Due Diligence None of the next three new uranium mines ships a pound before H2 2028

Post image
9 Upvotes

Version 2 of the chart from two weeks ago, with both fixes from that thread. Bannerman's Etango is on it, and each mine now has two dates: when production starts and when uranium first sells. Thanks u/YouHeardTheMonkey for both.

All three moved later in their CEOs' own words. For supply, that's fewer new pounds in 2027 and 2028 than the plans of a year ago had.

Which of the three do you think hits its date?


r/UraniumSqueeze • • 6h ago

News Beyond Arrow, Beneath PCE $NXE

2 Upvotes

NexGen's PCE discovery, just 3.5 km from Arrow, continues to redefine its geological boundaries. Today's drilling update reveals not only an expanding mineralized footprint but also stronger evidence of high-grade continuity.

What the latest drilling reveals:

  • High-grade vertical extent: 739m (+15%).
  • High-grade strike length: 238m (+13%).
  • Overall mineralized footprint: 905m vertically (+29% in 2026) and 678m along strike (+9%).
  • RK-26-300: A cumulative 10m above 10,000 cps, including 1.8m above 61,000 cps.
  • Southwest emerging as another growth target, with potential for further extension at depth.

I'm particularly encouraged by the improving geological confidence alongside PCE's expansion. Discovering mineralization is one thing; establishing its scale and continuity is another. With significant drilling still underway, the maiden resource estimate targeted for early Q3 2027 becomes an increasingly compelling catalyst.

What's everyone's outlook for PCE now?


r/UraniumSqueeze • • 11h ago

Investing How I think about the AI-to-uranium chain, and CCJ vs URA vs URNM

2 Upvotes

I run a small research site (AtomProphet) and wrote up how I think about the AI-to-uranium chain. Curious what this sub thinks.

The numbers I'm working from:

  • IEA: data centers used about 415 TWh in 2024. Their base case is about 945 TWh by 2030. In the US alone that's roughly 240 TWh of added demand, about +130%.
  • WNA reference scenario: reactor requirements of about 68,900 t of uranium in 2025, rising to just over 150,000 t by 2040.
  • Mines can't just turn on when the price goes up. Permitting, financing, conversion and enrichment all sit in between.

On the vehicles:

  • CCJ: the big liquid Western producer, but production doesn't rise just because spot does.
  • URA: broader (57 holdings, Cameco about 22%), so it's diluted with component makers.
  • URNM: purer (about 82% equities, 18% physical), but with a 0.75% fee and more small-cap risk.

What would break the thesis for me: AI efficiency outrunning compute growth, gas winning on speed and cost, or a big accident or overrun turning politics against nuclear.

Writeup: https://atomprophet.io/posts/nuclear-inevitability/

I also built a free interactive map of how these bottlenecks connect (power, fuel, grid, minerals): https://atomprophet.io/tools/cascade/

Not investment advice.