r/Homebrewing • u/BrewCrewKevin He's Just THAT GUY • Jul 09 '15
Weekly Thread Advanced Brewers Round Table: Electric Brewing
Electric Brewing
- Do you have an electric brewery to show off?
- What sort of safety precautions are needed when brewing with electricity?
- What sort of temp control methods are there?
- How does the beer change when heated with an element rather than a flame or steam jacket
Looking for more topic ideas. Getting a bit slow again. I have a ton of ideas, but just looking for things that may be more prevalent in the coming months.
Also, I'm looking at having a past AMA do a bit of a followup next week, which I'm excited about. Yes, Reddit has acknowledged my importance to the /homebrewing AMA process and chose to keep me around. :P
11
Upvotes
6
u/jangevaa BJCP Jul 09 '15
Some safety precautions when building an electric brewery:
3
u/[deleted] Jul 09 '15
I know /u/brewtroller does.
Also, link to the RIMS/HERMS DIY!
Edit: If they ever fired /u/brewcrewkevin, I'd burn the subreddit down. No I wouldn't but I'd leave.
2
u/snoopwire Jul 09 '15
I built a 30A Brutus 20 that I sold, and then now have a dual 120v HERMS rig. Here's some crappy pics I have online, http://imgur.com/a/qUOoU http://i.imgur.com/3YdCJ.jpg
Not really sure what to say - but if you have any questions feel free to ask. One thing I'd like to say is that you can build it cheaply if you source Chinese stuff on eBay. My Brutus 20 panel cost around $800. My second panel (which has more goodies too) was about $300. I think I spent more on fuckin' Camlocks etc than I did the panel. I regret the camlocks though for the price. Should have done barbs and spent that money on another ferm fridge.
6
u/ercousin Eric Brews Jul 09 '15
Not sure if induction counts for this? If so here is my electric powered induction brewery!
2
u/carboy_coat Jul 09 '15 edited Jul 09 '15
I have a dual element 120V e-BIAB system that I just finished and will be brewing on for the first time in the next few weeks.
I switched over from a 3-vessel 30A keggle system when I moved away from the ideal brewing basement in the house I was renting, had to downsize to something more apartment friendly.
The old house had GFCI protection built into the circuit I was using, and the new place has GFCI on every circuit I'll be using, so I haven't ever had to worry about that part of my system.
Not sure what to really talk about here, so I guess if you have questions I'll answer them as best I can.
[edit]
Some pictures of the new system.
Front of kettle
Inside Kettle, don't worry, elements don't touch each other
Front of overbuilt control panel
2
u/beerbeerbeerMN Jul 09 '15
Make sure to triple check that the kettle you're about to plug in is also the kettle that is full of liquid. Not the empty one. That you just emptied.
And if you get that wrong and the element pops, don't lift the lid to see what happened. Take it outside first.
2
u/jangevaa BJCP Jul 09 '15
Shout out to /r/StrangeBrew... powerful opensource brewery controller software that runs on Raspberry Pi or Beaglebone. The popular hosehead controller runs this software as well as many custom built brewery controllers.
2
u/chirodiesel Jul 09 '15 edited Jul 10 '15
Do you have an electric brewery to show off?
Not to show off, but here it is.
What sort of safety precautions are needed when brewing with electricity?
As said here already, GFI protection. 120V stings but 240V flat out kills
What sort of temp control methods are there?
You can use pids and switches like in Kal's build, a BCS system that can control either gas or electric, FWIW, you can rig a sort of high voltage rheostat shown in another post here, or you can rig up or purchase a raspberrypi based computer and run Strangebrew's Elsinore Brewery Controller like what is found installed on a hosehead.
How does the beer change when heated with an element rather than a flame or steam jacket?
There has been no discernable difference with anyone who has tried a beer before conversion vs. after
edit- a word
2
u/BrewTroller Jul 10 '15
my brewery is here: http://imgur.com/tAaryKH
Its based off of BrewTroller (duh) which is an arduino based custom controller with 20 outputs, 8 digital and 5 analog inputs and other connections that allow it to control temp, monitor volume, control pumps, valves, elements, burners, etc, etc.
Safety Wise, its all about understating electricity. GFI, good grounding, and sound wiring practices can make it plenty safe, but respect for the amount of power your using is critical!
In terms of changing when heated with an element, I don't believe there is a noticeable difference
1
u/cok666n Jul 09 '15
I built a 3 vessels eHerms a couple years back, actually it was a long project and I just finished my HLT a couple months back. Here are 2 advises for beginners :
My system is heavily based on the eletricbrewery.com design, but with cheaper pots and electronics.
Here's an album : http://imgur.com/a/O3iUw
You'll notice I've not yet wired the pumps switches. That's because I'm lazy and right I just unplug the pump when needed.
Any questions? Fire away!
1
u/crownsdown Jul 09 '15
I have an electric brewing rig and prefer it for a number of reasons. It has fast ramp times, doesn't need exchanging of propane tanks, and heats the liquid directly. That last point is probably the most important one for me. You have to enjoy misery if you plan on brewing with propane in South Texas during the summer.
I'll throw up some pictures when I get off of work. I'll describe it until then though.
The system starts with a 30amp 220v gfci breaker that I installed into my breaker box in the garage. That powers a NEMA 14-30 outlet that I installed in the wall below the breaker box. Attached to that is a NEMA 14-30 to L14-30 jumper that I made myself. The jumper attaches to a 25' extension cord which then connects to a EBC-SV with dual pump control made by highgravitybrewing. I switched out the plug on the EBC-SV with a locking one so that I could plug it in directly to an extension cord.
The control panel powers two 100% stainless 5500watt heating elements supplied by Bobby over at brewhardware. Those are installed into the pots via a set of 1.5" tri clamp element kits from brewershardware.
One element is in the kettle, and the other is in the HLT. Being only a 30 amp system, I can only run one element at a time.
The pumps are connected to wemo switches which I control with my voice via an amazon echo. This is probably the best part of the system. In addition to controlling the pumps, the echo also sets my timers and plays the tunes.
Every connection in my brewery is tri clamp which allows for a complete teardown and cleaning. It also allows me to move parts around and reconfigure arrangements of parts. A buddy of mine welded 1.5" tri clamp ends onto the pump heads and heat exchanger.
The mash tun has a bottom drain and the false bottom was made by Jaybird at NorCal brewing solutions.
The HLT and mash tun pots are concord and the kettle is a bayou pot with a tri-ply bottom. I choose the bayou for the kettle just incase I needed to use that pot on a burner ever again.
My mill is motorized and controlled with an on/off foot switch. The mill is a 3-roller mill from monster mills.
I've been trying to figure out a way to get audible temp reads from the echo, but haven't yet come up with a solution. Chime in if you know of one.
Next brew session I'll post a video showing the wemo switches in action.
1
u/demos74dx Jul 09 '15 edited Jul 09 '15
I have one to show off:
HERMS
Bonus picture of my sink, because it's awesome.
Sink
I cheated and had a local company build most of the HERMS for me, as I'm not super comfortable with electronics. Big shout out to Bengal Brewing Supply here in Utah, they were really awesome and designed a really useful CIP system for me that has saved my back.
I did the wiring for the outlets, the ventilation, mounted the control box to the shelves.
For noobies:
HLT: Hot Liquor Tank
MLT: Mash/Lauter Tun
BK: Boil Kettle
General Operation:
It runs off of 220V, 30amp dryer plug, there's 120V heater elements in the HLT(far left) and the BK(far right), each of these also has a digital thermometer that goes to the controller PIDs in the control box, the main knob in the middle picks which element to use. The two knobs on the bottom turn on the pumps.
The system is capable of 12 gallon batches, but I've only done 10 gals...I need some bigger carboys or a proper fermenter at some point.
Recirculating Mash:
The HLT lid has a copper coil that runs down into the HLT, which makes cleaning the coil super easy. I have a fly sparge in the MLT that drops the heated wort from the coil into the grain bed, then a pump pulls it out of the bottom and pushes it back through the wort coil into hot water again and then back into the fly sparge. I run this process the entire 60 minute mash.
Sparging out and Boiling:
I just utilize the water in the HLT and pump that over my grain bed, while my other pump pulls the wort out into the BK. Boiling is pretty straight forward.
Wort Chilling:
It uses a plate chiller and I generally just make my own ice out of bowls and toss it in the HLT or MLT then recirculate through the plate chiller and control my wort flow via the guage and ball valve on the plate chiller into the fermenter.
Ventilation:
As of right now, it's a $12 sheet of Styrofoam and duck tape to make up the hood system, and a 140CFM turbine fan. The prototype works really well, I need to get the dripping under control because much more liquid comes off the turbine fan than I expected, so I've rigged up a funnel and some tubing to move off the water. I'd like to work a drip edge into the ducting and have something a little cleaner looking. I also plan on replacing the hood system with stainless at some point. I also need to bring some wiring down and hook the fan to a fan controller, as right now I have plugged in(on) and out(off).
I'm still only a few brews into the system and haven't had a chance to taste anything that has come out of it yet. I'm also working on figuring out dead space and efficiency. Also it really sucks to do 5 gallon batches in, because the dead space is really weird and will require even more work to figure out.
Edit: spacing and formatting
1
u/[deleted] Jul 09 '15
Whenever this topic comes up, the focus always seems to be on DIY. Since I just barely have enough spare time in my life for brewing 1-2x per month (and I don't have an EE or EE-like talent), I won't be building an electric rig any time soon.
What are the best "off the shelf" electric brewing options?
1
u/OrangeCurtain Jul 09 '15
I just assembled my low-tech e-keggle last week: http://imgur.com/a/9lw7s
It's a tri-clover, solder on housing from brewhardware. There is no pid or temp sensor. The power supply is varied using what is known as a thyristor voltage regulator, which I picked up on ebay for $25. Had I known that some pids have manual mode, I probably would have gone that way (and still might at some point).
240V power comes from under my stove (which is on a GFI), then I use a shore power cable to reach from there to my backyard or garage, depending on the weather.
I went electric for two reasons... I hate filling propane tanks and I wanted to be able to brew at night in the winter without the almost guaranteed rain here in Seattle.
1
u/somethin_brewin Jul 09 '15
I'm on an electric RIMS setup for my mash and I don't think I'd want to do it any other way. It's just so easy to dial in a temperature and let it run.
I also use a ~1400W heat stick for boosting my boil. I brew in a small apartment so I can't really manage propane burner and my stove can only just hold a boil on a full batch. Plus, it takes like 90 minutes to get there. So the extra juice from the immersion heater really does a great job at closing closing the gap on that.
Got plans to go house shopping sometime in the next year. I look forward to transitioning to a full electric setup once I have the space and wiring to support it.
1
u/shimshimmaShanghai Jul 10 '15
Ive actually been working on developing a kit, which uses a 21L electric kettle, and BIAB setup. I would love to hear peoples comments on electric brewing too.
One issue I am trying to solve, and this may or may not apply to you guys is.... Electric kettles cant be immersed in water to cool, so no ice baths, and I don't want to resort to a cooling coil, as this adds a piece of equipment to what is supposed to be a very minimal kit.
1
u/dingleberrymoustache Jul 10 '15 edited Jul 10 '15
I have a 1 BBL electric brewery. The panel is from the Electric Brewery, the kettles, fermenters and brite are all stout. I have a thermaline plate chiller/heat exchanger. Here is a pic of us knocking out our 2nd BBL of our back to back and transferring to the 2 BBL ferm. Goes in at 212, into the ferm at 65 in a single pass. Here is a shot of our first time kegging from the brite.
The 50A breaker is GFI, and make sure not to fire the elements before they are submerged. Other than that, there isn't really much to worry about other than opening the wrong valve or turning on the wrong pump.
It's a HERMS system so mash temp is controlled via re-circulation through the coil in the hot liquor tank. This is controlled via the panel.
I don't think it does. I just don't have to worry about running out of propane anymore, and my boil-off is more consistent.
I love being able to walk into the "brewery" and just get going. No need to setup anymore.
1
u/ScrewyBrewer Jul 23 '15 edited Jul 23 '15
I decided to hire an electrician to install a 4 wire 220 volt 30 amp GFIC breaker and run the line to a receptacle near the location of the EBC-SV brewery controller. The EBC-SV is the heart of the eBIAB system it runs the Chugger pump and regulates the output of the heating element based on feedback from the temperature probe connected at the kettle lid.
The EBC-SV was all setup and ready to go right out of the box all it needed was to be plugged into a 220 volt outlet in order to use it. I have to admit brewing on this system proved to be the most enjoyable brew day I've ever had. The EBC-SV provided automated temperature control and combined with the Chugger pump they eliminated a lot of manual work and the clean in place feature made cleanup a snap.
My High Gravity RIMS Setup