r/StructuralEngineering • u/Fivefortyi • 3d ago
Steel Design Structural engineer gave us incorrect drawings
Hi guys,
Just want to know where to stand with this.
Our structural engineer has supplied us with a drawing with a steel beam that was thinner than the wall we are holding up above. For context ( 230mm wall thickness beam was 102mm)
I raised this over the phone he said it’s all fine it’s a narrow beam. My builder said he hasn’t seen anything like this & said to get this confirmed.
I wrote an email to him about the concerns & he said he’ll come down.
I already paid for a site visit, drawing & a report from him already.
Once he came down he was confused at the wall depth & said just get another beam. He left quickly after.
I’ve got a revised drawing however the freeholder/alteration team has said you will need another license to alter. This will delay us further 2-4 weeks (another mortgage payment) & additional legal fees for the license to alter.
The revised drawing has 2x UB he originally put in his drawings
What position are we in & what can we do.
I’ve raised it with him & sent him an email.
He’s a chartered engineer with his own company.
48
u/Upset_Practice_5700 3d ago
Is he an engineer or a surveyor?
Engineers make mistakes. Not sure you can sue him for damages, does not look like there are any, regardless, not worth trying (In my opinion, however lawyers and insurance peeps may disagree.)
Surveyors should not give you steel beam sizes.
10
u/Old-Slip-1319 3d ago
Can you add a 230mm wide plate to the top of the beam?
16
u/chopperbiy 2d ago
You are not going to get any costs towards your additional mortgage costs and additional licence costs if that’s what you are thinking. It doesn’t work that way in this part of the world relative to the USA. It would cost you more to go after him than you would get back.
However I wouldn’t be paying him for any rework above his original fee.
13
u/Worried_Let4942 3d ago
Usually you’ll be ok to weld a plate to the top of it. I’d get him to alter his drawings to show that.
3
u/SelfSufficientHub 3d ago
What outcome are you hoping for?
8
u/September1752 3d ago
Is he a chartered surveyor or a chartered engineer? A surveyor shouldn't be specifying beam sizes.
3
u/ReplyInside782 2d ago
Weld a wider plate on top of the beam have the engineer detail it for you. If the beam itself is fine, then adding a plate shouldn’t be an issue
1
u/Objective_Two_5467 3d ago
Your wall is 9 inches thick? Is it masonry?
1
u/JG300192 2d ago
Firstly, please do not take remedial advice from the posts on here, we have no context on the length of the new beam, the height of the wall it is supporting, if it is an internal or external wall, how many floors / roof does it support etc.
The information is very limited in this post for people to be providing structural solutions.
I presume it is a solid 230mm rather than a cavity construction. I suspect the 2 no. beams side by side is the correct approach, but the incumbent engineer needs to provide the structural calculations.
I don’t understand why you need to undertake a new application unless your current application expired or you are undertaking new / additional works not shown on the original application. Is one of these scenarios applicable? In either case I think you’d struggle to attribute this as the engineer’s fault.
Based on what I can glean from here. All I can advise here is that the engineer should not charge you for additional works / drawings to account for the extra beam. Providing the proposed alterations have remained the same throughout this process, I’d also question the freeholder on why a new application is required. The only additional cost should be the material and labour for 1 no. Additional beam from the contractor.
1
u/Superb_Sea7721 1d ago
From the steel side, two beams side by side under a 9" masonry wall is about as routine as it gets, so the fix itself isn't a big deal. What I'd check on the revised drawing is how the two beams are tied together. They need bolts with spacers or packers at regular spacing so they work as one member, plus bearing details at each end. That's the first thing a fabricator will ask about, and if it isn't on the drawing you'll lose more days to back-and-forth. On the money, I wouldn't chase him for the delay, but I'd ask in writing that the revision and any extra site visit are at no charge, since the first design didn't fit the wall it was holding up.
1
u/CAGlazingEng 1d ago
A little late to the conversation but are you not working off of drawings? I know residential is a little more fast and loose with detailing. What was he working off of and what did you ultimately get?
1
u/ronfnma 4m ago
Add a second beam with a 26 mm gap between them so the out to out dimension equals the width of the wall
0
u/ExcelEng 2d ago
This is crazy. It would’ve taken him two minutes to give you another option for a beam. Not sure why he did not do that.