r/projectmanagement • • 1d ago

Discussion Anyone else feel like the recurring process only works because you personally chase it?

14 Upvotes

I used to run a handful of recurring processes in a large organization's IT department: planning cycles, decision meetings, that kind of thing. Every cycle had the same shape. A date was set, and a bunch of people each had something to deliver at some point before it.

Building the plan was never really the hard part. The hard part was the weeks before. I wrote the same reminder emails every cycle, kept track in my head of who was behind, and slowly became the person people connected with nagging. The process worked, but mostly because I chased it.

For those of you who run something similar:

Which part would you most like to stop doing: building the plan, or chasing it?

What do you use to keep track today? A spreadsheet, calendar reminders, a ticket tool, something else?

Has anything actually reduced the chasing, or does it always come down to one person following up?

Curious how others handle it.


r/projectmanagement • • 1d ago

Is it normal for the PM role to be 60% commercial battles with contractors?

15 Upvotes

That's my experience, I hardly have any time to review technical documents, drawings, RFIs etc. Most of my time goes into dealing with variation and time claims.


r/projectmanagement • • 1d ago

Need help tracking team for DSU

6 Upvotes

There’s no scrum master on the team so that role is split between me and the TPO. I run our daily standup but for now I go through the user stories in sprint, grab an update on it and ask if they have any blockers on getting the stories completed.

In other projects I would have an Excel file that I would be given and all I had to do was assign owners to tasks and track them based on completion/milestone.

How can I track progress on the project better for my daily standup calls?


r/projectmanagement • • 1d ago

Fired for 'Performance' but no cause given

30 Upvotes

I'm writing this still somewhat in shock. I was fired this afternoon for performance but when I asked for a reason, the CEO said he could not provide one. He also told me that he was just the messenger. When I asked who made the decision he said he couldn't tell me that either. Has anyone ever experienced this?

I was never on a pip and the only real feedback I was given was that some developers didn't like my communication style. The CEO just shrugged and was like yeah sorry.

I've only really gotten positive feedback. In fact, just the day before, one of the only owners told me I was doing a great job on a difficult project. Clients also gave me positive feedback, I even helped land repeat business. I did some soul searching, and I had been having issues with a particular developer. I had raised my concerns to their manager and was told I handled the situation correctly.

However, I got the mysterious 'check in' meeting invite after a run in with this guy yesterday. He also reached out to me to apologize today. This incident was not mentioned, but the CEO just said multiple people had bad feedback on me. Nothing was provided, not even anonymous information.

I'm not naive, but it's weird they wouldn't come out with anything.

For further context, the company has had several rounds of lay offs. In fact, another developer was laid off this morning. But the CEO told me I was fired.

My boss recently left and I had a temporary manager. She would protect me from things like this. However, I have disclosed to them that a headed ADHD and I had time set aside for paternity. I am not sure if I have a case. I know that it was an at will employer..

I know that I'm not perfect, but I think that it's really weird to be getting positive written feedback and then told that I'm fired because my performance is not good without anything being documented and barely any type of verbal feedback given. I would appreciate any insight folks have had with stuff like this


r/projectmanagement • • 2d ago

General PM that is not very articulate

19 Upvotes

Hello. If an IT PM is not very articulate on how he communicate with stakeholders, is he gonna last in this industry? He still able to deliver his projects but communication is his weakest point.

Is being able to deliver the projects on time and on budget enough? The process throughout that delivery is hard because on how the PM communicates, and misunderstood the technical terms and processes. He gets confuse as well especially if the project is new and will involve all business and critical application -- but he still able to deliver 🤷‍♀️ it's just the project team and his boss got stressed and confused

How do you improve your communication especially in IT?


r/projectmanagement • • 2d ago

General Project emails

20 Upvotes

Hey PM's - can you provide any tips , tricks, SW, Workflows in sharepoint, Excel etc. My questions revolves around getting emails from my customer for a project. They are asking for things in the email. Deliverables, Files, Documents, timelines etc. I get these emails all the time from random people at the customer. My question is what is the best way to transfer this request to some kind of tracking tool. I kind of just manually add these to a spreadsheet. This seems very 2005. I figure there has to be a better way??


r/projectmanagement • • 2d ago

ISO best practices for managing reviews in Asana (or whatever tool)

10 Upvotes

Looking for feedback on best practices when it comes to reviewing assets in Asana. Specifically how people are structuring the tasks and subtasks involved. I have more of a platform background than a project management background, so hoping to learn from people who know more.

Our typical setup looks something like this:

Parent task (e.g. landing page)

* Write Copy

* Build Page

* Approval (reviewers put their feedback in the comments of this task)

* Review (person A)

* Review (person B)

* Implement changes

* Handoff

In this structure, we expect that person A and person B will put their feedback in the comments of the subtask called "Approval." This has worked fine for years, but now with a larger team I'm getting complaints that it's too messy and confusing to have all the feedback in that Approval task. Instead, people are asking to have it within each person's review task. So like this:

Parent task (e.g. landing page)

* Task

* Task

* Approval

* Review (person A) (Person A's feedback here along with any clarifying conversations)

* Review (person B) (Person B's feedback here along with any clarifying conversations)

* Implement changes

* Handoff

To me, this seems more confusing, because now the person making the changes needs to sift through multiple tasks assigned to others and find all the feedback and dedupe overlapping feedback, and potentially have the same or slightly different conversations with different people.

Do you convert every point of feedback into a new subtask for the person making changes? If so, who is aggregating and assigning those? A project manager, I assume? And where are you housing that?

I'm open to changing our system, but I'm interested in aligning with best practice more than "what So-and-so likes." So, how do you handle reviews effectively?


r/projectmanagement • • 4d ago

If You Had Only One Document to Review, What Would It Be?

15 Upvotes

Hey project managers,

What’s the first and last thing you review every day? With so many project documents, RAID logs, action items, schedules, meeting notes, reports, etc., what’s your single source of truth for quickly understanding the overall status/ disposition and health of a project?


r/projectmanagement • • 5d ago

Career My responsibilities are growing, but I’m not sure I’m actually developing

23 Upvotes

I previously worked as a Project Management Specialist, and I’m now in a similar role, but this time focusing on IT projects.

I joined a new, larger organization, which I saw as a great opportunity for professional growth. However, I came into this role without an IT background, so there has naturally been a learning curve.

The transition has been challenging, not necessarily because I can’t handle the work, but because I often feel like I’m navigating everything on my own.

My manager doesn’t communicate directly with the team very often. Instead, he mainly communicates through our team lead, who then relays information and instructions to us.

Initially, I also struggled with feeling overlooked and somewhat ignored by my team lead.
Things have improved since then, and my team lead has gradually started relying on me and trusting me with more responsibilities.

However, there’s still something missing: structure, guidance, and feedback.

I’ve been here for three months, and not once have I had a proper one-on-one meeting, a performance discussion, or even a regular check-in to understand how I’m doing.

I’m constantly being put into new situations, assigned projects, and expected to figure things out. And I do. I take initiative, find solutions, manage situations, and get things done.

But I have no real way of knowing whether I’m approaching things correctly, where I could improve, or whether I’m meeting expectations.

There’s no defined learning path, no structured onboarding, and no clear development plan, especially considering that I’m transitioning into IT project management without a technical background.

I don’t necessarily expect someone to hold my hand or walk me through every task. I’m comfortable learning independently and taking ownership. But I do believe there’s a difference between being given autonomy and being left to figure everything out without direction.

What I find most frustrating is that I’m gaining responsibilities, but I don’t feel like I’m gaining the same level of guidance or professional development.
I want to grow into this role, understand the IT environment, become better at what I do, and know that the way I’m working aligns with the organization’s expectations.

But without feedback, communication, or mentorship, it’s difficult to measure my progress or know whether I’m actually developing.


r/projectmanagement • • 5d ago

The most detailed plan I ever built was also the most useless one

110 Upvotes

Years ago I spent nearly three weeks building a plan for a large program. Every task estimated, every dependency mapped, people allocated down to half-days. Leadership loved it.

Three weeks into delivery, reality drifted. A supplier ran late, a client review moved, two people got pulled elsewhere. Normal stuff. But updating that plan properly took most of an afternoon each time, so I started batching changes weekly, then every other week. By month two the real plan lived on a whiteboard, and the beautiful one was basically a historical document.

A few years later I ran something similar with a much rougher plan that took a couple of minutes to change. It was less impressive and probably less accurate on day one, but people actually used it, because it was still true.

That contrast made me wonder whether a good plan is less about how accurate it is at the start and more about how cheap it is to change. Though I can see where that breaks down, in construction or regulated work the detail is often the point, and maybe my first plan failed because of the tool, not the detail.

How do you see it? Have you had a detailed plan die because keeping it current was too painful?


r/projectmanagement • • 7d ago

Transformation is everywhere.

16 Upvotes

So I've been doing a bit of research on LinkedIn and "Transformation" seems very popular these days. I was looking specifically into ERP transformation.

Specifically within the ERP transformations there seems to be a call for project managers to also perform change management.

Those of you in the business transformation, ERP transformation space do you feel like it confuses your branding that people from business analyst to lean practitioners also are labeling themselves as transformation agents?


r/projectmanagement • • 7d ago

Career Freelance PM Websites

20 Upvotes

Hi! I'm considering establishing an LLC to freelance PM and test the waters. I'm curious if any contractor/freelance PMs have websites established and if so, coudl you share an example?

Absolutely not looking to copy or steal, but would love to see how other PMs market themselves

Thanks!


r/projectmanagement • • 9d ago

How did everyone handle the Outlook outage?

51 Upvotes

My Thursday afternoon was pretty quiet and peaceful. I caught up on a lot of things before I really realized that there were no new emails coming in.


r/projectmanagement • • 10d ago

How did you survive without AI? Salute to the OGs 🫡

0 Upvotes

I’ve been an official PM for about 7 years but I’m curious as to how those of you that were in the field well before AI and even things like Slack survived. If I had to really be accountable for every rambling meeting or new priority without AI I’d be more stressed than usual. Salute to those that did this strictly in excel or something lol.

Update: Welp, salute to us all in the new environment. Apparently, it’s harder.


r/projectmanagement • • 10d ago

Who actually owns the resource plan where you work?

21 Upvotes

Something happened last month that made me realize we have a gap nobody’s responsible for. One of our senior engineers ended up booked on three projects at once. Each PM had asked for her in good faith. Each one checked their own plan and saw she was only on their project two or three days a week, so it looked fine. Her line manager approved each request separately. Ops saw her hours come through and nothing looked unusual until it was already too late. And the principal who sets priorities had no idea any of this was happening.

She was at about 140% for six weeks before she said something. The weird part is that nobody did anything wrong. Every person did their job. The PMs owned their projects, the line manager owned her development, ops owned the timesheets, leadership owned the priorities. But nobody owned her total load across all of it. Everyone assumed someone else was watching the whole picture, and that someone didn’t exist.

I think this is where a lot of overload actually comes from. Not from bad planning, but from the cross-project view falling in the gap between roles. PMs think in projects. Managers think in people but approve one request at a time. Ops sees it after the fact. And the person who could make the trade-off between projects usually isn’t looking at individual names at all.

We’re now trying to decide whose job this is, and every option has a catch. If it’s the PMs, they’re judging their own projects. If it’s line managers, they often don’t see project priorities. If it’s ops or a PMO, they need the authority to say no to a PM. If it’s leadership, it rarely gets attention until something breaks.

So how does it work where you are?


r/projectmanagement • • 11d ago

Career New Project Manager struggling with accountability and stress. Is this just part of the job?

94 Upvotes

I have around 11 years of experience in IAM/cybersecurity, primarily in development, support and architecture. Last year, I transitioned into Project Management.
My role now involves governance, milestone tracking, resource management and stakeholder communication.
I’ve spent the last 4–5 months on a particularly challenging client project with constantly changing priorities, technical complexities and a team that struggles to meet commitments.
What I’m finding difficult is being accountable for delivery when the actual execution is in other people’s hands. Even when I’ve followed up, identified risks and escalated issues, I’m still the person answerable for missed milestones.
I’m also learning to manage people who were previously my peers, and getting them to take ownership rather than relying on me to chase everything has been challenging.
For experienced PMs:
Is this level of stress and accountability typical?
How do you stop taking ownership of things outside your control?
How do you make technical leads accountable without constantly chasing them?
Are internal PM roles less stressful than client-facing delivery roles?
Is this something that gets easier with experience?
I originally moved into management hoping for better work-life balance, but I’m beginning to question whether this career path is right for me.
Would appreciate some honest perspectives, particularly from people who transitioned from technical careers into PM.


r/projectmanagement • • 11d ago

PM basics for newcomer

11 Upvotes

I am an electrical engineer with 20 years technical experience.

I am starting a new job as system engineer - it's basically a technical project management and coordination role. I have some project management tasks to do, coordinate with client and suppliers, control costs/schedule and deliverables etc but there is a project manager and a project director on top of me plus a planner and purchasing person.

I've done technical coordination and design before but not the project management aspects related to costs, schedules etc.

Where can I learn the basics of project management? Any free courses out there or specific books?

There's basic training I will get from my employer, I'm looking for other resources I can use.

Are Coursera classes like the Google certificate useful?


r/projectmanagement • • 11d ago

Discussion Commiserate w me?

6 Upvotes

Architect does nothing to spec, then asks 50 questions to understand details of spec, then circles back to some unknown idea they had originally that wasn't on their drawings, and stalls out submittals. I want to scream.


r/projectmanagement • • 12d ago

General APM course recommendations please.

2 Upvotes

I am wondering if there is an APM recognised PMQ course that offers 12 month payment plans?


r/projectmanagement • • 12d ago

Career I'm sorry, but would someone with 2 years minimum of project management assistant experience.. not just apply for project manager?

Post image
132 Upvotes

Hi there,

I'm a medical laboratory scientist in Greece who was just looking through some job listings, and found this.

I'm confused.. wouldn't someone with a life science degree, lab experience, and at least 2 years project management assistance experience have as their next step.. a project management job?

What person who meets in their criteria would apply for a third year of project management ASSISTANT job? Or even a fourth one? This seems awful.

Is this how clinical trial projects work?


r/projectmanagement • • 12d ago

Discussion Has any of your AI integration projects not lived up to the expectation hype?

24 Upvotes

I recently had a very interesting conversation with a peer recently and they basically admitted that their organisational AI system wasn't the silver bullet that they had expected it to be and their senior executive is trying to downplay the impact of the delivery. Do you have an experience you can share with the forum?


r/projectmanagement • • 15d ago

Business experts on ERP or system projects: did anything actually come off your plate when you joined the team?

11 Upvotes

For those who've been the "business expert" on an ERP or system project while still doing your regular job: did anything actually come off your plate? What helped (backfill, paused work, a manager who said no to other things), and what didn't? Asking because I keep seeing kickoff plans that say the core team will "support the project part-time" and then nothing on their calendar changes, so the project ends up getting evenings and saturdays and testing gets crammed at the end. tbh I think the person who has to give the work away is the leader, since the team member can't just decide to stop doing half their job. but I'm curious whether anyone's seen this handled well, and what it looked like in practice.


r/projectmanagement • • 16d ago

EVM

11 Upvotes

Unpopular opinion: Earned Value Management (EVM) is overrated, and the industry needs to seriously revisit, reassess, and recalibrate how we use it.
We have become obsessed with CPI, SPI, and earned value percentages, as though they reliably reflect actual project health.
But here’s the uncomfortable question: Can a project report excellent EVM indicators while its critical path is deteriorating, productivity is declining, and its forecast completion date is slipping? Absolutely.
EVM measures performance against a defined baseline, but it doesn’t necessarily tell us whether the project is truly progressing toward successful completion.
A healthy SPI doesn’t guarantee an achievable completion date. A favorable CPI doesn’t necessarily mean the final margin is protected.
Perhaps it’s time we stopped treating EVM as the gold standard of project performance and started placing greater emphasis on schedule integrity, critical path movement, productivity, forecast reliability, and actual completion risk.
My question to fellow planners and project controls professionals: Are we measuring project performance, or are we simply measuring how well our reporting formulas look?
EVM still has value. But perhaps we’ve given it far more authority than it deserves.


r/projectmanagement • • 17d ago

Discussion What’s the best way to handle "billable" vs "non-billable" time for remote teams?

17 Upvotes

We have a mix of client work and internal development. I need to track time to ensure we aren't over-servicing clients on fixed budgets, but I don't want to track every single bathroom break. We use monitask and just have the team tag their time entries as "Billable" or "Internal" when they start the timer. It keeps the reporting clean for clients without making the team feel like every minute is scrutinized. How do you separate billable from non-billable hours in your workflows?