r/TreeClimbing • u/AutoModerator • 6d ago
Weekly Safety/Close-Call/Incident Thread
Let's talk safety! Share how your week went - close-calls, incidents, learning experiences, what went well (and why), what went poorly (and why), or whatever else is on your mind. Pics/photos are allowed but be careful to not doxx yourself, client, employer etc.
This thread will recur each week and is meant to be a place to learn and discuss mistakes, please keep comments constructive.
9
Upvotes
11
u/ArborealLife 6d ago edited 3d ago
Alright folks, I have a good one here for you. And I apologise if this isn't perfectly readable because I'm using voice to text. And it's a long story. Now lightly edited to actually make sense and correct mistakes!
I'm a contract climber and we're working on this contract to remove a large number of mature poplars that are wedged between a primary line and a line of houses. So we bring in a CUA which clears the lines and gives us about 15 to 20 feet of clearance, which isn't a lot considering our MAD is only 10'. Photo of jobsite here
So we get into the job for a day and we're not quite hitting the pace that we're looking for. So the boss man brings in a second contract climber. And I'm actually pretty stoked about this because I rarely get to see other people climb and I'm always excited to shoot the shit, talk shop and see how other people's processes are different than mine.
With this guy, we had what I would call six major incidences that reflect extremely poor judgement. And obviously I'm not going to name the climber or the company I'm subbing for or anything like that. But I do want to just get this out there and I'm very curious to see how you guys would react, where you would have drawn the line. Looking back, I let this slide much too long and I needed to stick to my guts and say something.
The first incident was when he blew a top on a poplar, and it rolled off of it and made contact with the primary lines. I considered this to be bad luck, maybe he wasn't quite calibrated, but mistakes happen and nobody got hurt. Video here.
The second one came immediately when he tried to drop that same tree, which had a side and back lean, and he tried to wedge it over. I was watching from the far end of the line of poplars and I could see him just hammering at his wedges, and the tree was obviously not going anywhere. I told the boss man, who went over and told him to throw a line into it. He threw a line in and pulled it over, and it was fine. I was thinking maybe this was just a bad morning and a bad start because he was nervous or not used to working with such a large crew.
Incident number three happened when he tried to drop a large poplar that had a major back lean. As he was doing his back cut, it sat back and pinched his saw. I watched him try to free his saw with tiny little climbing wedges, and I watched him snap a wedge trying to get it in there. He was hammering these wedges in, the tree wasn't moving, and his saw wasn't freeing up. He had a guy go pull on the line but the tree's not budging at all. The back lean is backwards over the houses, so we ended up having to hook a truck into it and pull the thing over.
So this is about lunch, and at this point I feel like I'm taking crazy pills. I'm thinking there's no way this guy has 12 years of experience and no way the boss is just letting this happen. This is crazy. We have lunch and I calm down and go back to climbing.
Then, incident number four happens. I had climbed a tree and stripped off the branches on both sides, leaving the stem with one top in the middle. It would fit nicely between the houses and the lines. He goes to drop it and once again rolls it off the primary, and it lands 20 feet away from the fence on the other side, so he had lots of room.
So it's decided he's going to climb again, so he goes up the next tree, and this is where incident number five happens. He asked me to get on the rigging line and I see his rigging set up and he has this little top he wants me to rig, swinging towards the power lines. And guys, this is rigging 101, when you rig or tie in around power lines, the rule is high and away, so you never swing towards the lines. And I'm just arguing with him when he's in the tree, like I'm not running this line for you, man, this is nuts.
And then incident number six. He's in the same tree and he's working on one of those long poplar limbs that's extending over one of the yards, and he decides he's going to square rig it down. He sets up a little pulley and tells the groundie to grab the rope. The groundie is asking what the plan is, but the guy in the tree just just doesn't reply clearly. At this point, I'm not touching this guy's ropes. Eventually, the groundie gets an answer, and he says he's going to take the top here. The groundie understands and jumps on the rope, and I tell him he needs friction. We run natural friction all the time, and we don't always run a portawrap unless we need to, especially when we're doing tree after tree. But this is the first top that we've rigged on this job. I yelled at the climber to wait, and me and the groundie started to set up friction by wrapping around the stem of the tree. While we're in the process of this, he fires up his saw and sends the top, and this groundie on the rope goes flying into a tree, flying like six feet.
And this is the point where I'm not proud, but I just lost my shit. I just lost it and I yelled. I was so worked up that I went home for the day. I called the boss later and I'm like, dude, we have a problem. And I walked him through all this and he said he's paid up for the end of the week, a fixed contract. And I was like, okay, well, you have him back and he can rake and chip up or something, but I don't trust this guy with a saw, I don't trust him felling, I don't want him climbing
When I came into work today he was gone. I'm not sure if he was paid for the week or not. All day I knew something was building. I felt it and I recognised the pattern, but for some reason I just didn't put my foot down. I didn't stand up for my guys. And the groundie's okay, he got knocked around a little bit, some bruises, but obviously he's fine.
Even though I wasn't in a position of being in charge or responsible or supervisor or in any capacity, I saw it all. I knew it was happening and I didn't step up soon enough.
So there's my story, and I'm curious to see how you guys would have reacted as just a fellow contract climber, not as the project leader or supervisor or the owner of the company or even as a client.
7
u/Strange_Ad_5871 6d ago
Biggest screw up is people not having comms. Would solve most of the problems I see.
6
u/Mountain-Ad-9070 6d ago
We had a job in a very tight space. Like no way to turn the truck around, return with a much smaller truck and chipper to clean up. Our lead dropped a 15’ fir top without warning us or looking where we were. We also could’ve been looking up. Any ways, peice fell tip down and flipped, butt end landed about 6’ from me. Scary, and made us slow down and reset
4
u/StretchDisastrous433 6d ago
Happened yesterday, I was negative rigging chunks down after stripping a medium sized redwood tree. About 30’ off the ground and feeling tired and a bit rushed, went to adjust my flip line upward and slipped it right off the top of the stick. Had a good scare and felt like a total dork. Always have a second tie in!
2
u/highgroundworshiper 6d ago
I almost got a dingo caught in a chipper this week. We have a big chipper, 24 inch bandit 21xp. It can fucking eat. Was running the dingo on a pine removal and pines have weird branches sometimes and one of them got caught in the claws as I fed it. Had to jump off and reverse the feed. Learned a bit from that lol.