🗺️ Fantasy Map Building a more interconnected Queens
Over the past couple of years, I have looked at a bunch of fantasy train maps and have studied them in and out. Looked at Vanshnookenraggen’s articles on NYC Subway expansion and I have even gone outside and touched grass and looked the communities that have public transportation in them and the communities that don't and with all of this research and a hint of fantasy I think I have made one of the best options for queen's subway expansion that takes into account other infrastructure projects happening in and around the city that may affect further expansion. So here are the routes for what is in these screenshots (I might post another one about the Bronx and Brooklyn at a later date)
N - Coney Island Stillwell Ave via Sea Beach to Laguardia Airport
Q - Bay Ridge 95th St to Little Neck Pkwy LIE
G - Prospect Park to Bell Blvd (This route could be cut back to flushing and instead have a light rail take over for a more cost-effective project)
K - Church Ave to Springfield Blvd Queens Borough Community College
E - World Trade Center to Glen Oaks 264th St
A - Inwood 207th St to 168th St Merrick Blvd
F - Coney Island Stillwell Ave via Culver to 168th St Merrick Blvd
T - Broad St to Far Rockaway or Beach 116th St
7 - 34th St Hudson Yards to Port Washington
J - Fulton St to 168th St Merrick Blvd
CQX - East 180th St to Howard Beach via JFK Airport (This line could be cut back to Jamaica Center and the AirTrain is left alone since the port authority don't like to play ball)
Now in order for these routes to be built a lot of changes would have to be made with switches around the system for trains to go onto their respective routes. Now let's get into the more minor construction
The Broadway line as we all know it is one of the slowest and confusing line to some people in all of NYC and especially with the city hall S-Curve we run into one of the biggest capacity issues in the system. I believe that can be fixed with the addition of two ramps new ramps after 57th St so the local tracks can go onto the 63rd St Line without interrupting the express trains from using the 59th line. N and Q trains will instead run express and then run to Queens via the 59th St line and no interruptions from the local trains. The next one is pretty simple which is to add switches at 50th St so C trains can merge onto the A line going towards Brooklyn and E trains run on their own. Finally for the 7 line and G line we have two options. Option one we could build a short tunnel that has 7 trains merge with the port Washington branch after flushing and then have G trains run via the line from Mets willets point to main st and turn towards college point. Option two is to rebuild Mets willets points tracks all together and have G trains use the 7 tracks to Main St and then have the 7 use the Port Washington tracks from Mets. This option includes a light rain expansion of the CQX via the proposed G train route. I know this last part is not minor, but I added it here due the money in this fantasy world already being put toward the project.
Now the major construction part will be cut down because I'm not going to fully explain the ins and outs of each line just a basis. One of the first major hurdles will be the G and K train in Bed Stuy, as in order for these routes to be built we have to rebuild multiple stations and reroute one bus route. The Franklin Ave line is going underground and is becoming a double stacked line to reduce the need to demolish buildings on Lafeyette Ave when merging with the Line. At Bedford and Nostrand the tracks after this station have to be rebuilt so Church and Prospect bound trains don't merge. The queens bound trains will though. After this the K line runs to Marcus Garvey and makes a stop here and then swerves toward Vernon Ave and then makes another stop at Broadway to transfer to the J and M trains. From there a new portal will be built in place of where the tracks connect to the Myrtle Ave Line. This is where the bus reroute would have to take place because of how low the tracks over myrtle Ave at this point. B54 buses will now run down Broadway to where the B38 is and run via that route back towards its original routing that or it terminates at Broadway. At Metropolitan Ave the station will rebuilt so trains can run via an elevated section to the lie and then dive underground into a new underground 4 track station with the Q line. From here another portal will be made after the Grand Central Pkwy on a 3-track line via the Lie. From here tracing back over the Q line to Sunnyside, new tracks will be made from the 36th St station so Q and G trains can stop here. After this the tracks will dive under the QBL line and Sunnyside Yard to a new station at 46th St which is where G trains split to run via Northern Blvd and Q trains run via the Port Washington tracks and some added tracks to Woodhaven Blvd. The rest of these are pretty self-explanatory I believe and also do require a part 2 about Brooklyn.
So, the main justification I have come up behind some of these lines comes from others' ideas, bus routes, and simply visiting some of these communities. The G and K train ideas come from the B44 SBS, B38, B54, B52 and the idea of a Utica Ave extension. Building these lines and rearranging tracks allows for people coming from downtown Brooklyn to take the train and allow for the avenues where these buses run on to be a lot less congested. The G line is more of a stretch but can work in theory. People take the G train to Franklin Ave and transfer to a Nostrand ave bound train and continues their journey from there towards sheephead bay. Yes, this is not a one seat ride but will be a ride most B44 riders will opt for. But the reasons label here have a stark contrast for mu justification of the 7. Sending the 7 via port one allows for a cheap solution to extending the 7 in queens and allows for trains to use existing infrastructure along ports route and save a lot of money on construction cost. Now yes port customers are adding more time to their commute which is approximately 14 minutes (this does not account for 7 express trips) they would see a lot more consistent service along the route and a way bigger boom of small businesses in the area from it. Finally, the real monster which is the CBX. This will capitalize off of the IBX and become a new alternative or the replacement for the Q44 SBS. There are two issues to it meeting its max potential though, which are the Whitestone bridge and the port authority. Whitestone Bridge would have to be looked into to inspect if it could hold up a light rail and its tracks running over it every 10 minutes with 5 car trains. If possible, this would solve most of the issue with Queens Bronx connection and easy interqueens travel even more than Queenslink would do when built (it will be built). But this is all of my ideas for expanding Queens subway lines. I'll post part 2 of this over thanksgiving break as I'm fighting for my life for my civil engineering degree.