r/Decks • u/Ericpalacios • 11h ago
Did this deck in Woodstock GA
r/Decks • u/yello5drink • 14h ago
It started as a resin in June. Our great deck was built with the house in 2008 and the deck boards probably could have been replaced a few years ago.
Once we started dismantling it became clear we would get to do more. Ledger board was bolted on top of hardie siding, unclear if footings were correct, eventually realized if we're rebuilding stairs it will be easier to replace 15yo patio now before landing stairs in our than waiting until next year.
Turned into a complete dig out old footings, put in even more than before, trex deck, and cable railing. Passed final inspection at 11am today (Nov 24) and first snowflakes of the year started at 3:30. About $17k all in. That includes some rentals and a couple new tools.
Here are some pictures in reverse order.
Thanks to all who posted here. I learned a lot and hopefully avoided big screw ups, but now I can unjoin and spend my spare time reading about more entertaining topics.
r/Decks • u/1d0wn5up • 20h ago
Rebuilding my existing 12x16 ledger-attached deck in Eastern Massachusetts (48" frost line code). I’m upgrading the old direct-buried 4x4s to 6x6 posts on 12" Sonotube concrete piers. I’m doing the work myself since I can’t afford to pay a professional right now and the deck was in rough shape.
I rented a mini excavator to clear the top layer, concrete debris, and rocks, and I’m finishing the holes with a motorized auger. Because of buried utilities (sewer, electrical conduit, irrigation) very close nearby right where that red spray paint is there is sewer and electrical, I had to be careful with the machine, and the soil is full of rock and rough fill as well. I don’t believe I’ll be able to get down 48”, more realistic would be around 36**"**. I already returned the digger and going to be digging the rest with a auger. It didn’t seem like the original deck posts where down 48” as I was able to remove some of the cement piers with the machine and I’m not down a full 48” yet.
For guys building in New England / cold climates:
I understand 48” is code and for a reason and I’m doing my best here on my own to get as close to that as possible. I’m just trying to set my expectations. to what I think that I’ll be able to get down to, and if that’ll be OK. The machine was helpful but to be honest the bucket was to big for the tight space I had but we rented it for another job I had to do here so it didn’t go to waste and at least got me through some of the rough layer , big rocks etc that are all over this property.
r/Decks • u/Flipy-Fliperson • 18h ago
I was just looking at my deck and noticed these nails coming out at the top of my steps. Is it a big concern? Should I just pop them back in there and call it a day or replace them with something?
r/Decks • u/Youmadashell • 18h ago
Big project but really like the results. I don't think my pictures do it justice.
r/Decks • u/Master_Necessary_248 • 20h ago
So i hired a deck contractor with great reviews. I did not oversee but trusted them. I was going to post here earlier but as I saw other deck critiques I became quite concerned about mine. I installed all the simpson strong black hardware and a lot of the brackets. I had them come out and install another beam under the overhang and the only way they could do it was to jack hammer into the rocks and cement around the posts. Ground contact pressure treated on lower deck. Pressure treated on upper deck. The joist hangers were not seated on the bottom of most joists so I redid those with proper hardware. I had them come back again as they used zinc interior lags vs proper pressure treated lumber lags. They also used deck screws in joist hangers and post bases; had them correct that. I installed the hurricane brackets you see plus all the joist hangers on the over hang.