TASKER opinions?
I got this booking request for a post-construction clean. I’m relatively new to solo house cleaning (started just over a year ago), but I’ve done a few construction cleans. From these experiences, I realized that these types of cleans are visually deceptive and generally take a very long time, eat a lot of supplies, and are tough on regular vacuums.
I resolved that I would not take on another solo post-construction clean unless I was able to draw hard boundaries about what was actually feasible within whatever time was allotted by the client, and also not unless I eventually got a specialized vacuum for construction dust, or the client provided a shop vac of some kind.
See attached photos to view booking request and chat conversation for context.
I was messaging him while working in another regular client of mine’s home, and was on my way home from said job when I received a phone call. I didn’t register that it was a TR call right away, so I answered with a ‘hello.’ He said “I had a missed call from this number?” and I said “Um, no I didn’t call this number… who is this?”
Then he said “Is this [my name]? I’m [his name]; I’m trying to book you on Taskrabbit and I’m trying to send you photos right now. But it’s just 1500 square feet, one level, it should be really easy.”
I was sort of caught off guard by the whole thing, so I just said something along the lines of “Oh okay! Thanks for reaching out. I just wanted to communicate a little bit and make sure we were both on the same page as far as timing and scope goes. I know from experience that construction cleans are usually very visually deceptive and take quite a long time. I’m trying to prevent a situation where we’re both frustrated because I’ve spent 6, 7, 8 hours in your home and the construction dust is still coming down after I leave.”
After I said that, he immediately got more snippy in tone than before and was like “Well, if it’s gonna take you 6, 7, 8 hours, then that’s just not going to work for me. So just let me know what you think after you see the pictures.”
I said I was driving and as soon as I was home from this job, I’d take a look, and he literally just hung up on me.
Looking at the photos, I saw they were all very zoomed out clips of the space, which isn’t really all that helpful for me in determining scope. Then I see his message about how he doesn’t expect this to take longer than 3 hours and I was sort of like, okay dude, you’re already stressing me out! I don’t think you’re worth it!!
But I’m just wanting some second opinions about post-construction cleaning. Was I correct in assuming this was a much larger scope than he was envisioning? Or was I a big baby about it? Thank you!!




14
u/WhoKnows78998 4d ago
Accept the task and clean to a level of detail that 3 hours allows you to do 🤷♂️
6
u/Chebura5ka 4d ago
"Finishing remodeling" means there’s been renovation work, so why are we estimating the cleanup like it’s a regular cleaning? Apparently, in some people’s universe, it’s all the same and three hours should be plenty. I’d love to see them try it themselves. How many times will you need to change the water? How many times will you have to wipe the same surface? You may need to wash the walls too. Mopping the floors doesn’t magically remove the construction dust from everything around them. You finish cleaning, and more dust settles. And "just ask the client for an extra hour" doesn’t solve it either. They can agree, and halfway through you discover it needs several more hours. Even photos don’t tell you how much fine dust is everywhere or how stubborn it is. That’s exactly why treating post-renovation cleaning like a regular three-hour booking sets unrealistic expectations from the start.
5
u/DonQNguyen 4d ago
I always cancel or forfeit on Clients that do not adhere to my time estimates needed. If they are cheap, they can do it themselves. This has always worked out well for me as it weeds out the cheap charlies and those looking to take advantage of my skills, time, and labor. Pass on these types. Better clients out there.
4
u/Aromatic-Still1987 4d ago
I never let customers say how long it should take. I know my job and how long it takes depending on the job. For post construction can be up to 2hrs per room. I recently did a whole house deep clean post construction, including inside every cabinet, dust every single item in the house (and re-organise every cabinet), living room deep clean, bathroom deep clean, bedroom deep clean ecc... it took 10hours!!!! I split in 2 days because it was really A LOT! So I did 5hrs per day, and we are talking about a ONE bedroom flat... so yeah, even 6-7-8hrs won't be enough.
4
u/leDanielx2 3d ago
I do finish carpentry and have cleaned up homes after a reno. Cabinets alone could take a couple hours to really get all the dust . Let this one sail by
3
u/LeadershipBoth6725 4d ago
I would tell him that it could take anywhere from 3-6 hours to complete correctly, that you just can’t tell from pictures. Make sure you tell him this on the chat. That way if he accepts your good and if he doesn’t like the answer then he will cancel the job, that is better for you on the TR algorithm.
3
u/Altruistic_Fold8993 2d ago
So many red flags. When a customer tells me how long a job should take I automatically decline. I’m glad you forfeited the task.
3
u/donovakm 1d ago
Reject based on his attitude
1
u/krayzai 1d ago
If they want to decide how long it takes that’s fine. If they want you to cap it at 3 hours you leave after three hours with what you’ve completed.