r/SolarDIY • • 21h ago

Cleaning up extremely dirty solars

Thumbnail
gallery
291 Upvotes

Hi I've got for free these solar panels, they have been used near an highway so they are completely dirty

I tried ammonia, wheel hub cleaner, toilet cleaner , paint solvent , only thing works you see it in the photo and it makes harmful fumes and my wrist is screwed after doing half a panel, I have 60 to clean up :D

After cleaning they work pretty decent for their age so it is worth it , I mean free is free Any idea / suggestion?


r/SolarDIY • • 7h ago

Custom Solar Ground Mount on Granite Boulder

Thumbnail
gallery
181 Upvotes

3x 430W REC panels, 1x NEP BDM 1200-LV 120V plug-in microinverter. I just finished this yesterday, I do not have any production numbers (believe me, I'm more disappointed than any of you 😅)

Title says it all. My parents house has this weird ledge of granite that's a super awkward shape on a steep hill. It's always been in the way. No grass. Could never plant anything on it. Only moss grows. Even just decorating it has always been a colossal PITA. So I finally decided you know what, I'm gonna build a ground mount on it. It gets sun ALLL day during the summer, and my parents have these big pumps for their pond. Why not get some solar 😎

Bought a cheap rotary hammer and went to town. I demo'd the granite until I hit solid rock, drilled holes and installed 1/2" threaded rods as anchors w/ Sika Anchorfix 2, two rods per footer, ~6" deep minimum. Some of the granite was REALLY badly weathered so I had to demo down over a foot just to get solid stone. I hit it eventually. I also hammered into and flattened the areas as best as I could and lined them all up.

Then, I installed very stiff rubber pads so the footers would have something to help keep them level, and wouldn't sit in any standing water. I also carved channels to drive any water away.

I started with my 3 front footers and and cut strut so the heights would be all exactly the same, true horizontal. Then, I measured and cut all the strut for the rear footers, to connect to the front ones at a 35 degree angle. I had calculated 36-39 degrees was optimal for the latitude (New England) and the azimuth (about 220 degrees), but 35 is what I could achieve consistently with the amount of strut I had. This was really tough for the angled footers, since the connection was free to move around. All the support pairs were 35±0.4 degrees. Considering how absurdly uneven the rock was to start, I'll take it.

Once I had all the front-rear pairings done, the hard work was over. Laid strut across for the full length of the panels, leveled with a laser, and then then panels followed soon after. Attached the inverter to the back, and wired it all up.

It came out SUPER clean, I'm very happy with it. My wife encouraged me to share it with you nerds.

Also, I powered the my little jobsite with my car 😁


r/SolarDIY • • 8h ago

How does this setup look?

Post image
9 Upvotes

Building out a 48V backup battery solution. Victron Multiplus II 3000VA paired with smart shunt, lynx bus bar, two 150/45 MPPT’s for solar input. Plan to build out subpanel for critical loads that cover network equipment, fridge, freezer, lights, outlets etc. no 240. Grid power added in for backup but plan for battery and solar (which I’ll add in a few months) as my primary source for those circuits. For now it’s just an outage backup solution h til the solar is added.


r/SolarDIY • • 9h ago

Ideas for extra panels

8 Upvotes

I just bought a pallet of 36 440w panels, I have all but 5 installed to charge my batteries, and to help offput power to my solar mini split.

So I still have 5 left as well as 10 of my old 410w panels.

What are some other devices that could be run off of them that could be handy just in case?

I've already got 30kw hours of batteries, along with 2 apex 300 and 2 batteries for those as well..

I'd love to hear what else could be useful and can be powered by larger panels!


r/SolarDIY • • 23h ago

[US] [E10] [CA] Answers to questions I was not able to get here or elsewhere..

5 Upvotes

After a few days wait to get the right information Anker Sales team responded with this info. I am in the process of ordering a single 30KwH stack this morning.

Sorry for the delay in getting back to you! Here are the concise answers to your questions regarding the Anker SOLIX E10 30kWh single-stack system with the Power Dock:

1. Can the power dock be used without transferring critical loads wiring to it and still have Auto Failover?
A: Yes. An electrician can wire the Power Dock between your utility meter and your existing main panel (Whole-Home Backup configuration). Your entire panel gets automatic failover (<20ms) without rewiring individual circuits, though app-based smart load shedding only works on circuits wired directly into the Power Dock.

2. Can it power my whole home (max 6kw) 24x7 like the SIB can and not export power to the grid in that PD configuration? There is No payback from my POC so I never want to export but I want grid tied as a backup.
A: Yes. You can run your home off the E10 (up to 7.68kW continuous) in Self-Consumption or Time-of-Use mode with the grid as backup. The system is certified for zero-export (UL 3141) and uses an open-transition transfer switch to prevent backfeeding the grid.

3. Will it import power from the grid as needed, Example: if I attempt to exceed the 7.6kw of the Inverter?
A: Yes. While on-grid, if your home draws more than the inverter’s 7.68kW continuous limit (or 10kW turbo peak), the Power Dock automatically supplements or bypasses power from the grid.

4. Can I charge the batteries directly from that Grid if I need that? Your document lists everything, but not charging directly which seemed odd to me.
A: Yes. The Power Dock supports direct grid charging at up to 9.6kW, which you can schedule via Time-of-Use (TOU) mode or trigger automatically ahead of severe weather using Storm Guard.

5. During Outage will it keep my existing Balcony Solar Micro Inverters running?
A: Only if hardwired (240V). Standard 120V plug-in balcony microinverters will shut down during an outage for safety. Hardwired 240V AC-coupled microinverters will stay running if landed on the Power Dock’s dedicated AC-PV terminals (Circuits 7 & 8).

5.1 If so, where do I find a wiring diagram to allow that to work?
A: Check the AC Solar / Retrofit section (Circuits 7 & 8) in the Anker SOLIX Power Dock (AX170) Installer Guide or the E10 Third-Party Solar Compatibility Guide.

6. Does it come with the paperwork to show the building inspectors its UL approved and California approved?
A: The box includes a quick start/safety guide, while the full PDF certificates (UL 9540/9540A, UL 1741 PCS, UL 3141, CPUC Rule 21, and CEC listings) and Non-Export Statement are available on the Anker SOLIX Support Download Center.

7. Can I add an extra wall bracket or does it interfere with stacking the lower batteries? I live in an Earthquake zone.
A: Yes. For a 5-battery (30kWh) stack, Anker actually recommends adding a second wall bracket on top of the 3rd battery in addition to the top bracket. It fits cleanly between modules without interfering with stacking and must be anchored into studs or masonry per local seismic codes.

Again, apologies for the wait. Let me know if you need anything else.

Warm regards,

xxxxx
TicketANKER-TNV680020xxxxx
The Anker SOLIX Sales Team


r/SolarDIY • • 19h ago

I tried comparing two spots for solar panels with the lux meter I use for my plants

3 Upvotes

My first choice for the panels was the stretch of railing by the balcony door. It was easy to reach. The other spot was farther along and had a clearer view across the courtyard. I wanted to see if it got enough extra sun to be worth the hassle. We were planning to use a Jackery SolarVault 3 Pro to save some of the daytime solar for the evening. I still had to mark the panel position on the sketch for the installer.

That afternoon I used my houseplant lux meter to take readings at both spots as the shadows moved. I took photos too. Back inside, I tried an online conversion from lux to watts per square metre, hoping the numbers would give me a way to compare the two.

Before putting the numbers in our notes, I checked how the conversion worked. Lux is weighted for human vision, and the conversion depends on the light spectrum. I couldn't tell if the same factor made sense for my readings in sun and shade, so I left the converted numbers out. When my partner and I looked at the quote, we marked the afternoon shadows on our sketch using the photos. We still wanted to see how much shade each spot got in the morning before picking one.


r/SolarDIY • • 6m ago

Shade Tolerant Panels in a series

1 Upvotes

I'm looking in to "shade tolerant panels" and will need to put them in to a series. I'm wondering if the "shade tolerance" would matter at that point, since in a series the panels will be throttled to the lowest producing panel, correct?

Suppose I have 4 shade tolerant panels in a series. Two are full sun, one is half shade, one is full shade. All four will be brought to the level of the full shade one, correct? In that case, buying a shade tolerant panel is pointless?

The specific panel i'm looking at is here, but i'm not stuck on it. https://www.eco-worthy.com/products/eco-worthy-195w-n-type-18bb-bifacial-solar-panel-with-25-high-conversion-efficiency-ideal-for-rv-boat-roof-farm-home-off-grid-applications?variant=47042825715961#customer_reviews


r/SolarDIY • • 5h ago

Battery disconnect and fuses/breakers?

1 Upvotes

Hey all! Looking for some advice for my parents.

They're setting up a pretty ambitious DIY program - 32 440W panels, two 10 kW inverters, and six 100 AH lithium ion batteries. The kit they purchased as an alleged "comprehensive" package was anything but - the included wiring and breakers are all IEC listed and this will be grid-tied, so it isn't up to snuff for NEC 2023.

The issue I'm struggling with is fuses and disconnect switches or breakers for the battery bank. The included IEC breaker is 300 A @ 500VDC. I'm struggling to find UL listed options that aren't going to run $2500-3500 for both inverters, plus they may add a third later. At this rate, these three switches would be 20% the cost of the whole project.

Does anyone have any recommendations for products or alternate, code-compliant ways of pulling this off?