r/electricians • u/KeyEstimate8150 • 4h ago
Apprentice
Sub 2 hour panel as a 3 month old apprentice. Does it look good to yall or is there anything I could work on? Other than the missing circuit which will have to be pulled and re-ran as the retaining wall they built is too close to the building and there isn’t enough room for the ac units to fit 🤦♂️ and ugly labels as I ran out of number stickers. Power comes in from the bottom and for some reason the neutral bus bars were shorter than expected so that’s why everything is about 5 slots down from the top. Have to wait to see what the boss says about that but I’m pretty sure it’s a manufacture defect since all the panels had the same part number and like 4 out of about 20 were like this
•
u/AutoModerator 4h ago
ATTENTION! READ THIS NOW!
1. IF YOU ARE NOT A PROFESSIONAL ELECTRICIAN OR LOOKING TO BECOME ONE(for career questions only):
- DELETE THIS POST OR YOU WILL BE BANNED. YOU CAN POST ON /r/AskElectricians FREELY
2. IF YOU COMMENT ON A POST THAT IS POSTED BY SOMEONE WHO IS NOT A PROFESSIONAL ELECTRICIAN:
-YOU WILL BE BANNED. JUST REPORT THE POST.
I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.
8
u/DangitThatHurt 4h ago
Looks good, typically I put all of my larger loads as close to the feeder lugs as possible. So I would have staggered the two pole circuits on the right and the left at the bottom of the panel in your situation. It's just a nitpicky thing. There's no code requirement that drives it. My thought is it keeps the larger loads from having to travel through more busbar than necessary.
2
u/cletus72757 4h ago
Nice work kid. 👍
1
u/CovetousCargo03 3h ago
Looks similar to my first panel, one thing I would have done different on mine is try to land wires on top of the panel on the side that the breaker will be, that way the wires cone straight down and don't cross up top. I know sometimes the boss wants it done quick though rather than taking the extra time, and sometimes there isn't a plan for the panel schedule. Looks good though
1
u/ThoopidSqwrl 1h ago
Apprentice also here, looking for a Journeyman to answer. I haven't done really any panel work yet, but shouldn't three be more slack up to for possible future service?