r/SolarPowerIndia • • Sep 06 '26

Welcome: compare quotes, catch red flags, skip the solar noise (India edition)

7 Upvotes

Hey everyone I'm u/LostSoul5, one of the founding mods of r/SolarPowerIndia.

This sub is for anyone in India trying to figure out rooftop solar for real: quotes, subsidies, DISCOM/net metering, batteries, inverters, and whether an installer is actually worth trusting. Not marketing fluff. Not "get 10 free quotes" spam. Just practical help from people going through the same process.

India solar is confusing on purpose sometimes — every vendor says they're the best, subsidy math gets fuzzy, and a lot of quote platforms feel like lead farms. We're building a place where you can ask dumb questions, share real bills and quotes (redact personal info), and learn from people who've already been through DISCOM approvals and commissioning.

What to post

Good posts:

  • "Is this quote fair?" (panel brand, kWp, inverter, price, city)
  • PM Surya Ghar / state subsidy questions — eligibility, documents, timelines
  • Net metering and DISCOM horror stories (or wins)
  • DCR vs non-DCR — when subsidy is worth the hassle
  • Battery + inverter wiring (12V vs 24V, lithium vs tubular)
  • Installer experiences — good and bad — with specifics, not just "avoid X"
  • City/state-specific tips (Gujarat, Maharashtra, Delhi NCR, etc.)

Please avoid:

  • Drive-by ads and unexplained links
  • "DM me for best price" with no details
  • Copy-paste SEO articles with no real value

If you're a company or partner, contact moderators first. Educational content is welcome; stealth selling is not.

A few things we wish someone had told us upfront

  1. Subsidy is not automatic. PM Surya Ghar can save up to ₹78k, but name mismatches (Aadhaar vs bill), wrong panels (ALMM/DCR), or non-empanelled installers kill claims. Budget time, not just money.
  2. Compare net cost, not headline price. A ₹3.35L DCR quote minus subsidy can beat a ₹2.7L non-DCR quote — but only if the subsidy actually lands. Ask your installer how many customers got full CFA and how long it took.
  3. "5 kW" on the brochure ≠ 5 kWp on the roof. Check panel count × wattage. Get inverter brand/model in writing.
  4. Indians distrust multi-quote marketplaces for a reason. That doesn't mean all quotes are bad — it means accountability matters more than choice overload. One clear scope, one responsible party.
  5. Net meter and DISCOM fees are often extra. Not always in the quote. Ask before you sign.

Community vibe

Be direct, be helpful, call out bad advice when you see it — but stay constructive. New homeowners are anxious and getting pitched constantly. If you've been through an install, your experience is gold. If you're still researching, ask away.

We don't endorse installers or remove competitor mentions because someone paid. Partner content, when it exists, will be disclosed. The goal is an informed buyer, not a sold one.

How to get started

  • Introduce yourself in the comments: city, roof type, bill range, where you are in the process.
  • Post something today — even "₹2.7L for 4.8 kWp Waaree + micro-inverters in Pune, fair?" is a great thread.
  • Invite someone stuck in WhatsApp installer hell.
  • Want to mod? Message me — we want people who live in this stuff, not just want a badge.

Thanks for being here in the first wave. If we do this right, r/SolarPowerIndia becomes the place people check before they sign, not after they're stuck.

— u/LostSoul5


r/SolarPowerIndia • • Sep 15 '24 Heartwarming

Solar Incentives and Subsidies.

9 Upvotes

What PM Surya Ghar actually is (plain English)

Launched Feb 2024, expanded in the interim budget push toward 1 crore households. Goal: rooftop solar so homes can cover a big chunk of monthly use — marketed as up to ~300 units/month “free” from a properly sized ~3 kW system (depends on your consumption, generation, and net metering).

Official portal: pmsuryaghar.gov.in
Budget speech reference: Interim Budget Speech PDF

This is residential only. MSME/commercial rooftops generally don’t get this central CFA (different rules/tax benefits).

Central subsidy amounts (2026 — unchanged at core)

System sizeCentral subsidy (CFA)
1 kW₹30,000
2 kW₹60,000
3 kW+₹78,000 max

Important: Subsidy is capped at 3 kW even if you install 5 kW or 10 kW. Bigger system ≠ bigger central grant.

Subsidy is paid by DBT to your Aadhaar-linked bank account after commissioning — not a guaranteed instant discount at quote time unless your installer structures it that way (and you trust them).

Who qualifies (basics)

  • Domestic electricity connection in your name
  • Homeowner or valid society/RWA NOC (tenants usually can’t apply directly)
  • Shadow-free roof space (~80–100 sq ft per kW rough guide)
  • Sanctioned load that supports the proposed system size
  • Empanelled vendor on the national portal for your DISCOM
  • ALMM-listed panels + portal-enlisted inverter (exact models matter)
  • DCR modules required for central CFA (domestic content rules — confirm current ALMM List-II position with your vendor)
  • Haven’t already claimed central subsidy on another system at that connection

How to apply (don’t skip steps)

  1. Register on pmsuryaghar.gov.in (state, DISCOM, consumer number, mobile)
  2. Get DISCOM technical feasibility approval — don’t install before this
  3. Choose vendor from portal empanelled list for your DISCOM
  4. Install → net metering application → inspection/commissioning
  5. Subsidy redemption on portal → DBT to your bank (often weeks, not days)

Timeline reality: Feasibility + net meter + inspection can take weeks to months depending on state/DISCOM. Budget for that.

State top-ups (extra on top of ₹78k)

Some states add separate subsidies (Gujarat, Rajasthan, MP, Haryana, Delhi, etc.). Rules differ — often another application, income caps in some states, or DISCOM-specific process.

Always ask: “Is there a state top-up in my city, and is it included in this quote or separate?”

Why Indians (rightfully) don’t trust “subsidy brokers”

  • Quotes inflate gross price so “after subsidy” looks like a steal
  • Non-empanelled installer → subsidy dead
  • Wrong panel/inverter model → rejected at inspection
  • Aadhaar name ≠ bill name → one of the top rejection reasons
  • “We handle everything” but your portal account, your bank, your claim

Rule: Subsidy eligibility is yours. Installer executes the job; you should see portal status and DBT in your account.

Common mistakes (save yourself a thread later)

  • Installing before portal + feasibility approval
  • Non-DCR panels while claiming PM Surya Ghar CFA
  • Inverter not enlisted on national portal (people say “ALMM inverter” — verify portal list)
  • Sanctioned load too low for proposed kW
  • Blurry/wrong geo-tagged install photos
  • Assuming ₹78k off the quote = guaranteed (say “up to” until DBT hits)
  • Net meter / DISCOM charges not in quote (often ₹15k–40k+ extra)

DCR vs non-DCR (quick decision)

DCR + subsidy routeNon-DCR, no subsidy
UpfrontOften higher grossOften lower fixed price
PaperworkPortal, DISCOM, waitingMinimal
RiskRejection/delay if docs/hardware wrongPrice certainty
Best forPatient homeowners, empanelled quote you trustWant simple fixed deal now

Run net cost after real subsidy, not brochure math.

Useful links


r/SolarPowerIndia • • 7h ago

Kerala Hey, i'm looking for HJT panels here in kerala for my company.

1 Upvotes

If anyone is doing b2b for longi panels any other HJT panels. DM me.


r/SolarPowerIndia • • 7h ago

West Bengal LOOM SHARK 730~750 Wp HJT Dual-Glass Solar Panel

1 Upvotes

I would appreciate feedback from people who have installed HJT panels of the title. And Loom panels in general if you have them on your rooftop.

The solar installation company I want to work with seems to have a deal with Loom as they will only quote Loom panels. Which is fine as long as I am not hung out to dry owing to poor quality or lousy aftersales.

Incidentally, I sent email to Loom asking if their HJT panels are DCR and, instead of a simple yes/no, I got a reply, AI obviously, saying I need to pay Rs. 1000 for an engineer visit. Not disqualifying to my mind, but not confidence inspiring either.


r/SolarPowerIndia • • 1d ago

Kerala My Tata Solar Plant Has Been Dead Since September 2026. Nobody Seems to Care.

16 Upvotes

First of all, apologies for the long post. But please take a few minutes to read through the entire thing. If you're considering installing a Tata Power solar system, my experience might save you a lifetime of headaches.

Tata Power Complaint Reference Details:

  • Tata Power Complaint Ticket: 0018330262
  • Work Order Number: WO-1219645

I am sharing my experience with Tata Power's rooftop solar after-sales service because I genuinely believe prospective customers should know what can happen when something goes wrong after installation.

We invested approximately ₹3.5-4 lakh in a Tata Power rooftop solar system at our residence in Kollam, Kerala. Unfortunately, the system stopped working in September 2026, and what followed has been an extremely frustrating experience.

What happened?

A TATA Power technician (dealer- lifestyles kollam) visited our property, inspected the system and confirmed that the Growatt inverter had suffered internal damage, causing the entire solar plant to stop generating electricity. We were informed that the inverter would be replaced under warranty.

Since then, we have registered multiple complaints and made countless attempts to get the issue resolved.

1. Authorised dealer – Lifestyles Kollam (near Asianet office, Kadapakkada, Kollam, Kerala, 691008)

Our experience with this authorised dealer has been extremely disappointing. Despite repeated calls, the phone was frequently engaged throughout the day and switched off in the evening. Getting a basic update or assistance became a challenge. They always ignore or does not care to take accountability or to fix the problem.

2. Repeated promises from Tata Power

A Tata Power representative named Jayasankar initially assured us that the issue would be resolved within one week. That never happened.

After further follow-ups, he explained over the phone that the replacement was delayed because they did not have the required inverter in stock.

Imagine waiting nearly two months for a warranty replacement only to be told that the company doesn't have the required stock.

3. Written commitment from the Regional Manager

After escalating the matter through multiple emails to Tata Power's customer care and senior management, Regional Manager Ajay Babu finally contacted us.

On 3 November 2026, he sent an email stating:

"We assure you that the inverter will be replaced within the next two weeks."

We finally had a written commitment from regional management.

However, even after following up for a progress update, there was no response. The deadline expired on 17 November, and as of 20 November, the inverter has still not been replaced.

The solar plant remains completely non-functional.

4. KSEB billing complications

This is no longer just about a faulty inverter.

Our property is under KSEB solar billing. Since the plant has not been generating or exporting electricity since September, KSEB officials have visited our residence multiple times and informed us that the issue needs to be rectified.

We are now concerned about possible billing adjustments, higher electricity charges and even complications with our existing solar billing arrangement.

We have repeatedly explained these concerns to Tata Power, but nobody has taken responsibility or provided a satisfactory answer.

We have now taken formal action

After exhausting the usual customer support channels, escalating to senior management and even contacting the CEO's office, we registered a formal grievance with the National Consumer Helpline on 20 November 2026.

Our complaint includes the original technician's findings, the missed commitments, the prolonged failure to honour the warranty, and the financial consequences.

My concern

I understand that technical failures happen. No product or company is immune to that.

But what I cannot understand is how a company of Tata's reputation can leave a customer chasing different departments for more than two months, repeatedly provide assurances that are not honoured, and then fail to communicate even after a Regional Manager gives a written commitment.

The problem is not just the inverter. It is the complete lack of ownership and accountability.

Has anyone gone through something similar? How was it resolved?

I'm also sharing this for people considering Tata Power solar installations especially exposing the dealer in Kollam. Please look beyond installation and product warranties and consider what the after-sales experience may look like when something goes wrong.

I genuinely hope Tata Power takes responsibility and resolves this, but I am no longer willing to accept endless assurances without action.

Please if possible try to engage on my thread so authorities see and take action:

https://x.com/Saran_0007/status/2123668876584161748?a=JkqjxskuWxYqNegVLJ4&s=20

full story https://x.com/Saran_0007/status/2122958127507349668?a=7Esz50GaBdeajwo3Egc&s=20

 


r/SolarPowerIndia • • 1d ago

Delhi (NCT) How much generation do you lose when panels stay dusty?

8 Upvotes

I got a 3 kW system installed in Delhi a few months back. The dust here is crazy, and I can see a thin brown layer on the panels every few days. I haven’t cleaned them yet because I’m not sure how much it actually matters. My app shows generation going down, but I can’t tell if it’s the dust or just the season.

How much do you lose when panels stay dusty? And how often do you clean them in Delhi?


r/SolarPowerIndia • • 1d ago

Tamil Nadu Solar quotation is it fair pricing?

Thumbnail
gallery
5 Upvotes

Is it fair pricing ??

Location - Vellore, TN.


r/SolarPowerIndia • • 1d ago

Kerala Planning to install 8kw on grid solar system in Kerala, need expert opinion on InVerters and other stuff that I have to keep in mind

3 Upvotes

Panel suggested by the vendor was Adani topcon Bifacial

inverter - Pv Blink, Solice, Solaire (3 phase)

Need your help guys for choosing the best for my system


r/SolarPowerIndia • • 1d ago

Tamil Nadu 5Kw hybrid setup - Deye or solaX?

1 Upvotes

Was thinking of installing deye since many said it has good customer service but the Installer said they don't have stock now and recommends solaX instead?

How is SolaX- what are the pros and cons? Price range compared to deye?


r/SolarPowerIndia • • 4d ago

Andhra Pradesh Vendor has frauded amount in work document and forged my signature

11 Upvotes

I had agreed to the vendor for 1.7L for 3 kw setup with pm surya ghar. There were two documents one was pre-sign and other was work document. Read the terms and signed for 1.7L. Paid 92k accordingly, and got subsidy. When I asked for warranty document, they said the original document was actually not correct it was a typo and 1.8L is actual cost and I have to pay for any warranty or repairs.

They didn’t give me my work document, I got suspicious and logged in to PM Surya garh to find my signature being forged and the amount being updated to 1.8L with their employees as witnesses. The vendor’s name is infiniti solar systems pvt ltd.

I raised a ticket in PM Suryagarh and CPGRAMS last week, but I didn’t get any response still.


r/SolarPowerIndia • • 5d ago

Karnataka 2 kw offgrid System

3 Upvotes

I am looking for an offgrid solar inverter with lithium battery pack.
Intention:
We face an irregular power supply in our area.
Half day overshedding once per week, frequent power cuts and longer or overnight power cuts during rainy season.
We need an inverter to run fans, lights, phone charging, routers and occasionally a mixer/grinder. Preferred additional load is a 0.5 hp pump. The load requirement for the expected hours of backup is less than 2kwh.
The house already has wiring for backup inverter.
The Plan is to go for solar offgrid inverter instead of normal inverter so that the solar panels can provide backup during the days and also charge the battery in case it is drained overnight.
I could only find the 3kw Utl gamma plus 3400 inverter paired with 25.6v 100ah lithium battery and top on 590wp panels in 2S*2P configuration.
The discrepancies I noticed:
Though marketed as 3kw, it supports only 2.3kwp solar panels and 2.5kwh battery.
There is no inverter battery communication for efficient charging.
The inverter supports lithium battery charging at max of 14.4v while the battery itself specifies recommended charging voltage of 56.8-58.4V. The peak charging current is 40A on both inverter and battery side. This leads me to assume that even when the solar output is at its peak(considering losses), it will not be fully utilized for charging a fully drained battery.

Is UTL a reliable brand?
Is this system configuration correct?
Are there better choices out there?


r/SolarPowerIndia • • 6d ago

Rajasthan Confused about inverter for 10kW Waaree setup (16 × 620W TOPCon)

8 Upvotes

I am in the final stages of finalizing a 10kW 3-phase on-grid solar setup in India and could really use some community input before I sign off on the equipment.

My System Details:

• Panels: 16 × Waaree 620W TOPCon panels (Total: 9.92 kWp)

• Connection: 3-Phase On-Grid (planning for PM Surya Ghar subsidy / net metering)

The Confusion:

My vendor is strongly suggesting a KSolare 10kW 3-phase inverter. However, looking at the specs, most standard KSolare 10kW models (like the 5G Pro) max out at 13A–16A DC input current per MPPT.

Depending on which exact 620W Waaree module batch I get (the 17.15A high-current variant vs. the 13.07A variant), I am worried a 13A KSolare inverter will clip my generation during peak hours. Also, some KSolare 10kW models only have 1 MPPT.

Questions for installers and solar owners here:

  1. Has anyone paired 620W TOPCon panels with a KSolare 10kW inverter? Did you face any current clipping or reliability/service issues?
  2. Should I push my vendor to switch to a 20A+ per MPPT dual-MPPT inverter like Sungrow (SG10RT), Deye, Solis, or Waaree's own 10kW inverter instead?
  3. How is KSolare's after-sales service compared to Sungrow/Deye/Waaree in India right now?

Would appreciate any real-world feedback before I lock in the quote. Thanks in advance!

There is one more option of selec inverter


r/SolarPowerIndia • • 6d ago

Tamil Nadu Suggestion and evaluation of 3kw quote

Post image
39 Upvotes

I'm planning to install a 3kw rooftop solar and got the quote below from a vendor. I'm looking for evaluation of the price and the suggestions in the proposal


r/SolarPowerIndia • • 6d ago

Rajasthan 9-Month Review of 5 KW Solar

12 Upvotes

Zero electricity bills since day one—in fact, we're in the minus with net metering. With the 5.6 kW rooftop setup running smoothly, we've even switched daily cooking over to an electric induction cooktop, saving significantly on LPG cylinders as well.

The system generates plenty of surplus energy, so the next logical step for the house is an EV scooter to absorb those extra units.

Full breakdown here


r/SolarPowerIndia • • 6d ago

Telangana On Grid Solar (Non-DCR) installation without Vendors

4 Upvotes

Hello experts, I would like to install On Grid Solar completely by myself in Hyderabad as vendors charge more. And i'm going with non-dcr panels without subsidy.

I see there is no option in PMSuryaGhar to proceed without Vendor selection.

Why are such restrictions in place? And now to apply for NetMeter we have to use PMSuryaGhar only.

Any suggestions help ?


r/SolarPowerIndia • • 6d ago

Kerala On-Grid solar paper works gone wrong | It's been six months now

Thumbnail gallery
3 Upvotes

r/SolarPowerIndia • • 6d ago

Karnataka How much did pay for your solar setup in Bengaluru?

2 Upvotes

Hello, I am trying to gauge the pricing for a 4kw panel setup with a a 5kw hybrid invertor with an option to add a battery later. Sanctioned load is 4kw in our house and I don't want to bump it up as it costs money.

I want the structure to be at 10 feet height (lowest side) so that the space underneath is practically usable.

I have been given a quote of 4.6L which is not reasonable.

Want to hear from folks in bangalore about their setup costs (before subsidy) from recent months.

Thanks.


r/SolarPowerIndia • • 6d ago

Tamil Nadu Is 1.8L a fair quotation for the below configuration (On-Grid) (1.8L before Subsidy, 1.02L after subsidy)

Thumbnail
gallery
4 Upvotes

Got this quote from a nearby vendor. They are properly registerd in the Surya Ghar portal and their name is listed in the official dealers of Waaree.

This quote seems better than all pther quotes I have received from different vendors.

Anything specific I have to check/inform them?


r/SolarPowerIndia • • 6d ago

Tamil Nadu Installing Solar Power for Home 4KW.

2 Upvotes

Installing a home Solar power grid, please help.

I would want to setup for Home Power.

  1. Panel - Vikram/Waree TopCon BiFacial panel
  2. Invertor - Deye (8yrs) or V Guard (10 yrs)

Please help me choose between these two panels and inverter setup. Which is best and why.

My Choice - Vikram and V guard setup.

Location - Vellore, TamilNadu

Thanks.


r/SolarPowerIndia • • 7d ago

Delhi (NCT) Balcony solar

3 Upvotes

Has anyone tried putting solar panels in balconies? Is there a law around it? What’s the practicality of running a few solar panels in a regular balcony? Okay with lower efficiency


r/SolarPowerIndia • • 8d ago

Tamil Nadu Planning a 3.5 kWp Rooftop Solar Installation in Tamil Nadu – Looking for Advice and Experiences

9 Upvotes

Hi everyone!

I'm planning to install a rooftop solar system at my home. I've received a quotation from a local vendor and would like to get some feedback from people who have already installed residential solar power systems.

Proposed system specifications:

- System: On-grid rooftop solar

- Inverter: 3 kW single-phase grid-connected inverter

- Solar panels: 3.51 kWp (6 × 585 W Tata Power bifacial panels)

- Mounting structure: 7-foot elevated JSW pre-galvanized steel structure, with civil/foundation work. The idea is to utilise the terrace space underneath.

- Other components: 3 copper-bonded earthing pits, lightning arrestor, ACDB, DC protection, cabling and associated accessories.

- Quoted price: Approximately ₹2.7 lakh, including GST, elevated structure and civil work, but before government subsidy.

I'd appreciate feedback on the following:

  1. Pricing: Is ₹2.69 lakh reasonable for this configuration, considering the Tata Power components and 7-foot elevated steel structure? Would it be worth getting quotations from other local vendors?
  2. Component selection: How has your experience been with Tata Power Solar panels and inverters? Are there other brands worth considering?
  3. Elevated structure: For those with elevated rooftop installations, how has the steel structure held up over time? Any recommendations regarding steel quality, thickness, galvanisation and structural durability?
  4. Inverter capacity: Is a 3 kW inverter sufficient for a typical household? Can it comfortably support appliances such as a 2-ton AC, refrigerator, washing machine, TVs, fans and lights? What combinations of appliances can realistically run simultaneously?
  5. Actual generation: How many units (kWh) does your system generate daily, particularly during summer and monsoon?

If you've already installed a residential solar power system, it would be really helpful if you could share:

- Installed system capacity

- Total installation cost (including structure)

- Solar panel and inverter brands

- Average daily electricity generation

- Overall installation and maintenance experience

I'm particularly interested in real-world experiences.

Thanks in advance!


r/SolarPowerIndia • • 8d ago

Delhi (NCT) Confused about solar subsidies in India. How do central and state ones work?

2 Upvotes

I live in delhi. I want to put solar panels on my roof, but the subsidy part is confusing me. I know there is a central scheme like PM Surya Ghar and that some states give extra, but that is about it.

How much do I actually get, and does it depend on system size?

Do I pay the full price first and get the money back later?

How long does it take to reach my bank account?

Anything I should avoid so my application does not get rejected?


r/SolarPowerIndia • • 8d ago

West Bengal https://pmsuryaghar.gov.in/ seems inaccessible

1 Upvotes

I am currently abroad planning to set up solar for our house in Kolkata. When I try to reach https://pmsuryaghar.gov.in/ even after VPNing to India I get the dreaded 403 Forbidden. It's been this way past couple of weeks.

Is the site accessible in India? Are they detecting VPNs and blocking?


r/SolarPowerIndia • • 8d ago

Tamil Nadu Changing EB name from late father to mine for a solar subsidy (without changing property ownership)

4 Upvotes

I am planning to install a 3 kWh roof solar system. However, the EB bill is currently in my late father's name. We have not yet updated the name on the property tax records, nor have we changed the consumer name on the EB connection. The property is also registered in his name. My father is survived by my mother, my two elder sisters (who are married), and myself.

Since the subsidy will be credited directly to the account of the registered owner of the EB connection, this situation is currently halting my plans to proceed with the installation, and I am unsure how to move forward. Since Everyone holds an equal share in it, I am unable to change the property ownership name at this moment. Therefore, I am considering simply changing the consumer name on the EB bill.

I would like to get inputs on this. Is there anything or any specific process I should be aware of before proceeding with changing the consumer name on the EB bill ? FYI, I want the EB bill consumer name to be in my name, rather than my mother's or sisters' names. This is solely to facilitate easier transactions and does not imply that I hold sole ownership of the property.


r/SolarPowerIndia • • 9d ago

Investing & Business India can make 4x more solar panels than we install, and that’s a problem

Post image
5 Upvotes