3GW line connecting MISO and WECC Gains Loan Support from DOE
The North Plains Connector is a short 525 KV DC line connecting Colstrip in Montana to Minnesota Power in North Dakota.
Colstrip is home to coal generation rated about 1.5-2GW with 2.2GW 500KV AC transmission to the West as WECC Path 8.
The project details are:
https://northplainsconnector.com
Northwest power planners have long wanted access to the central US wind belt beyond what is available in Montana and Wyoming East of the Rocky Mountains. No doubt the project has modeled energy price arbitrage between the balancing authorities.
The other East-West interconnects are much smaller.
It is a start on the National Laboratory of the Rockies SEAM study of large scale interconnection which China has. I believe the China grid links are as large as 12GW in a single facility.
https://research-hub.nlr.gov/en/publications/interconnections-seam-study/
Government lending saves a lot compared to commercial bonds. Personally I would like to see more of it for critical infrastructure, like energy.
The interchange desk steps up when this project is completed.