I do not usually post complaints online but at this point I feel I have nowhere else to go to try and get some movement in my situation else I will be seeking another provider as I canāt live without proper internet.
TL;DR: Ordered 42 days since sign-off. Upfront they said it was straightforward because they could reuse the existing BT/Openreach duct with no road digging. They booked external works for 29 Oct (1-3 days) then went completely silent and they have spent the last 3 weeks claiming they're "waiting on civils" with zero updates even though an advisor admitted their own system shows a civils job was already scheduled on 29th October and that I had confirmation of it taking place. My original contact brushed me off as soon as I signed the permission form and I'm stuck on a shitty mobile connection close to cancelling
Since all the documents were signed on the 8 Oct, six full weeks ago, I have felt that the service and communication have been completely unacceptable. I'm close to binning the order off and switching providers because I cannot keep living and working off a shitty mobile connection indefinitely.
The numbers (as of 19 Nov):
- 65 days since ordering (15 Sept)
- 42 days since Hyperoptic confirmed my signed permission form (8 Oct)
- 34 days since the pre-install survey was completed (16 Oct)
- 21 days past the booked external works start date (29 Oct)
- 18+ follow-up emails and ticket replies, plus multiple live chats
- 2 separate support tickets open
- 0 concrete updates since 29 Oct despite many requests for information
The timeline:
- Pre-sign-off (17 Sept): Hyperoptic's Business Development (BD) contact sent their installation methodology stating in writing that the install is "simple and straightforward" because they reuse the existing BT/Openreach duct to bring fibre into the building, with "no need to dig up the roads".
- 8 Oct: I signed the Occupier permission form and BD confirmed receipt the same day. Up until this point they had been genuinely helpful. Once the paperwork was signed, that completely stopped.
- 14-16 Oct: Pre-install survey booked and completed. Hyperoptic emailed on 16 Oct saying external works were needed and I would get a date within 7 days.
- 23 Oct: Received an official email from Hyperoptic: "Your Hyperoptic external works are booked." Start date: 29 Oct (9am-1pm), stated duration: 1-3 days, promising they would contact me once complete to book the install.
- 29 Oct - 1 Nov: The booked 1-3 day external works window came and went with zero contact.
- 31 Oct - 2 Nov: I emailed BD asking if the works had been completed and when I could book the install. On 2 Nov they brushed me off saying she had no additional info and had arranged for customer service to contact me. Nobody contacted me.
- 3-4 Nov: After chasing twice more, BD pasted an internal Jira ticket reply: "we are awaiting the civil work report. Once this has been sent by the civils team, we will contact the customer, until then, we have no information to provide." I replied asking what that meant and whether the works booked for 29 Oct had even taken place. They never replied again.
- 6 Nov: Support finally opened a ticket stating "we are still waiting on Civils. There is no precise date I can provide." When I asked what they were waiting on the agent gave a generic script blaming outsourced civils, documentation, and wayleaves claiming "there is nothing we can do to speed this up" completely ignoring that external works were already booked for 29 Oct.
- 9-15 Nov: Every single follow-up was met with copy-paste stonewalling and zero movement.
- 18 Nov: Escalated again and pasted the 29 Oct booking confirmation straight into the ticket. On live chat the advisor admitted there may have been internal miscommunication about the civils works because their own system shows a civils job was scheduled matching the email I got nearly a month ago. They opened a second support ticket promising to share full details "during the day tomorrow" (19 Nov). This was the first time where I felt like a support agent looked at the case in detail rather than giving me a flat pre canned response.
- 19 Nov: Chased again by email and on the portal; still silence, still no update, still no resolution.
In summary:
- Hyperoptic sold the install on reusing the existing BT/Openreach duct with no road digging yet now hide behind vague "civils and wayleaves" excuses with zero explanation of what actually needs doing.
- They confirmed external works were booked for 29 Oct, then lost track of their own job and 3 weeks later nobody can tell me whether the work was completed, cancelled, never logged, needs a follow up or something else. I have been left with no information.
- BD was attentive right up until the initial approval was signed then brushed me off into an endless loop of customer service chats that refuse to answer direct questions or move anything forward.
Frankly I am wondering if I should just cut my losses here and choose a different provider, this has been a massive waste of time and energy currently with complete opaqueness from Hyperoptics side with no clear path forward despite my continued persistence to get a proper response.