r/estimators • • Oct 22 '21 Bravo

Looking to hire an estimator? Are you an estimator looking to make a move? Post here!

120 Upvotes

r/estimators • • 6h ago

Asked claude for buildxact alternative, 2 months later im not going back

15 Upvotes

been doing remodeling for about 4 years, mostly tiling, cabinets and drywall. figured id share since i see the "which software" question here a lot

was on buildxact before this. core estimating was fine, it did the job . two things wore on me tho. the blu ai assistant is an add on top of the monthly plan, and i was still doing my measurements by hand anyway. the bigger one was pricing. it was tied to a single dealer price list that never matched what i actually pay at my supplier. so i was overwriting half the material lines on every tile and cabinet job

ended up asking claude for buildxact alternatives that were better for small remodel jobs and handoff ai came up. tried it and went on the pro plan. you describe the job or drop in the scope and photos, and it builds a priced draft for you. i still go through every line like with any estimate, but for a bathroom tile job or a cabinet install its saving me a lot of time vs building from scratch

the other thing ive used way more than i expected is putting multiple options in one proposal, good/better/best basically. clients decide faster and i get a lot less "can you redo it without the tile upgrade" back and forth

been on it 2 months now and its worked pretty seamlessly for the kind of work i do. anyone here on their scale plan tired the ai takeoffs on remodel plan? thinking about upgrading


r/estimators • • 3h ago

I am seeking for career advice

3 Upvotes

Hi, I was hoping to get some more career advice. I'm currently enrolled in a Construction Engineering Technology program in Canada, and I'm wondering what career paths I could pursue that offer high earning potential, good work-life balance, and long-term career growth. I'm also interested in knowing which positions are expected to be in high demand in the foreseeable future.


r/estimators • • 9h ago

Any advice for someone who just started estimating in commercial flat roofing?

6 Upvotes

I’ve been in the commercial roofing industry for around a year and they offered me a job for Estimating. I’ve gained a basic understanding of the materials (TPO,EPDM) in that time but still have a lot to learn. We use BlueBeam. If anyone has any advice/tips for commercial roofing specifically or just estimating in general I’d appreciate it! Can already tell it’s going to be a knowledge journey.


r/estimators • • 4h ago

advice on becoming an estimator

2 Upvotes

I’m 23 years old and have been thinking about what I want to do with my life. I recently talked to a construction PM in DC as he was one of my Dad friends, and he was telling me to join the field, so I did a little bit of research and found out about being an estimator ,and it really sounds like something I would enjoy doing. I don't have a degree but im willing to go get one , and im willing to work hard & work for shit pay to get my feet wet. I was just wondering if you were in my shoes what would do and any advice to get into the field + any advice in general. Im not trying to just breeze my way into the field I understand it requires work and I’m willing to work for it. Also was wondering on how you see the field growing I don't want to waste my time and get a degree if its not worth it at this time.


r/estimators • • 6h ago

An advice who just started self employment as an Estimator.

2 Upvotes

Hi, I am starting my self employment journey as an Estimator. I have been estimating for GC and circumstances changed. Now I want to switch to self employment and need your advice about getting business, what should I do to land some opportunities in this time?


r/estimators • • 1d ago

Subs diverting from specs

3 Upvotes

Hello estimators,

I am plumbing contractor and was curious how often do subs divert from drawings/specs. I’ve recently gotten into bidding multi family projects and found myself in this position.

In a senior living facility the drawings show a recirc pump for every unit including a 1 BR/1 BA unit. I deem it unnecessary since these units are so small. I was thinking to exclude it from my bid and clarify that I will not be providing or installing them. Is this acceptable or could the GC ignore my proposal or make me provide them later on?


r/estimators • • 1d ago

Fork in the road - debating where to take my estimating career

3 Upvotes

For some background, I started estimating in 2023 with a large commercial roofing and siding subcontractor. Prior to that, field experience here and there bouncing around different companies, and got my BS in CSM in 2024. After 3 years with my previous company and ~ $25 Million in awarded work, I switched to a smaller GC as an estimator to mostly to relocate to Houston, TX and also get some different experience and branch into working for a GC.

For the past 8 months, I’ve been awarded 2 projects totaling $3.2 Million and have learned a ton, but am thinking about finding another company. I have a lot of autonomy at my job but there’s high turnover, not a lot of processes or a handbook and I’m not sure about getting raises and advancing my career. Salary wise, I make $70K which is doable here in Texas but at some point I really want to scale my pay. I’m not necessarily looking to jump ship tomorrow, but if the right oppurtunity comes or if I wait long enough to be marketable to a National GC or more established GC I definitely would make the move.

Recently, I saw a posting in my area for an architectural MWP estimator, which is one of the scopes I did at my previous company and did very well. I applied and am waiting to hear back to schedule an interview, but the salary range is $85K-$150K and realistically I’d land somewhere in the middle given my proven experience. It’s a little premature, but I’m highly inclined to pursue this considering it would be a 50%+ increase to my salary.

The thing I’m on the fence about, if I went back to a subcontractor I’m not sure if I’d make myself more niche or would make it difficult to get on with a large GC in the future. 8 months ago when I was looking, I found it difficult to get considered by GCs coming from a sub. When I took my current position with a small GC, the career path I had in mind was in a year or 2 to get on with a Turner, DR Horton, Kiewitt, JE Dunn and have good benefits and a lot better compensation.

Even if I made a jump in salary going to a sub, would I stunt my career path growth? Any advice?


r/estimators • • 2d ago

I quit giving line item pricing years ago. Talk me out of it.

56 Upvotes

Should've worded the title better. I don't hide the breakdown. The detailed scope of work is the breakdown. Every item, quantity, inclusion and exclusion is written out so the client knows exactly what they're paying for. What I quit was hanging a dollar figure on every line, because then the job turns into haggling over each number instead of the scope.

One price against a tight scope has held up better for me than 30 priced lines against a loose one.

I also billed 10 percent ahead, because I never trusted anybody to pay a final.

When a GC sends a 30 line scope and wants 30 prices back, do you break it out or price it against the scope?


r/estimators • • 1d ago

Reliable source for Costing

1 Upvotes

Is using RSMeans for costing the projects along with prevailing wages. Is this the correct way?


r/estimators • • 2d ago

Estimating for Construction Management

5 Upvotes

I've worked for 11 years doing estimating at a small-ish company (40 or so employees) that does underground utility locating and potholing. I've been approached by an industry colleague to go over to his company (25 people or so), where they do construction management, scheduling & claims, and project controls. They handle mostly public works projects, and work at airports and ports. I would be expected to do estimating and verifying change orders. They don't currently have an estimator, those tasks has been handled by the president and project managers.

My concern is that I've been in a very narrow niche of construction in utility locating / potholing, typically a small portion on the design side working with surveyors and civil engineering firms. I don't have much exposure to construction management at all. What type of knowledge should I be looking to learn? What kind of skills do I need to perform well at this job?


r/estimators • • 2d ago

Estimating roles at Turner and Townsend

6 Upvotes

Does anyone work at TT in the estimating/cost manager department? I’m wondering if someone can shed some light on how it is working there. Is there a good career progression if I’m starting as a Cost Manager? How many PTO days are there? Are annual raises good? Any additional advice?
Thank you for any advice.


r/estimators • • 2d ago

2026: Which paid bid platform is worth it for a small grading/excavation subcontract in Georgia?

0 Upvotes

Hi, I am working for a small, established grading, excavation, hauling and site development contractor based in Georgia. We want to find more commercial subcontracting opportunities with general contractors.

We have never used a bidding site before but feel like we need to try something new. I have spent the day setting up trial accounts. Before buying a subscription, we'd appreciate feedback from people currently using ConstructConnect, PlanHub, BuildingConnected, Dodge or another platform. So far, I am not impressed. Looks like you have to make a pretty big investment to see the "real" projects? We are a small company, with no extra time or money to waste.

We really need help finding suitable projects and connecting with GCs bidding them, rather than takeoff or estimating software. We are looking for real feedback from similar companies. Thanks in advance.


r/estimators • • 2d ago

Drywall takeoff advice

1 Upvotes

Question, do y'all have different qtys for hung drywall vs finish? I was told to use the same qty as full sqft. What are your thoughts?


r/estimators • • 3d ago

Blue beam takeoffs directly to excel

10 Upvotes

I enter my quants manually and have recently tried playing around with the feature that links it to the sheet to populate it . I’ve gotten it to work but it seems more hassle to maintain it then it actually saves time , as one scope update / VE proposal or change in the way I need to present it and then I have to mess with it again and relink them all again. Am I just not being efficient or does anyone agree ?


r/estimators • • 3d ago

GC Estimators: What's the procedure after you're awarded a project?

10 Upvotes

I am a division 6 and 12 estimator for a custom millwork shop, and I'm just trying to get an idea of what goes on behind the scenes on the GC side in the days / weeks after a project is awarded. Obviously every trade is eager to know if the GC is going to use them, or at least get feedback on their number. But is it a pain in the ass when subs are calling you the day after the award to see where they stand? Part of me understands that in the grand scheme of things, the millwork is a small and somewhat less important aspect of a project, but at the same time, I wouldn't be doingy job if I wasn't hounding GCs to see how my numbers look.

I guess I'm just curious what goes on on that side, and how long until a decision would be made on which millworker to use.


r/estimators • • 4d ago

Uh oh, our AI takeoff tool is getting good at commercial Div 6/12..

Post image
35 Upvotes

As our company is heavy as hell on the AI train my boss is continuously developing the commercial casework bid takeoff template.... This is a $1.4 million elementary school I won back in June and did the takeoff 100% myself, and was just sent the results of running the job documents from scratch through the updated AI template. It's a little scary because the sills were a biiiitch to go through and it almost nailed it dead on. *nervously cracks neck* Oh boy... I really want to retire one day as an estimator...


r/estimators • • 3d ago

On the verge of getting fired. Struggling to get clients in the insulated metal panel industry.

15 Upvotes

I'm fairly new to the construction industry, and my job is to find clients who need insulated metal panels (IMPs).

I've been sending cold emails to estimators and contractors, but I'm barely getting any responses. I don't want to annoy them with constant follow-ups either. I already know they are very busy.

I'm also not very confident in my spoken English, which is why I struggle with cold calling.

For those who work in construction or estimating, what actually makes you open and respond to an email from a new supplier?

I'm genuinely trying to improve and would appreciate any advice. Even getting my first client would mean a lot to me.


r/estimators • • 3d ago

How do you get ITBs for large commercial projects?

6 Upvotes

I'm subscribed to BuildingConnected and get bid invites there but the vast majority are small projects, <10k sqft. Where do you find the large projects to bid on?


r/estimators • • 3d ago

I built an app that lets Claude do Takeoffs for me, and its been disappointing

0 Upvotes

Hello all, I’ve been deep in Claude since around this time last year, the good Opus 4.5 days, and have been constantly trying to implement AI into my Takeoff workflows for the estimating side of things.

One thing led to another; before you knew it, I had built a Bid desk from scratch, which I now use for my day-to-day work.

It's hard to manage expectations when you're the builder, and there is so much hype about the technology.

Yes, my app successfully lets Claude connect to my takeoffs, see sheets, and take area and length measurements I can correct in real time; however, Claude has been very tough to reliably hand off estimating to due to Anthropic always tinkering with how they serve the models in Claude Desktop or Claude Code, or just the changes that come with new generations of models.

I’d kick off a Job expecting to come back 30 minutes later with meaningful progress, but the model stops all the time randomly. 

I've tried updating Claude.MD, tweaking the skills I have on my computer, Specific prompt templates, etc. It's almost like I need to go build the whole harness from scratch, which will be another grueling year my wife would not stand by again lol

Long-running tasks are solved for coding, but I don't think the Tech is there yet for 90% of all office work, and people really need to rebase their expectations on the effects this will have on our industry.

Just my 2 cents, though: if you're out there building, keep up the good work, and I would love to try out your stuff


r/estimators • • 4d ago

Why don’t we get the original CAD files?

15 Upvotes

I’m still new to this but I feel like a big gripe I’ve seen is just how tricky it is to get every detail from a 2D rendition pdf plan. Ive been wondering if we got the original CAD file, wouldn’t we know exactly what goes where and how much of everything? Why wouldn’t we just get the source file why is the standard getting this rough copy of something and not the source of truth?


r/estimators • • 4d ago

What's your Claude Bluebeam experience?

14 Upvotes

We got a bluebeam max trial and I've messed with the claude link a tad but I haven't found any exciting use for it yet. What's been your experience?


r/estimators • • 5d ago

Architect here, what’s one thing in a drawing set that always makes your life harder on bid day?

45 Upvotes

Trying to get better at this from my side. i know the obvious ones like incomplete sheets and late addenda, but i’m more curious about the small repeat offenders. things you see in every set that make you groan. i’d rather hear what actually costs you time than guess.


r/estimators • • 4d ago

Can someone who’s sales driven do well in estimating?

6 Upvotes

I’m currently working in construction operations(PE), but I’ve always been pretty sales driven. I have a background in high ticket sales, enjoy networking, building relationships, and generating new business.

I’m considering transitioning into estimating/preconstruction because I feel like it could be a good combination of my construction experience and business development interests.

My long term goal is to eventually develop my own commercial and small multifamily projects, so I also see a lot of value in understanding construction costs, takeoffs, bidding, and the numbers behind a project.

For those already in estimating, do you think someone with a sales oriented personality could thrive in this field? Are there opportunities to combine estimating with client relationships and business development as you move up?