains to be imagined… but the automation of GI studies aren’t going to suddenly or definitely cut humans out of the equation.
Last tidbit is that the industry is adapting in the moment as we speak, so no one knows for sure how it’ll all pan out. We can vibe out as much as we like how things will change, but no one really knows for certain what that future will look like. It’s in the same vein that no one could’ve predicted how the COVID pandemic ultimately changed the economy and the way society has adjusted.
5
u/f3rr3tf3v3r 8d ago
I worked in generation interconnections at a utility for a few years. There’s a movement toward automating the study aspect for sure. The studies identify the problems. One thing I don’t see AI doing very well is coming up with solutions to those problems. For example, your generator is going to cause lines A, B, and C to overload under contingency situations 1, 2, and 3. Well there’s 10 solutions that resolve the A overload for situation 1. They all have different costs, permitting constraints, constructability concerns, and operational timelines. Some of those 10 solutions may also resolve some of the other problems. Maybe. Every situation is unique, and there are tons of factors that go into choosing a solution.
With our energy needs only ever increasing, getting more generators connected is going to be a booming industry for the foreseeable future, regardless of automation and AI.
Also, utilities are extremely conservative and in my experience very untrustworthy of AI. They’ll be slow adopters, especially when you start attaching price tags in the millions of dollars with these generator interconnections. I only left the role for a more interesting topic (protection).
5
u/obeymypropaganda 8d ago
Take the job. You can say this about any industry. Nobody knows how it will look in 5 years time.
Humans will have to be in the loop. "Oh sorry for the country wide blackout guys, my AI said it was a good design". This shit isn't getting approved without an engineer.
AI still can't do a lot. It needs connections to every single software at the same time to even come close to get the full picture. It can't handle standards. I have caught it lying when I ask for the relevant clauses.
This question is asked on every single sub. Take the damn job and make yourself valuable so AI cannot replace you.
3
u/Least_Distance_5393 8d ago
I am a Senior as well and thinking of joining power systems industry. Do you mind sharing rough estimate of how much they are offering.
Dont want to get low balled in near future 😔
2
u/5bobber 8d ago
Taking the role now is a safe option. AI has not taken over the job yet, so there’s still time to get “boots on the ground” experience. However, like most things in the world, it’s definitely not safe from AI.
Check out Hyper-Q / Tapestry Energy. They are coming for the interconnection space / transmission planning. They are an arm of Google and have some of the same team that developed Waymo.
2
u/transmissionplanning 8d ago edited 8d ago
There is no real risk of AI taking over the studies work entirely. AI will make engineers much more productive and help process the vast data that simulations output, but it is far too technically complex for it to be automated away entirely. Generation interconnection is going to be mostly PSSE simulations with more EMT work on the horizon due to new NERC requirements. But, getting your foot in the door with PSSE will allow you to branch out into any other kind of study long term. GI work will get repetitive, but as I said you can certainly branch out into other studies that aren't repetitive by lateral transfer within the company or moving to another consultant/ utility. Companies are always trying to develop automation to make the execution of these studies more streamlined and consistent, so upping your python and excel skills will be vital to remaining valuable with AI making the simple stuff more automatic
Power system studies will have very strong job security.
It is far too technical and the engineering judgment you have to make cannot be left to AI. One hallucination in a vital assumption could be the difference between a stable system and a widespread oscillation that brings systems down
I would recommend not staying in GI long term though. For multiple reasons. But PSSE/PSCAD experience is so in demand
Also, much of the job relies on tribal experience. AI simply does not have the data sources to reference in order to be intelligent on the topic
1
u/Substantial_Movie521 8d ago
MEPPI raided my department hard about four years ago. Took three junior transmission engineers in the span of like six weeks.
One year after that happened, we checked in. One had quit, one was fired, one is actually still there.
Generation Interconnection is all of this. It's repetitive, it's not interesting, it will limit your career growth. And if you want to keep your sanity, you'll automate it... to the detriment of your own job.
Every tenured Transmission Planning Engineer that was re-assigned to Generation Interconnections has quit within two years. It's that bad.
1
u/OtherEndOfTheWire 6d ago
Not a study engineer myself, but I follow the interconnection side closely, and a few things point toward it being a solid bet:
- The queues are enormous. Berkeley Lab's annual "Queued Up" report has shown well over 2,000 GW of generation and storage waiting nationally, and the typical wait from request to operation has stretched to several years. Someone has to study all of it.
- FERC Order 2023 moved transmission providers to cluster studies with firm deadlines and penalties for late studies. That raises the pressure to get studies done, not lowers it.
- The new wave is large loads. Data centers asking for hundreds of MW now go through their own interconnection processes, and a lot of utilities are writing those rules right now.
Automation will take over the repetitive part: building cases, running contingency batches, formatting reports. The judgment part (what a violation actually means, which upgrade fixes it, and defending that to a developer or regulator) is much harder to automate. People who can do both, write scripts and understand the physics, seem to be in the safest spot in the field.