Hey all.
I want to reroute my DW plumbing to kitchen sink plumbing after the DW failed and actually caused a flood into basement which insurance is going to take care of. I want to cap the old lines before rerouting gets done. They will drill holes through my corner cabinets to get to sink cabinet.
The HW line for my DW came from the utility room in the basement. It ran up from HWT, across ceiling and below the subfloor and then straight up to the DW. Discharge drain line is also below the DW. There was no p-trap there. The utility room is unfinished and when you get on a stool you can see between the subfloor and ceiling. You can see the supply line comes down from the DW space above then slopes down to turn 90 degrees up T to the HW line. And the drain pipe runs to the wall and then goes down behind the shower in my basement bathroom.
As these are above my basement shower, they are inaccessible from below. But, from above I am wondering if in order to properly cap them, does the subfloor in the DW cabinet space need to be cut into so the plumber can cap it below the kitchen floor level. Right now it actually is capped from the failure that occurred a few months ago (plumber did it). Not only did the intake for the DW fail but the shutoff valve failed and allowed water to continue. But it and the drain line are sticking 3” out. The same plumbing company that did the new shutoff sent a different guy for a quote and he said he needs a flooring guy to remove all that tile and then cut of the subfloor out. Then the plumber can cap just below. Then flooring guy come back and re-finish the floor with new tile and bring it level to kitchen floor. Right now the DW space is like 1 cm below kitchen floor. Plumber said he doesn’t want the lines capped above the floor because we’ll have a hard time finding a DW that will accommodate those things sticking out.
Now, why can’t a plumber cap say like 1” above the floor? Does that seem feasible? And for the plumbers out there that have experience installing many DWs, does it seem like models these days wouldn’t clear those lines if they were sticking out 1”?
Also, ideally, I would like the HW line to be capped right at the point where it T’s with the other HW line between the ceiling and subfloor, which is above my basement shower. Right beside and above the shower door is a bulkhead where that dark red steel beam runs (might notice in one of the photos). The contractors that are eventually fixing the damage in my basement and the bathroom there have to do some door trim work and the trim does connect at a couple points to the trim that has now been pulled off. I am wondering if they have to cut open the bulkhead for some reason to do that. If so, then I’m wondering if they can just cut the length of the bulkhead with a wide opening and see if someone can stick their head and arms in and reach the two above mentioned HW lines connect. That line is 20” away from the centre of the bulkhead. But I don’t know if the steel beam is in the way. Capping at the T gives that peace of mind instead of capping at the existing spot under the DW cabinet as HW will always run up that capped line.
TLDR:
Anyway, long story short, do you think it’s feasible to have that HW line and discharge line capped about 1” above the floor instead of the 3” they currently are? Can most modern DWs fit over that?
Thanks for the help and sorry for all the text and photos. Didn't know how much detail I'd need to give.