r/Grid_Ops • • Dec 25 '25

Open Positions 12/24/25

71 Upvotes

Hello all, Updated 04/02/26

I'm not a recruiter, just an operator who likes to see what else is out there. So here are some BES jobs currently open. Feel free to comment or PM openings. I will update when time allows. Newly added positions will have the company name bolded. Closed jobs will be removed and cataloged at the bottom.

Trainee/Apprenticeship level

  • Dakota Electric Association Distribution System Operator - Farmington, MN

    • Annual salary starts at $109,000
  • PSEG Long Island District Operator in Training - Hicksville, NY

    • $56.94 - $68.45 an hour.
  • Arizona Public Services ECC BA Operator Trainee - Phoenix, AZ

    • Unknown pay around $5X.xx an hour
  • Hawaiian Electric Distribution System Operator - Maui/Oahu

    • $66.49 an hour, 8 hour shifts, 2 positions available.
  • PPL Transmission System Operator or Distribution System Operator - Allentown, PA

    • Start at 90-100k w/ 8% bonus. 108k + 3% annual increase w/ 10% bonus after qualifying the desk. Requires NERC RC and PJM TOO certs, but training is provided. 6 week shift rotation.
  • Eversource Associate Operator, Distribution System - Manchester, NH

    • $91,400.00-$101,550.00 + % Bonus.
  • Eversource Distribution Dispatcher Apprentice - Dorchester, Southborough, or New Bedford, MA

    • Union steps $58.66 - $59.36 - $60.77 - $62.65 - $67.30.
  • Eversource Transmission System Operator Trainee, Bulk Power Systems - Dorchester, MA

    • Union steps $129,529.55 - $136,006.02 - $141,200.16 - $147,663.69 - $153,013.25
  • BHEM NERC Certified System Operator - Great Falls, MT/Palm Beach Gardens, FL

    • $90-150k + % Bonus.
  • Consumers Energy Associate System Operator - Jackson, MI

    • 92-95k starting salary non exempt. Straight OT pay. Monday thru friday 8 hr shifts rotating

Some experience

  • Snohomish PUD System Operator I or II - Everett, WA

    • $83.89 - $98.58 per hour
  • Tacoma Power Power System Operator - Tacoma, WA

    • 7 days on, 3 days off, 7 days on, 4 days off, 7 days on, 3 days off, etc. rotating between day, swing and grave each 7 day shift cycle. $70.59 - $81.72
  • Avista System Operator - Spokane, WA

    • $73. 44 to $91. 80
  • MISO - Carmel, IN

    • hiring RC’s ($126k-$136k) and Sr RC’s ($138k-$148k) in Carmel, IN.
  • Turlock Irrigation District Power Control Center Operator - Turlock, CA

    • $89.68 an hour
  • Silicon Valley Power Electric and Water System Operator - Santa Clara, CA

    • $183,558.84 - $234,773.52 Annually
  • Eversource Supervisor, System Operations, Level 1 - Manchester, NH

    • $112,360.00-$124,840.00
  • TECO Energy System Operator - Lutz/North Tampa, FL

    • Unknown pay believed to be around 120k. Was 7 on 7 off
  • UEC System Operator - Hermiston, OR

    • $147,631-$181,568
  • MDU Electric Systems Operator II/Sr - Bismarck, ND

    • $84,460 - $126,680 and $97,110 - $145,670
  • Keys Coop System Operator - Tavernier, FL

    • $130,000 ish? Possible relocation.

Lots of experience

Previous Jobs to be posted below once the posting period is expired for data retainment.

  • PJM Master Coordinator - Audubon, PA

    • Unknown pay
  • CAISO Operations Trainee - Folsom, CA

    • $45.91 per hour w/o nerc, $48.21 per hour w/ nerc.
  • EREPC Power System Operator - Madison, SD

    • $43.00 - $62.00 per hour
  • WAPA Power System Dispatcher Sierra Nevada- Folsom, CA

    • $165,476 to - $195,200 per year
  • MDU Electric Systems Operator II/Sr - Bismarck, ND

    • $84,460 - $126,680 and $97,110 - $145,670
  • LCEC System Operator - Fort Myers, FL

    • Unknown pay, probably around 120,000?
  • San Diego Gas and Electric - Distribution Systems Operator

    • Wage Schedule: 1st year: 70.92/hr 2nd year: 80.89/hr Thereafter: 85.47/hr. Closes Feb 4th
  • ChelanPUD Power Systems Operations Trainer - Wenatchee, WA

    • $154,560 – $193,200 (based on qualifications).  With tenure and strong performance in this role an employee may earn up to a maximum of $231,840. Excellent time off and benefits.
  • New York Power Authority Assistant System Operator - Lewiston, NY

    • $70,000 - $96,800
  • Lower Colorado River Authority Transmission System Operator Associate - Austin, TX

    • Unknown pay
  • Salt River Project Dispatcher Power AGC 1, 2, Senior - Scottsdale, AZ

    • Unknown pay, Very good benefits and a pension.
  • National Grid Regional Operator A - Liverpool, NY

    • starting wage of $54.86, 24 months to fully qual and pay bump to 128k
  • FirstEnergy Transmission System Operator I - Wadsworth, OH

    • $90,000-$100,000, 10% STIP and OT
  • Dominion Transmission System Operator - Associate, Mid, and Senior - Richmond, VA

    • 70-110k for associate, 86-137k for operator, and 97-154k for Sr operator. With an annual % bonus. 12 week shift schedule.
  • NYISO Associate Operator - Rensselaer, NY

    • $92,200 - $118,000 USD. 2-2 3-2 2-3 rotating shift pattern. Brand new control room
  • City of Redding Electric Utility Senior System Operator - Redding, CA

    • $161,803.20 - $196,684.80
  • Xcel Distribution System Operator - Minneapolis, MN

    • Marshall Operations Center in Minneapolis, MN. Starting pay $57.60.
  • Eagle Creek Renewable Energy Power Systems Operator - Maryville, TN

    • Unknow pay
  • OG&E System Operator - Oklahoma City, OK

    • $125,000 - $140,000

r/Grid_Ops • • 2h ago

System Operator Opening

4 Upvotes

For those that may be looking here is a posting for an operator position in Houston.

https://jobs.entergy.com/job/The-Woodlands-LBA-System-Operator-I-Sr-Texa/1452993300/


r/Grid_Ops • • 12h ago

Operators, what is your shoe choice?

13 Upvotes

Hi all!

Definitely not your normal “grid-ops” type question but I’m looking to see what you all wear for 12 hours a day standing/sitting? I tend to stand for 80% of my shift and my current Altra shoes feel like bricks. I’m looking for sometime that will help with the foot pain.

Note: shoe wear is pretty lax as long as it’s not crocs or flip flops.

Thanks guys!


r/Grid_Ops • • 20h ago

3GW line connecting MISO and WECC Gains Loan Support from DOE

17 Upvotes

The North Plains Connector is a short 525 KV DC line connecting Colstrip in Montana to Minnesota Power in North Dakota.

Colstrip is home to coal generation rated about 1.5-2GW with 2.2GW 500KV AC transmission to the West as WECC Path 8.

The project details are:

https://northplainsconnector.com

Northwest power planners have long wanted access to the central US wind belt beyond what is available in Montana and Wyoming East of the Rocky Mountains. No doubt the project has modeled energy price arbitrage between the balancing authorities.

The other East-West interconnects are much smaller.

https://www.powermag.com/doe-offers-2-8b-conditional-loan-for-1-8-gw-wyoming-link-between-eastern-and-western-grids/

It is a start on the National Laboratory of the Rockies SEAM study of large scale interconnection which China has. I believe the China grid links are as large as 12GW in a single facility.

https://research-hub.nlr.gov/en/publications/interconnections-seam-study/

Government lending saves a lot compared to commercial bonds. Personally I would like to see more of it for critical infrastructure, like energy.

The interchange desk steps up when this project is completed.


r/Grid_Ops • • 15h ago

National Grid HireVue assessment – what games and questions

Thumbnail reddit.com
1 Upvotes

r/Grid_Ops • • 1d ago

Quantum computing’s first real-world payoff may come in energy, not drug discovery

Thumbnail cnbc.com
10 Upvotes

Interesting potential advancements coming down the pipe.


r/Grid_Ops • • 1d ago

More guidance/ advice needed

1 Upvotes

Hi everyone first off I really appreciate all the advice you've given me on previous posts. I lost my job unexpectedly and I found the system operator role and it sounded perfect for me as I look to change careers. I have 2 questions

  1. I applied locally with AEP for 2 grid operator roles. Ive seen the req continue to open after I've applied while my applications stay at under consideration. I haven't heard anything. I think that's because they need more applicants to apply and pass the assessment for classes. Am I on the right track?
  2. I was a call center representative and supervisor previously. Multitasking and reading data were part of my daily grind. As a supervisor I had to find ways to meet various personality types and guide them with patience, not all that differently than I would our customers. Do a lot of these places hire folks like me who might have some of the skills from other industries? I can and will commit to learning and putting in the work, I'm just wondering if I have a chance?

As always I appreciate all the wisdom and advice. You are all awesome, insightful and helpful. Thanks again in advance


r/Grid_Ops • • 3d ago

Grid Ops Game Full Version

Thumbnail tyman-2001.itch.io
29 Upvotes

Hello everyone, this is my second and likely final post about my Grid Ops game as I don't want to spam this sub (although its hard to market this elsewhere). I have released the full downloadable version of the game which is a port to the unity engine to support the new 3D maps. The free browser demo version is still available as well, just without some of the new features.

New Full Version Features Include:

  • New grid: EU 50 Hz Advanced - A fourth grid modeled on a large German transmission control area, the biggest in the game at about 31 GW of peak load. (4 grids now available - NA 60 Hz Simple, NA 60 Hz Advanced, EU 50 Hz Simple, and EU 50 Hz Advanced.)
  • Unique 3D maps: Each of the four grids now has its own 3D map of the region it powers, with the cities and towns, power plants, substations, transmission lines, rivers, mountains and coast. Everything on the map is your grid: Every generator, substation, transmission line, tie and feeder from the control screens is modeled on the map. Click one to open its controls, or search for any bus, line, unit or zone and fly straight to it. I added these to implement some visual interactive flair to the game and allow you to see the customers you're powering.
  • Control room colors: A new darker color scheme for all screens. The classic one is still there and you can switch between them in the main menu or the settings.
  • Scenarios: 10 scripted scenarios on every grid, each three to six hours of a difficult shift that starts mid-shift and plays the same every time: Evening Peak, Total Eclipse, The Duck’s Neck, By Hand, One Tie Down, A Quiet Afternoon, Red Flag Warning, Heat Dome, Polar Vortex and Solar Storm.
  • Online leaderboards: Every grid has its own boards for Campaign, Scenarios, Free Play Hardcore and Free Play Relaxed. Enter a name to join; only that name and your best scores are sent.
  • Full change notes: https://tyman-2001.itch.io/grid-ops/devlog/1795243/update-3-full-version-release

The full version is $4.99 to try and recoup some of the costs of development, especially of the 3D maps, however the browser based demo version is still available for free with all previous features plus new ones like the new EU Advanced grid, the new color scheme, and custom pop-up animations to add some visual flair to the game. They can be disabled in settings if you want the pure control room experience. A reminder that while this game is easily played on one monitor, it is best experienced on multi-monitor setups.

I am excited to hear how you guys like the new features and would love feedback on game features, UI layouts, bugs, etc. Feel free to comment feedback below or on the dedicated Bug Report and Feature Request topics on the games website. Thank you for your time.

Update (11/22/26): Update 4 implements a UI size setting, save/load feature, and translations for 11 popular languages. Full list here: https://tyman-2001.itch.io/grid-ops/devlog/1799103/update-4


r/Grid_Ops • • 3d ago

Google-backed Tapestry completes deployment of HyperQ AI platform for PJM's Cycle 1 interconnection review

Thumbnail datacenterdynamics.com
4 Upvotes

This is just one step in interconnection studies.

"The HyperQ platform uses multimodal AI to analyze PDFs, maps, and legal documents, returning page-level citations to PJM engineers who make the final compliance determinations."


r/Grid_Ops • • 7d ago

Honest opinion

8 Upvotes

Im going to be graduating school with an ECE degree and already have a job as a TOP lined up after college. The pay is great dont get me wrong, but I am starting to wonder about my long term future. I feel like I really want to go far with this, but everyone who gets into this do aswell and there is not much headspace to actually do that. I want to eventually transition out to go into different areas when I feel like it, but its not so easy to do with operations experience and still receive similar pay. I have a engineering interview set up for ERCOT and was wanting to ask any fellow engineering degree Holders if this path is good long term in terms, or should I get into diversified engineering roles


r/Grid_Ops • • 7d ago

Question About 2 Different Roles

3 Upvotes

I applied for 2 positions,

Eng Del System Operator Associate

Transmission System Operator

Both job descriptions look similar, the pay is the same but only one is an associate role. As an outsider looking to make a change into the space, do I have a shot at both positions? Or just the associate position? They both set similar expectations for testing and progression. The System Operator position doesn't say you have to already have your NERC. It looks like they have similar expectations for training timelines as well. As always, thank you all for your wisdom and advice.


r/Grid_Ops • • 7d ago

College kid trying to stand out

4 Upvotes

Hey Everybody,

I'm a Junior majoring in Electrical Engineering Technology who has been trying to get an internship without success so far. I know I want to work somewhere in power. I am toying with the idea of getting a NERC-RC certification over the summer as a way of gaining general knowledge about the industry if I don't land an internship. So I have a few questions for the group: First, would the NERC exam actually give me good understanding of the way the grid works, or does it mostly just test theory and regulations? Second, would passing the NERC make me more employable for anything other than a Transmission Operator role? Would a manager hiring for physical substation design or P&C even care, or worse, think that I'd be gone as soon as I could get a control room job? Finally, if you don't think the NERC is a good idea, what else would you suggest I do over the summer instead?


r/Grid_Ops • • 8d ago

Advice Much Needed

4 Upvotes

I applied for a System Operator Associate position as well with AEP. I also applied for the non Associate position too. Both my applications say under consideration and have for almost a week. However, today is the last day to apply as the req closes tomorrow. Is it normal to not hear anything from them until after the req closes? I think the non Associate position will fail since this will be a career change for me. Just looking to see what the hiring process was. I think I passed the assessment since it says under consideration but I'm not sure. I have prior experience that translates and I did avionics in the military. I'm also no stranger to certification exams. I'm just anxious for a call. This would be a huge blessing for my family and the job sounds great. Any advice is appreciated


r/Grid_Ops • • 8d ago

RC exam program - test participants needed

7 Upvotes

Hi everyone,

I made a post a few months back about starting a lower-cost NERC RC exam program. I took the past few months to really refine the material I’ve built. I’m hoping to get a few test participants to look over Module 1 for me and review the recording to provide feedback before I record the other Modules moving forward. The sooner I get feedback from a few eyes, the sooner I’ll feel confident offering this program!

Please either DM me or comment below if you’re serious and have the time to review. Thank you!


r/Grid_Ops • • 9d ago

How does the grid handle weeks of no sun and no wind in a Seattle winter?

9 Upvotes

How do grid operators keep the lights on during long stretches of overcast, windless winter weather in the Pacific Northwest?

I ask because my little shed solar setup barely charges in November, which got me thinking about utility scale. Hydro and gas probably carry the load, but I'd like to know how much slack wind and solar actually leave in the system.


r/Grid_Ops • • 10d ago

Substation design business

Thumbnail reddit.com
1 Upvotes

r/Grid_Ops • • 12d ago

Duke energy in Florida

9 Upvotes

Any one here work for their control room and can provide info on their wage scale ?


r/Grid_Ops • • 12d ago

Free list of utility, testing firm and EPC relay / P&C / substation tech openings, updated nightly (~550 jobs, 44 states)

24 Upvotes

I built relaytechjobs.com because relay and P&C tech openings are scattered across dozens of utility and contractor careers pages, and a lot of them never show up on Indeed.

Every night it pulls relay, protection and control, and electrical test tech openings straight from the employers' own sites. That includes utilities (Duke, AEP, Xcel, PG&E, Dominion, Southern, Entergy, PacifiCorp, Portland General, Idaho Power, Evergy and more), testing firms (EPS, Qualus, Shermco, IPS and others), and EPCs (Black & Veatch, WSP). Right now that's about 550 openings across 44 states.

You can filter by state, by utility vs. contractor, by union jobs, and by travel, or sort by highest pay.

Every listing links straight to the employer's own application page. I don't recruit, and it's free, with no sign-up and no ads.

https://relaytechjobs.com/jobs/?type=utility&utm_source=reddit-gridops

Which utilities or contractors should I add next?


r/Grid_Ops • • 12d ago

Generation System job opening

Thumbnail indeed.com
13 Upvotes

Job at NIPSCO in generation. Salary range is 96.6k to 144.9k with 7.2k shift bonus and about 10% annual bonus. They will train for NERC cert and there isn’t forced OT. I‘m happy to answer questions.


r/Grid_Ops • • 12d ago

Hydrocracker Console Operator - What Would You Focus on Learning First?

Thumbnail reddit.com
0 Upvotes

r/Grid_Ops • • 13d ago

Southeast Michigan system operator opportunity

Thumbnail careers.dteenergy.com
7 Upvotes

DTE has an open job bid for their distribution system operator position. This is a great opportunity to get into system operations.


r/Grid_Ops • • 14d ago

Overtime as a pipeline controller

Thumbnail reddit.com
0 Upvotes

r/Grid_Ops • • 16d ago

Hello. I have been a system Operator for 3 years now in a 33/132kv Substation.

1 Upvotes

My question here is: What's the requirement of being an Operator in the US? I work in Africa.


r/Grid_Ops • • 17d ago

Company nickel and diming

15 Upvotes

This is probably more a question for the union operators but I'm curious for any input from anyone.

For context I am a Union DSO in the northeast, non NERC.

(Base pay $70/ hr if anyone curious, I know I usually am lol)

Our utility has done some questionable cost cutting lately, and I'm curious if these changes and the subsequent response from our union are par for the course.

The most impactful one was "forcing" rest after a double shift to prevent paying out double time.

We get double time for: working 16hrs and coming back after 8 or less hours off, chainable. It has been this way for at least a decade. New control room leadership put out a memo last year saying that you will now be forced to have 9 hours of rest in between shifts, but only if it would put you on double time. I.E. 16, 15, 16, 15 hour shifts. The way they accomplish this is by forcing the person you would be relieving to stay an hour late to cover. Of course we filed a grievance (Prior practice, Cherry picking the rest time based on compensation, etc) but a year later the response from the union is that they will likely be dropping the grievance and not going to arbitration because there is no wording in the contract specifically prohibiting them from doing this, and that the operators are a minority of the union, so they don't think it's worth spending on the lawyer.

The other one is forced overtime. Due to staffing/training issues, we are regularly forced to stay for +4 or +8 hours, or come in on days off. To the extent that I regularly work 20+ days without a day off, without putting in for any OT. You can imagine this is only exacerbated by the "forced rest time", since the paychecks for stringing doubles are about half of what they used to be. It's also not uncommon to not be told about this forced OT until 5 mins before you're expecting to leave. We also raised this issue with the union but again, nothing in the contract explicitly prevents forcing, and the reps said they are generally more concerned with maintaining the availability of OT than work like balance.

Is this anyone else's control room/ IBEW experience? Better? Worse?

Thanks.

Also they're hiring lol. DM me

Tops out at $70/HR, MCOL, decent benefits


r/Grid_Ops • • 17d ago

NERC RC exam

16 Upvotes

I’m getting ready to take the NERC RC exam in a week and a half and I’m curious how did everyone know they were adequately prepared to pass the test? I have two practice test that I’m scoring relatively well on, completed the HSI course and done their 25 question quizzes which were difficult but think I understand the material relatively well. Is there any additional tests or study material I can take or use to judge my progress?