Rebuilding my existing 12x16 ledger-attached deck in Eastern Massachusetts (48" frost line code). I’m upgrading the old direct-buried 4x4s to 6x6 posts on 12" Sonotube concrete piers. I’m doing the work myself since I can’t afford to pay a professional right now and the deck was in rough shape.
I rented a mini excavator to clear the top layer, concrete debris, and rocks, and I’m finishing the holes with a motorized auger. Because of buried utilities (sewer, electrical conduit, irrigation) very close nearby right where that red spray paint is there is sewer and electrical, I had to be careful with the machine, and the soil is full of rock and rough fill as well. I don’t believe I’ll be able to get down 48”, more realistic would be around 36**"**. I already returned the digger and going to be digging the rest with a auger. It didn’t seem like the original deck posts where down 48” as I was able to remove some of the cement piers with the machine and I’m not down a full 48” yet.
For guys building in New England / cold climates:
- if I hit 36" in well-draining rocky soil right next to a heated basement foundation, how high is my actual risk of frost heave?
- If I stop at 36", is my best bet to tamp 3–4" of 3/4" crushed stone at the bottom, flare/bell the base, and backfill the outside of the Sonotube with crushed stone?
- Would throwing something like 2" high-density XPS foam (Foamular 250) under the footing help at 36", or is that not needed?
I understand 48” is code and for a reason and I’m doing my best here on my own to get as close to that as possible. I’m just trying to set my expectations. to what I think that I’ll be able to get down to, and if that’ll be OK. The machine was helpful but to be honest the bucket was to big for the tight space I had but we rented it for another job I had to do here so it didn’t go to waste and at least got me through some of the rough layer , big rocks etc that are all over this property.