r/glassblowing • u/Taonuviel • 3h ago
Hot Shop as part of larger studio
Planning a makerspace arts studio with glassblowing as a future phase. I'm evaluating a potential building now and want to ensure it can support a hot shop later without major structural changes.
What are the non-negotiables I should check during the initial walkthrough? Specifically interested in:
- Minimum ceiling height for ventilation and working length
- Floor load capacity for furnaces and annealers
- Electrical service requirements (3-phase?)
- Makeup air and exhaust possibilities
- Zoning restrictions for industrial equipment in mixed-use areas
- Dimensions for the working area
Any red flags that would make a space a hard 'no' for future glass work? Thanks in advance.
