Okay, hear me out:

CFNR (California Northern Railroad) owns the trackage on the left side, right by the I-5 alignment.

CAHSR CAN and SHOULD consider purchasing this ROW and upgrading it to do DIESEL service at 110/125 mph: they can SKIP CEQA because they are doing upgrades to institute passenger service. It would essentially be just like Airo service like Amtrak Virginia

Quoting the portion from the California code:

CEQA does not apply to the following mass transit projects:

(a) The institution or increase of passenger or commuter service on rail lines or high-occupancy vehicle lanes already in use, including the modernization of existing stations and parking facilities;

(b) Facility extensions not to exceed four miles in length which are required for transfer of passengers from or to exclusive public mass transit guideway or busway public transit services.

AND, by doing these upgrades, can get to Tracy to interface with Bay Area Transit like ACE or (eventually) Valley Link.

Upgrading this existing ROW and purchasing the rest of the ROW for the Merced extension is a great idea and the money to do this would be provided by completely axing the Bakersfield extension (for now).

We also don't need NEPA or other reviews because... f*** the feds they aren't giving us any more money anyways.


r/cahsr • • 1d ago

The New Bakersfield Station Location is Actually a Good Thing - if Downtown Option Remains on Table For Palmdale Extension

38 Upvotes

The original plan in the IOS called for a station to be built in Bakersfield proper, with the construction stopping and starting again in their downtown core, once a Palmdale extension was ready for construction. This would’ve been unnecessarily expensive and a headache for commerce and folks there. The idea of a station just outside of town isn’t a dream scenario, but it gets the IOS complete, opening the door for funds to the rest of the line.

If Bakersfield ultimately wants a better scenario, the door could be open (and hopefully is) for a downtown station once the Palmdale extension gets initial funding. The new station could be included in the preliminary plans, later designs and then construction. The benefit of course is that construction through the downtown core can be done in one go.

Ideally there would've been enough financial support to build it in the IOS and have the line’s tracks built through and out the other end of the city. There it could’ve been picked up for later construction, of course. I think this is one of the better money saving moves that CAHSR has made, assuming of course the downtown station can be revived later.

Fresno and Hanford stations still look good, and Merced will hopefully get things as they should be.


r/cahsr • • 3d ago

CAHSR finally updates their construction progress from June to August

Thumbnail buildhsr.com
58 Upvotes

r/cahsr • • 4d ago

Consultants return $1M+ to CAHSRA after finding taxpayers paid for luxury, leisure travel (Fresno Bee)

Thumbnail
fresnobee.com
188 Upvotes

r/cahsr • • 5d ago

What could you do to speed up California High Speed Rail construction?

54 Upvotes

Voters approved CAHSR in 2008 via a ballot initiative and construction began in 2015. But spolier alert, after years of pumping in billions of dollars, construction is still taking too long to finish, a single track has not been laid, and faced criticsm for being a boondoggle even if nations such as in Japan, Countries within EU, & Even China, mastered it....

President trump did support some rail in terms of the UP-NS merger and the Amtrak Acela. Heck, some presidents ride behind trains!

Imagine, if you're a future governor of California or President. How would you handle it? especially since cars & airplanes are the norm...


r/cahsr • • 6d ago

CAHSR Video: 2026 Summer Progress Report

Thumbnail
youtu.be
56 Upvotes

r/cahsr • • 6d ago

Construction progress visualizer (2019-2026)

Thumbnail
cahsr.fyi
168 Upvotes

Hey everyone, I made a website to visualize the progress of CA High Speed Rail construction since 2019. The main inspiration for this was because I was constantly looking up the locations of grade separations for research and the BuildHSR website remains out of date or is missing projects entirely. I added a handy search feature (Ctrl-F on desktop) to jump to the location of a structure.

I also created an animation for Move California on Instagram and if you'd like to see high speed rail built faster in the future, be sure to sign the petition.


r/cahsr • • 7d ago

Bullet Trains and New Homes Are on a Collision Course in California

Thumbnail
bloomberg.com
152 Upvotes

r/cahsr • • 7d ago

"Fall 2026 California High Speed Rail Construction Update - 70 Structures COMPLETE!" (video by @mateosdronefootage on Youtube)

Thumbnail
youtube.com
122 Upvotes

r/cahsr • • 7d ago

New CEO discusses future of California's high-speed rail project (CA Politics 360)

Thumbnail
youtube.com
85 Upvotes

r/cahsr • • 8d ago

CEO’s gone; High-Speed Rail still plans to lay first tracks this year. Does it need the win?

Thumbnail
amp.fresnobee.com
179 Upvotes

r/cahsr • • 9d ago

“NEWS RELEASE: California High-Speed Rail Celebrates Completion of Largest Structure in the Central Valley, Surpasses 20,000 Jobs Created” - hsr.ca.gov

Thumbnail hsr.ca.gov
328 Upvotes

The California High-Speed Rail Authority has celebrated the completion of the Hanford Viaduct. They have also announced the completion of numerous other structures, those being the Conejo Viaduct, the Cole Slough Bridge, the Dutch John Cut Bridge, the Houston Avenue Grade Separation, and the Deer Creek Viaduct.


r/cahsr • • 10d ago

Hanford Viaduct Ribbon Cutting

Thumbnail youtube.com
65 Upvotes

r/cahsr • • 10d ago

Is DTX/the Portal "fully funded" now?

Thumbnail reddit.com
25 Upvotes

r/cahsr • • 12d ago

Former CAHSR CEO Choudri will be doing an interview Thursday

Thumbnail linkedin.com
74 Upvotes

r/cahsr • • 18d ago

They did a damn good job on the new Burbank terminal — so where will the HSR entrance be? Inside the terminal after security?

73 Upvotes

It would make sense for the entrance to be within the terminal itself.


r/cahsr • • 18d ago

Joe Stephenshaw has been appointed Interim CEO for the CAHSR

Post image
119 Upvotes

r/cahsr • • 19d ago

Xavier Becerra wins, Democrats take control of Congress. What will this mean for CAHSR?

Thumbnail
nytimes.com
141 Upvotes

r/cahsr • • 19d ago

CAHSR News November 2026 (Lucid Stew, YouTube)

Thumbnail
youtube.com
51 Upvotes

Interesting update of note: Track laying has been delayed until 2027 (timestamp 9:43)


r/cahsr • • 20d ago

New CEO Discussion

48 Upvotes

I want to start by saying I thought Choudri did a great job, and I was disappointed he ended up stepping down. Aside from the KPMG and consulting stuff that came out in the last few months, it was clear that his work on restructuring the authority to reduce costs and speed up construction was working. Based on the various drone channels, the IOS grade separations and viaducts appear to be progressing as quickly as ever.

That said, the next step is to pass the legislative items, including permitting and funding. This brings me to the next CEO. Obviously, experience with large rail projects is a plus, however, would it be more beneficial for the new CEO to be someone more adept as a politician/lobbyist for the authority to push these items? Would this be easier to find than trying to convince a more established figure in the rail development field to take the job, given how quickly Choudri was scapegoated? Would it help to get this point across to the board through the public comment period at their next meeting? Would it be better to have a transit nerd type? Are we cooked no matter what with Becerra? Curious to hear what people think


r/cahsr • • 20d ago

What would need to happen?

17 Upvotes

What would need to happen ( politically, economically and other areas) so that CAHSR project could come into life faster?


r/cahsr • • 23d ago

I know nothing about CAHSR. Why can't the Dem Govenor, Supermajority state legislature, and Supreme Court RAM this project through?

126 Upvotes

hello, this is a comment!


r/cahsr • • 23d ago

Could TOD and property taxes help fund San Jose–Gilroy Caltrain & HSR upgrades?

44 Upvotes

Building on Streets for All's EIFD analysis, I developed a similar model for the San Jose–Gilroy corridor to estimate how much funding could be raised for rail improvements.

For context, CAHSR's 2026 Business Plan identifies an additional $2–5 billion in infrastructure upgrades needed for this segment.

So, could we capture some of the future property-tax growth around Caltrain stations to help pay for this?

I looked at two-mile areas around Capitol, Blossom Hill, Morgan Hill, San Martin, and Gilroy Caltrain stations, with two scenarios: conservative development and ambitious TOD clusters.

The model accounts for existing property appreciation and reassessments under Proposition 13, new housing and commercial development, and potential increases in property value from faster Caltrain service and future HSR service.

Here's what I found:

  • $491–559M in total discounted EIFD revenue over 45 years
  • Of that, about $467M comes from property appreciation and reassessments on existing properties.
  • New TOD and rail-related appreciation contribute another $24–92M, depending on how aggressively we develop around stations.
  • This comes out to about 10% to 25% of the needed cost to build out San Jose - Gilroy for HSR.

The distinction is that an EIFD captures a portion of future property-tax growth, including growth that would happen anyway. Transit improvements and TOD add to that revenue by creating new taxable development and potentially increasing surrounding property values.

That's a lot of money toward grade separations, electrification, additional tracks, and other improvements. Combined with state and federal funding, this could make a meaningful dent in the $2–5B needed - as much as 25%!

And EIFDs don't require raising property tax rates, although participating governments would have to dedicate some future revenues to infrastructure rather than other services.

One caveat: these are preliminary estimates based on publicly available citywide assessments and estimated station-area property values, not a completed parcel-level analysis, so they are not entirely accurate.

Spreadsheet and assumptions

Side note: I've already covered the actual context of the grade separations on the ground, and I think we can grade separate well over half of the corridor with just $500M, as there are a large chunk of grade crossings that can be closed as is with no changes, or a new road connection built to facilitate closing of the crossing (e.g., Blanchard Road).

I'm curious what others think, especially about whether Santa Clara County, VTA, Caltrain, and the cities should coordinate on something like this, and whether they should invest in substantially more housing around stations.


r/cahsr • • 24d ago

High-Speed Trains For California - June 1992 study

Thumbnail escholarship.org
30 Upvotes

r/cahsr • • 24d ago

CAHSR publicly announces Siemens trainset contract

Thumbnail hsr.ca.gov
159 Upvotes