Derelict RISAT-1 is nearing its reentry.
RISAT-1 was India's first Indigenously developed SAR satellite and after going out of commission in early 2017, it is now close to its reentry. Its lift-off mass was nearly 1,858 kg. Each of those antenna panels are 2×2 meters or 6×2 meters total.
https://en.wikipedia.org/wiki/RISAT-1
Running latest elsets through SatEvo (software) the predicted time of its reentry is coming out to be around 3 December 2026.
-----------------------------SatEvo v0.51by Alan Pickupalan@wingar.demon.co.uk-----------------------------Decay list from input file RISAT1.txt10.8 cm flux = 119.000000Elset Obj # Epoch Decay (Date)1 12017A 38248 26317.672341 26338.095638 (2026 December 4)

Plot source: https://heavens-above.com/OrbitHeight.aspx?satid=38248



Mission Success! GSLV-F18 / NVS-03 Mission Updates and Discussion
GSLV-F18 / NVS-03 (aka IRNSS-1L) launched as scheduled at 18:21:00(UTC)/23:51:00(IST), 30 Oct 2026 from Second Launch Pad of SDSC-SHAR.
Live webcast: (Links will be added as they become available)
| GSLV-F18 / NVS-03 Mission Page | GSLV-F18 / NVS-03 Gallery | GSLV-F18 / NVS-03 Press kit(PDF) |
|---|
Some highlights:
- Primary payload: NVS-03 (~2250 kg) GSO based Navigation satellite.
- Mission duration: ~19 minutes (based on GSLV-F15 / NVS-02 mission)
- Target Orbit : 170 × 37023 km, Inclination = 20.75° ± 0.1°, AoP = 178° ± 0.5°
- Launch Azimuth: 106°
- As a cautionary measure NVS-03 will be launched with its pyro valves in open state.
Updates:
| Time of Event | Update |
|---|---|
| 13 Nov 2026 | NVS-03 reached its 111.75°E orbital slot. |
| 4 Nov 2026 | After four orbit raising burns with cumulative duration of 6164 seconds, NVS-03 has reached 35765 x 36196 km GSO with 29.98° inclination |
| Post-launch | Tracking data for 3 Nov 2026 confirms execution of third orbit raising burn. A1228 (26245A), i=29.89°, A×P=35842.58×34594.95 km |
| Post-launch | Tracking data for 2 Nov 2026 confirms execution of second orbit raising burn. A1228 (26245A), i=29.08°, A×P=37762.79×24550.64 km |
| Post-launch | Second orbit raising burn with duration of 3085.14 seconds has been successfully completed on 1 November 2026 at 18:05:16 (IST). Estimated orbit after the burn is 24691 x 37791 km. |
| Post-launch | First orbit raising burn with duration of 2174.8 seconds has been successfully completed on 31 October 2026 at 16:48 hrs (IST). Estimated orbit after the burn is 5477.6 x 37833.4 km. The satellite health is normal. |
| Post-launch | Two objects have been cataloged. A1228 ( 26245A ), i=20.71°, A×P=37895.59×178.15 km and A1229 ( 26245B ), i=20.70°, A×P=37746.07×170.70 km |
| T + 42m00s | Launch broadcast ends. |
| T + 33m00s | Dinesh Kumar Singh (Director URSC) : Solar panels of NVS-03 deployed. Will take a week to reach its slot. |
| T + 30m00s | Chairman: 170.3 x 38,080 km is the achieved orbit. |
| T + 22m35s | Chairman: NVS-03 has been injected in intended orbit. |
| T + 18m35s | NVS-03 separated! |
| T + 18m25s | CUS shut off! |
| T + 17m00s | Sticking to nominal path. |
| T + 15m35s | CUS performance nominal. |
| T + 13m45s | CUS performance nominal. |
| T + 12m30s | CUS operating at nominal thrust now. |
| T + 11m00s | CUS performance nominal. |
| T + 08m00s | CUS performance nominal. |
| T + 04m58s | GS2 separated, CUS ignited. |
| T + 04m30s | CUS authorized. |
| T + 04m00s | PLF jettisoned. |
| T + 02m40s | GS2 ignited, GS2 separated, CLG initiated. |
| T + 01m50s | S139 core burn out. |
| T minus 00m00s | S139 core ignited. Lift off! |
| T minus 00m4.8s | 4xL40H ignited. |
| T minus 03m00s | OBC in flight mode. |
| T minus 05m30s | External Power withdrawn, Flight coefficient loading complete. |
| T minus 09m30s | GS2 undergoing actuation checks. |
| T minus 11m00s | CUS undergoing actuation checks. |
| T minus 15m15s | Automatic Launch Sequence initiated. |
| T minus 17m00s | Data loggers are ON. |
| T minus 18m00s | Weather is Go. Mission Director has authorized the launch. |
| T minus 19m00s | NVS-03 is polled ready. LV in external hold mode. |
| T minus 20m00s | Polling now, TT&C, Vehicle, Range are go. |
| T minus 24m00s | Now showing vehicle integration process. |
| T minus 29m00s | Official stream is live! |
| T minus 24h00m | Twenty four hour long countdown commenced. |
| 28 Oct 2026 | Mission Readiness Review was held. Most recent NOTAM suggests launch is authorized. |
| 26 Oct 2026 | Time of launch officially confirmed for 11:51 (IST), 30 Oct 2026 |
| 23 Oct 2026 | NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 30 October 2026 |
| 29 Sep 2026 | NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 13 October 2026. |
| 14 Sep 2026 | GSLV-F18 / NVS-03 launch campaign began. |
Primary Payload:
NVS-03 (aka IRNSS-1L) (~2250 kg) : NVS-03 is a second-generation satellite for NavIC constellation for regional navigation and timing services.
Similar to first generation satellites it will have navigation payloads in L5 & S bands and ranging payload in C-band. But additionally, it will have a new interoperable civil signal in L1 band as well.[1] [2]
Like NVS-01 and NVS-02 it is expected to carry only one indigenous Rubidium based atomic clock (iRAFS) developed by Space Applications Centre (SAC) out of four in total, other three being procured. [3] [4] [5]
- Mass: 2,250 kg
- Orbital slot: 111.75°E
- Mission life: 12 years
- Power: ~3 kW
- Platform/Bus: I-2K
NVS-03 is third of the five satellites (NVS-01, 02, 03, 04 & 05) planned to replace the aging first generation satellites that faced problems with their malfunctioning atomic clocks. Initially these second generation satellites were meant to expand upon existing NaVIC constellation [6] [7] but due to setback from failures of imported clocks on many first generation satellites, they will now only serve as replacement to existing fleet. At present only three out of eight NavIC satellites (IRNSS-1B, 1I and NVS-01) remain functional to provide PNT services. [8] Note that four satellites is the minimum amount needed for NavIC PNT services to be functional.
ISRO has sought approval of three more navigation satellites under NavIC Phase-3 to maintain the base layer of seven satellites. Eventually NavIC constellation can be expanded from 7 to 11 satellites which will increase the service area from 1500 km to 3000 km beyond Indian territory.
For Global Indian Navigation System (GINS), ISRO is awaiting approval of twelve satellites initially to be placed in the Medium Earth Orbit (MEO). While about 24 to 30 satellites would be needed in total. [9] [10]
EoI for end-to-end realization of mission ANTARIKSH (Advanced Native Testbed for Analog Research in Indian Kinetography & Station Hardware)
Invitation for Expression of Interest (EoI) for End-to End Realization of Mission ANTARIKSH (Advanced Native Testbed for Analog Research in Indian Kinetography & Station Hardware)
Scope of Work
The vendor is responsible for the End-to-End Realization of Mission ANTARIKSH, which involves design, development, procurement, fabrication, assembly, integration, testing and commissioning of the analog simulation facility, its modules, associated hardware and software, and support infrastructure. The scope also includes operation and maintenance, technical support for mission campaigns, and preparation of associated documentation and reports.
HSFC is responsible for defining the mission objectives, functional and operational requirements, and providing the agreed reference configurations, interface information and mission procedures.
HSFC will review the designs, monitor progress, review test results and carry out acceptance of the identified deliverables. The suggestive division of scope is given below. Detailed requirements and contractual responsibilities will be specified in the subsequent RFP.
Transfer of Technology
Realization of Mission ANTARIKSH involves development and integration of ground-based simulator modules, mission control systems and associated engineering hardware and software.
HSFC may, where required, extend technical support and make available identified technical know-how, reference configurations, interface information, simulation logic and operational procedures to facilitate realization of the facility by the selected vendor/consortium.
Any Transfer of Technology required for the above activities shall be limited to the systems or processes identified by HSFC and undertaken in accordance with applicable ISRO procedures. The scope of such transfer, including technical documentation and training support, if any, will be specified in the subsequent RFP and the applicable agreements.
Quantum of Work
The vendor shall establish one (01) integrated Mission ANTARIKSH simulation facility and support the conduct of six (06) analog mission campaigns in two (02) operational phases, with three (03) campaigns per phase, preceded by a preparatory dry rehearsal.
The total contract period is three (03) years: one (01) year for facility realization and commissioning, followed by two (02) years for mission operations and inter-mission maintenance. The operational period may be extended by up to three (03) additional years, if required by HSFC. Handover of identified systems forms part of contract completion.
Resources
To execute Mission ANTARIKSH, the vendor shall deploy qualified, experienced and trained engineering, supervisory, technical and operational personnel for the design, development, construction, fabrication, assembly, integration, testing and commissioning of the analog modules, Space Specific Engineering Task (SsET) systems and supporting facilities. The vendor shall also provide personnel for mission control, crew and ground support, mission operations, safety, maintenance and documentation, commensurate with the scope and schedule approved by HSFC.
Appendix
The vendor shall design, develop, construct, procure, install, integrate, test and commission the following terrestrial simulation facilities and systems, and provide the operation, maintenance and technical support required for the specified mission campaigns. Detailed configurations, quantities, performance criteria and acceptance requirements shall be defined by HSFC in the RFP and approved design documents.
Closed Roof Facility (CRF):
A. External Structure
The Closed Roof Facility shall accommodate all analog infrastructure modules, supporting infrastructure and associated engineering systems within a common integrated facility.
(…)
B. Internal Structure - Analog Infrastructure Modules
The Closed room facility shall accommodate the following analog infrastructure modules and associated structural support systems, including the internal scenarios comprising of the hardware elements and internal architecture of Gaganyaan and BAS
| ID | Module | Basic Requirement |
|---|---|---|
| AIM - 01 | Gaganyaan Crew Module (CM) | 1:1-scale ground simulation module (3m Ø x 3m height) with compatible crew ingress ladder. |
| AIM - 02 | Gaganyaan Service Module (SM) | Scaled-down, visually representative mock-up (2.75m Ø x 1.8m height) integrated with the CM simulation setup. |
| AIM - 03 | BAS Airlock Module (BAM) | 1:1-scale terrestrial simulation module (4m x 4m x 4m). |
| AIM - 04 | BAS Lab Module (BLM) | 1:1-scale laboratory module with adapter extension (4m Ø x 8.6m length). |
| AIM - 05 | BAS Utility Module (BUM) | 1:1-scale laboratory module with adapter extension (4m Ø x 8m length). |
| AIM - 06 | BAS Crew Support Module (BCM) | Cuboidal crew module (12.2m x 2.45m x 2.9m) accommodating four Astronauts. |
| AIM - 07 | BAS Node / Connector Module (BNM) | A node (2.5m Ø x 3.4m length) connecting BAS Lab Module, BAS Crew Support Module, BAS Utility Module |
| AIM - 08 | Neutral Buoyancy Simulator (NBL/NBS) | A temporary/semi-permanent aquatic simulator (10m x 10m x 5m - depth) with submerged static BAS module mock-up. A dedicated water supply, filtration, circulation and drainage provisions to be made. (refer the diagram for more details & Infrastructure requirement section) |
| AIM - 09 | BAS static module for NBL operations (BNM) | 3:4 - scale static BAS module limited to only external structure. |
| AIM - 10 | Supporting Structural Truss System (SSTS) | A MS supporting structural Frame to support the BAS modules. |
C. Internal Structure - Supporting Infrastructure
The Closed Roof facility shall provide the following support facilities necessary for crew accommodation, mission operations, medical support and facility maintenance.
| ID | Facility | Area | Requirement |
|---|---|---|---|
| SI-01 | Mission Control Centre (MCC) | 45 m2 | Mission monitoring, operator stations, communication and telemetry infrastructure (7m × 6.5m). |
| SI-02 | Astronaut Isolation / Crew Quarters | 50 m2 | Accommodation for 04 crew, (7m × 7.2m) with sleeping pods, toilets, showers, galley, lounge and tabletop trainer. |
| SI-03 | Ground Crew Accommodation | 100 m2 | Accommodation for 10 personnel (10m × 10m) with sleeping areas, lockers and segregated sanitation facilities. |
| SI-04 | Medical Room | 50 m2 | Medical assessment, emergency stabilization and treatment facilities (7m × 7.2m). |
| SI-05 | Visitor & Media Area | As required | Controlled visitor reception and observation facilities. |
| SI-06 | Mechanical / Machine Room | 100 m2 | Generator, mechanical services, maintenance and equipment storage (10m × 10m). |
| SI-07 | Pump Room | 50 m2 | General water supply, NBL water services and related pumping equipment (5m × 10m). |
Space Specific Engineering Tasks (SsET):
Provide the following fifteen (15) principal SsET systems, with the mounting, power, controls, communications, safety provisions and facility/module interfaces required for integrated mission operations.
SsET 01 IVA and EVA Simulation Suits: Provide simulation suits reproducing the selected fit, mobility, ergonomic and operational characteristics of intra-vehicular and extra-vehicular suits, with applicable cooling, communications, monitoring and suspension interfaces.
SsET 02 Upper Torso Compression System: Provide controlled upper-torso compression hardware for representative launch, ascent, abort and re-entry loading cues, integrated with the crew seat and coordinated simulation controls
SsET 03 Vibro-Acoustic Simulation System: Provide crew-seat motion/vibration and acoustic simulation hardware to reproduce controlled cues associated with launch, ascent, abort, re-entry, descent and splashdown, synchronised with the mission sequence.
SsET 04 Docking Simulation Kit: Provide joysticks, crew-console interfaces and computing/control hardware for rendezvous, proximity operations, docking and berthing simulations, with real-time visual feedback and interfaces to the Mechanical Docking Platform
SsET 05 Docking Adaptors and Hatches: Provide representative operable docking adaptors and hatch assemblies for crew transfer, opening/closing, latching/unlatching and simulated capture procedures at the designated module interfaces.
SsET 05.1 Mechanical Docking Platform: Provide the associated controlled-motion platform and payload-module interface for physical approach, alignment, contact, capture and undocking simulation, integrated with SsET 04 and SsET 05.
SsET 06 Internal Gravity Offload System: Provide body-weight offloading and movement-tracking hardware for simulated microgravity translation, equipment handling and hatch operations within the BAS habitation/laboratory module, with suitable harnesses and emergency recovery provisions.
SsET 07 Bharat Arm: Provide manually controlled and automated robotic-arm configurations for payload positioning, alignment and representative berthing operations, with compatible end-effectors, operator controls and protective interlocks.
SsET 08 Non Precision Planar Air Bearing Floor and Miniature Robotic Arm: Provide an air-bearing table and miniature robotic-arm system for low-friction planar movement of spacecraft/module models, supporting proximity, docking and berthing simulation and control-algorithm evaluation.
SsET 09 Space Motion Sickness Induction Chair: Provide a controlled yaw-rotation chair for vestibular adaptation and sensorimotor studies, with occupant restraints, monitoring interfaces, operator supervision and emergency stop provisions.
SsET 10 Extra Vehicular Activity Mobility Simulation Systems: Provide Skylift and suspended EVA configurations for maintenance familiarisation, external task positioning and gravity-offloaded translation, with compatible suit interfaces, restraints and recovery arrangements.
SsET 11 Deployable Solar Array: Provide electromechanical deployment/stowage demonstrators for the Gaganyaan service module and representative static BAS solar-array assemblies for EVA familiarisation, inspection and maintenance rehearsal.
SsET 12 Camera System: Provide fixed and portable camera systems for crew/activity observation, operations monitoring, inspection and mission recording, integrated with the designated module locations and Mission Control Centre.
SsET 13 Orbital Projection Screen: Provide an integrated visual display system presenting synchronised orbital Earth views, space backgrounds and day/night transitions for module viewports and EVA simulation activities.
SsET 14 Health and Fitness System: Provide the agreed exercise, physiological countermeasure and crew-monitoring hardware for analog human-performance studies. The final equipment selection, monitoring scope and operating protocols shall be confirmed by HSFC in the RFP.
SsET 15 Virtual Reality Systems: Provide virtual-reality equipment and associated simulation interfaces for the mission training scenarios specified by HSFC. The final scenarios, hardware configuration and integration scope shall be confirmed by HSFC in the RFP.
r/ISRO • u/vineethgk • 1d ago
India’s satellite supply chain ‘highly dependent on imports’, says IN-SPACe report
IN-SPACe to make advance payments non-refundable for rocket launches after customers pull out of upcoming SSLV launch which will now carry only two satellites weighing around 60 kg each.
r/ISRO • u/ryuKEN-19 • 2d ago
People working at isro , how has ai impacted , and which ai models are u using?
Title
On PSLV-N1 maiden launch delays to early 2027, "The delays are a result of various issues such as coordination with the payload and the available launch window" said A T Ramchandani, Senior Vice-President and Head, L&T Precision Engineering & Systems.
Lunar Polar Exploration@JAXA(LUPEX on X: "Last week, we held the workshop “Discussion on Characterization of the Lunar Polar Volatiles and Landing Site Candidates for Volatile Exploration Missions” with researchers and engineers from ISRO, JAXA, ESA, and NASA.
x.comLast week, we held the workshop “Discussion on Characterization of the Lunar Polar Volatiles and Landing Site Candidates for Volatile Exploration Missions.”
Researchers and engineers from ISRO, JAXA, ESA, and NASA gathered to discuss the characterization of lunar polar volatiles and potential landing site candidates for future volatile exploration missions.
The workshop also provided a valuable opportunity for members of the ISRO-JAXA Joint ODCT to meet in person for the first time and exchange perspectives on lunar polar science and exploration.
The group photo includes Joint ODCT members together with students, researchers, and leadership from PRL, reflecting the broad collaboration supporting future lunar exploration activities.
It was a productive and inspiring discussion, highlighting the importance of international cooperation in advancing our understanding of the Moon’s polar regions.
OrbitAID plans on-orbit satellite refueling demonstration in December and a commercial mission by end-2027
Official IN-SPACe Announcement of Opportunity for making available Indian Orbital Resources at 93.5°E to the Non-Government Entities
inspace.gov.inr/ISRO • u/swasthikvisakh • 5d ago
PhD Positions in Astrophysics (Jan 2027 Intake) at IIST Thiruvananthapuram – Galaxies/CGM, JWST Exoplanets, and GRBs/Radio Transients (Deadline: 1 Dec 2026)
Applications are open for January 2027 PhD positions in Astrophysics at the Department of Earth and Space Sciences, IIST Thiruvananthapuram:
- Position 1 (Code PES01 – Prof. Anand Narayanan): Connecting Galaxies to Their Gaseous Environments (CGM/IGM) OR Studying Exoplanet Atmospheres with JWST (Requires valid CSIR/UGC-NET, NBHM, JEST, or GATE score)
- Position 2 (Code EES02 – Prof. Resmi Lekshmi): Catching Cosmic Explosions — GRBs, gravitational-wave counterparts, TDEs, and radio transients (Open to CSIR/UGC JRF holders)
- Fellowship: ₹37,000/month (JRF) | ₹42,000/month (SRF after review)
- Last Date to Apply: 1 December 2026 (23:59 hrs)
- Apply Online:https://admission.iist.ac.in
r/ISRO • u/Low_Difficulty7225 • 5d ago
Got selected as a Scientist SC in civil.
I wanted to know about the joining as i didn't get any mail till now, what are job locations for civil, career prospects and work culture. If anyone working there as civil engg please feel free to connect.
Gaganyaan G1 delayed again: First uncrewed launch unlikely before February 2027
r/ISRO • u/anshumaanps • 8d ago
Gaganyaan is set to be launched in late December or early January 2027
Preparations for the first unmanned flight (G-1) of India's first human space mission 'Gaganyaan' are in the final stages. Union Minister Dr. Jitendra Singh told Bhaskar on Wednesday that Gaganyaan is set to be launched in late December or early January 2027.
r/ISRO • u/totaldisasterallthis • 8d ago
New (free) book launch: Crafty Moon-craft, showcasing unique slices of creativity in lunar exploration by India’s Chandrayaan missions 🌙
Crafty Moon-craft is available worldwide, and the Ebook version is free for everyone. Details & download at https://jatan.space/crafty-moon-craft-book/
r/ISRO • u/Independent-Sun8266 • 8d ago
Confused about the Eligibility criteria for scientist at isro.
I am a dual degree student at iit kgp. My branch is manufacturing science and engineering ( its a sub branch of mechanical engineering) with integrated mtech in industrial engineering. Can i give gate and later icrb to join isro?
r/ISRO • u/japanese-sushi- • 8d ago
Masters After Joining
Can a BTech graduate who joined as Scientist C opt for higher studies after 3 years of service ?
Like paid leaves or similar options ?
What’s the criteria and chances of leave being approved in centres like VSSC.
Jio begins talks with ISRO, Skyroot Aerospace and other homegrown companies amid satellite launch prep
hindustantimes.comr/ISRO • u/alpachinohacks • 10d ago
Has ISRO Started recruiting civilian astronauts through internal channels ?
I heard a rumour that ISRO started recruiting civilians through internals channels for the Gaganyaan program. Has anyone heard about it ? I dont know how much of it is true. But putting it out here to see if anyone has any information on this.