r/sigenergy • • 11h ago

Battery EECA - anyone from Sigenergy covering NZ here?

3 Upvotes

Lines company Orion is running a pilot (Halswell Flex) with subsidies for batteries. Sigenstor is not listed as a approved battery with the EECA which means its ineligible, but it seems to be an easy opt-in and there are some Goodwe options on there already so it doesn't seem very restrictive.

What are the odds of Sigenergy going for approval so we can take advantage of the pilot?


r/sigenergy • • 56m ago

Help / Advice SigEnergy DC V2X compatibility with MG vehicles

1 Upvotes

Looking to buy a Sig DC V2G charger but unsure if it will work with our MG 5.

There's one successful test reported on the Sig website (https://www.sigenergy.com/en/view-car-brand) but it would be very reassuring to hear some real world stories!


r/sigenergy • • 5h ago

Help / Advice DC to DC Compatability

1 Upvotes

Hi I have a sig 32kw battery and just bought a Geely EX2 Aspire. Is DC to DC compatability workable so the car can charge my home. Sig says the EX5 is but not yet tested EX2. I live in Brisbane, Australia on the energex network.

Any experience with this would be appreciated


r/sigenergy • • 18h ago

Help / Advice Sigenstor Sp1 or Neo

0 Upvotes

Looking for some advice on two solar/battery options. Both are the same installed price.

My installation:

  • 15 × 470 W (7.05 kWp).
  • 5 east, 5 west and 5 north-facing.
  • 30° roof pitch.
  • 5 kW single-phase inverter.
  • Optimisers for mixed orientations. Tying East to north

My electricity usage:

  • 3,326 kWh annually
  • Average 9.1 kWh/day.
  • Summer: 8.0 kWh/day.
  • Winter: 9.6 kWh/day.

Option 1 – Original SigenStor

  • 5 kW SP1 inverter.
  • 10 kWh battery (8.76 kWh usable).
  • 2 MPPTs.
  • No Gateway/changeover.

Option 2 – SigenStor Neo

  • 5 kW Neo inverter.
  • 8 kWh battery (7.52 kWh usable).
  • 4 MPPTs.
  • Integrated backup capability.

Currently no EV but likely planned for 2028
No heat pump until at least 2032

Is it better to take the 1.2kwh for the newer system and switchover?

Does it make sense to consider another 8kwh module in 2028/2029?

Modelling both systems, my bills are in the negative