Hello Deckers,
Going forward, spam posts and posts unrelated to decks will be removed and submitters banned. This includes hot tub related joke posts. Users posting spam, shitposting, posting old content, or posting redundant hot tub jokes will be banned. Users commenting and encouraging this behaviour will receive temporary bans.
If your post or comment is legitimately inquiring if a hot tub can be supported by the structure of your deck, that is allowed, as this forum is here for deck builders and deck enthusiasts.
Let’s bring this community back to its original purpose: providing a forum for DIYers and professional deck builders to connect, share relevant information, and appreciate some beautiful workmanship.
r/Decks • u/SaltyThalassophile • 8h ago
questions for the community Are we crazy to think this deck looks highly questionable?
This isn't our home but one we walk past frequently and always comment on how we would never feel comfortable standing on this deck. It just looks so unsupported! However, none of us are deck-sperts and wonder if our judgements are justified, or if we are just cowards.
r/Decks • u/aryan_jandyal • 3h ago
Building a deck If you built a new deck beside a new patio, who made sure the two plans actually worked together?
Question for anyone who did a deck and patio as part of the same backyard remodel: how involved was your remodelling firm in making sure the two actually worked together before construction started..?
We’re working with a remodelling firm on ours here in OC, so they’ll obviously be coordinating the plans and the crews. I’m mostly trying to understand where these projects tend to get awkward once everything leaves the drawing stage..?
The thing I keep picturing is something small like the deck stairs ending up in a spot that technically works, but then feels completely wrong once the patio is actually there.
If you’ve done both together, was there anything about the way the two spaces met that you were especially glad got caught early..?
r/Decks • u/NamesMattDealWithIt • 10h ago
Saw this while taking a walk. Get the hot tub ready lads
r/Decks • u/RepresentativeLeek29 • 7h ago
Deck Built via Youtube
Question about deck ledger attachment and lateral stability
I recently built a 12×20 deck supported by three rows of beams and posts. My primary concern is the strength of the ledger attachment to the house.
The ledger is attached to the existing wood framing using 5-inch LedgerLOK screws, with one screw in each of the 13 joist bays. I've also installed two lateral tension ties.
There are four additional joists in front of the concrete stoop that are not attached to the ledger. Two of those joists are actually secured to the concrete with tension ties, but for the sake of this discussion, let's pretend those aren't there.
The upper portion of the ledger aligns with the wood framing, while the lower portion overlaps the brick veneer. There are also carriage bolts anchored into the brick using Simpson SET-3G epoxy. These were installed before my structural engineer finally believed me that the house had a pier-and-curtain foundation system (a story for another time).
I'm not counting the brick anchors as structural support.
Simpson Strong-Tie fasteners and brackets used everywhere. 6x6 posts, 3-ply 2x8's beams, 2x6 joists.
No crazy heavy furniture, or hot tubs on the deck. We dont really have parties except for our daughter's birthday where maybe 10 people would be on it.
My questions are:
- How can I determine whether the ledger attachment is structurally sufficient?
- Is there a reliable way to test the strength of the existing attachment?
- Are 13 LedgerLOK screws and two lateral tension ties sufficient to prevent the deck from pulling away from the house?
- Are the four joists not attached to the ledger a concern?
- Would installing more lateral tension ties significantly improve the connection? If so, how many and where?
- Are there other ways to reinforce the existing connection without removing the ledger?
Thanks to everyone!
r/Decks • u/worldstarhiphop12 • 18h ago
maintenance Penofin Oil question
I refinished this Mahogany Deck back in May of this year. sanded to 100 grit, 2 thick coats of penofin oil. The deck had an awning up from end of May to end of October. This is now what it looks like as of today, November 26. The side covered by the awning looks like what it did in May, but the side that was exposed to the sun looks like crap already. I’m going to reach out to Penofin as well but does anyone have any experience with something similar happening?
r/Decks • u/milkforbabyghost • 1d ago
Finished Decks DIY Deck build. How’d I do?
Passed final inspection yesterday. Western NY
Lower deck is free standing. 2x’s on rear beam tripled up because the section under the stairs cantilevers over a water tile system and a cleanout. Outside of the DCA6, I kind of relied on common sense for a lot of the engineering or over engineered to be safe. However chose against knee braces because I don’t like how they look, but I did slap it and say “she ain’t goin’ nowhere” when I finished so it should be fine.
This sub has also been a big help. Even just for laughs. I love it so much.
My wife says I should go pro but she hasn’t even looked at the underside of this thing yet.
r/Decks • u/OverExtension5486 • 1d ago
Deck Slope vs. Railing
Hey folks, carpenter here with a query that I haven't encountered before.
So I'm finishing off a second storey deck where a slope of 1/8" x ft. was required for drainage. The client is installing a Regal Ideas prefabricated railing. My question is would you allow the railing to follow the slope or would you raise the outside posts to make it level. I've got a 7/8" difference from one end to the other which is a pretty significant difference. It eliminates the ability to use the Regal post base covers so I have to make something custom in that case. Picture for reference.
If you were to install it level how would you raise the posts? I thought to just put an offcut of decking under them and hide with post covers.
Thanks y'all.
Edit: to say the consensus is uniform and I appreciate the feedback AND am very pleased to not have to deal with the headache of shimming these.
r/Decks • u/1d0wn5up • 1d ago
Doing 6 x 6 posts on 10” sono tubes bad idea?
I’m replacing my direct-buried 4 x 4 post with 6 x 6 post that are going to be put up on cement piers. Problem being is the 12 inch sauna tubes look gigantic for this deck and are going to impede where my replacement deck stairs are as well as being able to walk underneath into the basement. Our 10 inch sonotubes acceptable for 6 x 6 post. This is not being permitted. I’m just trying to get my existing decks rotted posts up off and out of the dirt and safely onto cement piers, and I feel like the 12 inch sauna tubes will look very big as well as impede my current set up.
r/Decks • u/yello5drink • 2d ago
Finally done
It started as a resin in June. Our great deck was built with the house in 2008 and the deck boards probably could have been replaced a few years ago.
Once we started dismantling it became clear we would get to do more. Ledger board was bolted on top of hardie siding, unclear if footings were correct, eventually realized if we're rebuilding stairs it will be easier to replace 15yo patio now before landing stairs in our than waiting until next year.
Turned into a complete dig out old footings, put in even more than before, trex deck, and cable railing. Passed final inspection at 11am today (Nov 24) and first snowflakes of the year started at 3:30. About $17k all in. That includes some rentals and a couple new tools.
Here are some pictures in reverse order.
Thanks to all who posted here. I learned a lot and hopefully avoided big screw ups, but now I can unjoin and spend my spare time reading about more entertaining topics.
questions for the community Let a contractor finish staining in Chicago weather or wait until spring?
I had a new porch and deck built on my Chicago 2flat this summer (I should post it, the deck is pretty sweet), and unfortunately chose the wrong contractor to stain it along with paint the brick wall, porch ceiling and replace an exterior door. They started staining the deck on Oct 9th and still haven't finished.
He wants to finish staining the deck this Sunday or Monday, but it will rain Sunday and daytime temps will be in the low 40s and nighttime temps at or close to freezing.
The stain is SuperDeck water based, the can says not to apply if temps will drop below 50 or it will rain in the next 24hrs. I called Sherwin Williams and they said not to do it bc it won't cure, but the contractor says it's fine and is pushing to do it.
The remaining work is to stain two sections he totally missed that are not walking surfaces, and to touch up areas that are both non-walking and walking surfaces where they oversprayed or dripped white paint from the brick wall they were staining.
I included pictures, but the touch up areas where he got paint from the wall on the deck are all over so I only included examples of those... basically, he needs to restain the stairwells and a lot of areas on the landings and the handrails near the wall.
Generally, this guy has been a nightmare to work with. At first he told me temps are fine bc it's oil based stain (it's not, it's water based), and is saying water based is fine now at current temps. The ceiling he painted a few weeks ago is already peeling, and he told me it's impossible to stain behind the downspout (it wasn't, I did it myself with a paint/stain pad I had in my basement and his extending pole). He also got paint on my neighbors deck, stained my deck on a day it rained that night, got the wrong color stain twice, and is skipping out on replacing an exterior door that's part of the contract (his guy built the wrong size door and he says he'll "try his best" to do it himself with a store bought door), and he's given me the run around with sprayer issues/no shows/sending one person instead of 4 or 5/etc that's lead to this taking so long. So, I just do not trust him and need another opinion... I'll do it myself next spring if that's the better option.
r/Decks • u/Mountain_Total5423 • 2d ago
How much should the builder get?
Designed & Built this deck, originally owner picked out capped timber tech, (the only options/samples I showed him were solid decking) he inserts himself into ordering process and buys scalloped timber tech. I usually refuse,to install scalloped, this is family.(nightmare) ..in the end, I do all these custom details install the scalloped (explaining it's twice the labor) i go above and beyond only to be shorted on my payment?! this was full rebuild, new stairs,w/ new landing poured with new footings, all new framing, hardware, etc. custom cedar railing with cap, etc. what's fair for labor. took over a month, from demo to finish. in PNW. materials were $12k only because contractor discoun, it's 750sf .....14 stairs. over 8' off FF.
r/Decks • u/1d0wn5up • 2d ago
Massachusetts 12x16 deck rebuild — realistic frost heave risk if piers max out around 36" instead of 48"?
Rebuilding my existing 12x16 ledger-attached deck in Eastern Massachusetts (48" frost line code). I’m upgrading the old direct-buried 4x4s to 6x6 posts on 12" Sonotube concrete piers. I’m doing the work myself since I can’t afford to pay a professional right now and the deck was in rough shape.
I rented a mini excavator to clear the top layer, concrete debris, and rocks, and I’m finishing the holes with a motorized auger. Because of buried utilities (sewer, electrical conduit, irrigation) very close nearby right where that red spray paint is there is sewer and electrical, I had to be careful with the machine, and the soil is full of rock and rough fill as well. I don’t believe I’ll be able to get down 48”, more realistic would be around 36**"**. I already returned the digger and going to be digging the rest with a auger. It didn’t seem like the original deck posts where down 48” as I was able to remove some of the cement piers with the machine and I’m not down a full 48” yet.
For guys building in New England / cold climates:
- if I hit 36" in well-draining rocky soil right next to a heated basement foundation, how high is my actual risk of frost heave?
- If I stop at 36", is my best bet to tamp 3–4" of 3/4" crushed stone at the bottom, flare/bell the base, and backfill the outside of the Sonotube with crushed stone?
- Would throwing something like 2" high-density XPS foam (Foamular 250) under the footing help at 36", or is that not needed?
I understand 48” is code and for a reason and I’m doing my best here on my own to get as close to that as possible. I’m just trying to set my expectations. to what I think that I’ll be able to get down to, and if that’ll be OK. The machine was helpful but to be honest the bucket was to big for the tight space I had but we rented it for another job I had to do here so it didn’t go to waste and at least got me through some of the rough layer , big rocks etc that are all over this property.
r/Decks • u/Flipy-Fliperson • 2d ago
Loose nails at top of steps
I was just looking at my deck and noticed these nails coming out at the top of my steps. Is it a big concern? Should I just pop them back in there and call it a day or replace them with something?
r/Decks • u/derpderpaderpder • 1d ago
questions for the community Help? Gaps / Spacing between Brazilian deck wood
Hi all. Midway through deck construction; I was told at outset that it would be a premium deck made with Cumaru (aka “Brazilian teak”) and the boards would be very close together — 1/16th inch spacing between them. To make it look really well done. What has been done so far seems a lot more than that. At least double maybe triple the space. What do I do?? Tell the builder he has to redo?
My wife doesn’t seem to think it is a big deal. I understand the needs for spacing but I was hoping to not be able to see underneath the deck. My kids are gonna drop stuff that falls down in there.
r/Decks • u/Master_Necessary_248 • 2d ago
Finished Decks New deck for critique
So i hired a deck contractor with great reviews. I did not oversee but trusted them. I was going to post here earlier but as I saw other deck critiques I became quite concerned about mine. I installed all the simpson strong black hardware and a lot of the brackets. I had them come out and install another beam under the overhang and the only way they could do it was to jack hammer into the rocks and cement around the posts. Ground contact pressure treated on lower deck. Pressure treated on upper deck. The joist hangers were not seated on the bottom of most joists so I redid those with proper hardware. I had them come back again as they used zinc interior lags vs proper pressure treated lumber lags. They also used deck screws in joist hangers and post bases; had them correct that. I installed the hurricane brackets you see plus all the joist hangers on the over hang.
Evaluating potential purchase
Northern NJ, offering on a house with a beautiful deck elevated. Have sometimes lurked here and wanted thoughts.
Probably a 200 year old tree growing through it! Decking itself is newer tyvek or off-band. My question is more the supports. Some wood into elevated footings, both of which look fine. Some metal, one of which seems to have some corrosion near the bottom, and is not clearly raised at footer? Obvs northern NJ gets all 4 seasons.
Any feedback much appreciated. If I’m walking into a disaster feel free to say so. If it looks fine, that’s cool too. Anything I should really hammer the inspector on, that would be nice to hear too. TIA.
r/Decks • • 2d ago
New deck and other additions
Big project but really like the results. I don't think my pictures do it justice.