r/hyperloop • u/Taylooor • Jan 15 '16
Would it be conceivable to install hyperloop directly onto existing rail lines?
Since the train infrastructure is already in place, could the hyperloop system be bolted onto the existting train rails to save a lot of time and money? Or, because of the increased speed, are the existing lines not straight enough? Would there be a way to overhaul the existing lines to make it work or would it be too cost prohibitive?
1
Upvotes
View all comments
Show parent comment
1
u/[deleted] Jan 19 '16
The older standard for French LGVs (high speed lines) was 4000 m, the current one 7000 m. Needless to say, a full-speed TGV would go flying off the rails in a 125 m curve.