Exposed floor water sealing
I'm repairing the framing over an exterior root cellar and I plan to turn the lid into an outdoor kitchen. There was a roof and walls over this at one point, but I hink I'll be installing some pony walls around the exterior with a gazebo roof over the top.
Where I'm kind of stuck, how do I water seal the flooring over the root cellar to keep water from penetrating in? The "best" idea I had was to epoxy over the subfloor but not too sure about potential swelling issues with it being outside and exposed to temperature swings.
I would think once the roof and pony walls are up, it won't get wet often but rain/snow does come down sideways sometimes. Any input ideas are appreciated!
r/AskContractors • u/These-Average-1502 • 15m ago
Option A or B? Concrete repair.
Some of you may have seen my other post about my Contractor leaving wood embedded in my new driveway
During the pour, the Concrete hardened too quickly and they weren’t able to get 6 wood forms out in time, so we have six wood forms embedded in our driveway with a pretty rough finish and about 1” of concrete covering the embedded wood
Our Contractor agreed to do one of two options. I need your help deciding which one we should go with.
Option A they smooth over the finish with a concrete bonding repair mix and leave the wood. They give us a $1000 discount and they warranty the driveway for life. If it cracks down the line, he will repair it. He said if it cracks next year he will come out and remove the last three panels of concrete and re-pour them.
Option B they cut out the last three panels by the wall of the driveway and closest to the street. They would do the demo this upcoming spring and re-pour them. They would have to connect the new concrete driveway to the current concrete driveway with rebar. There will be no discount with this option. The contractor said this may leave us with a weakened driveway because it will no longer be a solid pour. Do you think this would weaken the driveway and present a concern in the future?
My question is, what would you do if it were your house? Would you take the discount and warranty or would you have the repair done?
How long before we start to see issues with the embedded wood?
r/AskContractors • u/Sivello • 35m ago
Question about outlookers
I have a contractor framing my house and I noticed that on the gable overhangs they had only put a couple of outlookers on the flying rafters. I asked google and the AI response said that they need to have them every two feet.
For reference, the overhangs are mostly 12" overhangs, and they put outlookers every 6 feet or so. A couple of the overhangs are 12" off the plywood too. I can't find an actual reference in the code books for how often the outlookers need to be, so I don't have a definitive answer, and the contractor wasn't sure either, he just tried to assure me that it's the way they've always done it and it has always passed inspection.
r/AskContractors • u/Peanutx73 • 4h ago
How big of an issue are these non existent butt joint gaps?
Truwood siding. Manufacturer says 3/16th gap, but the contractor just wants to see if it's flagged by the inspector instead of fixing it.
r/AskContractors • u/brad_samuels • 1h ago
Bathroom Remodel Issue
We're in the midst of a remodel that involved a separate shower. Originally, the door to the shower had a gap at the top of the door of 6-8 inches. The contractor put in the new door but completely filled the opening. The vent is in the center of the bathroom and there is no ventilation in the shower. When I pointed out that the shower was still soaking wet several hours after use, the contractor's response was "just leave the door open." My questions:
Would enclosing the shower like this even be up to code? Or in any way be considered a good idea?
r/AskContractors • u/Grumpy_bonsai23 • 1h ago
Is it overkill to hire a company that handles lead based paint if I want to replace my gutters on my house? It was built in 1965 and may have lead based paint on the outside
reddit.comr/AskContractors • u/Even_Bank6369 • 14h ago
Contractor ghosted me after demo, what are my options?
So, I hired a contractor for a kitchen remodel. They did the demo work, everything looked good, and then...nothing. They stopped responding to calls and texts, haven't shown up for a wekk. I paid them a deposit and for the demo work. Do I try to get my money back, or just cut my losses and find someone new? Any advice would be approciated. This is a nightmare.
r/AskContractors • u/dogsintored2019 • 2h ago
Replacing Spanish roof: Would love thoughts on using Interlocking clay tiles vs. old style mission (pan and cover clay tiles)
reddit.comr/AskContractors • u/Lyons_or_Turtles • 6h ago
Chimney Flashing
Does this chimney install look correct? I don't see evident step flashing, it seems odd that they installed screws in the top of the chase cap, and I'm wondering how they would've flashed where the ridge cap meets the chimney. Finally, it doesn't seem like any consideration was given for siding on the chimney. This is at a friend's build and I took the pictures with a drone. I do plan to climb up there to get a better look. Appreciate any insights.
r/AskContractors • u/itspactool • 3h ago
What's your process for keeping siding reveals consistent across a long wall?
Getting consistent spacing across a full exterior wall can take some planning, especially when you're working with longer boards or dealing with areas where the layout isn't perfectly straightforward.
There are a few different approaches to setting your initial layout, checking spacing as you go, and making adjustments around windows, doors, and corners.
Calling on carpenters and siding installers here: what's your usual process for keeping reveals consistent throughout an installation? Any layout tips or habits that have made the job easier over time?
r/AskContractors • u/Affectionate_Cap_266 • 5h ago
Acceptable Soffit Framing/Drywall Method
r/AskContractors • u/brightbananas738 • 5h ago
Concerning?
Ceiling and south facing wall have been getting progressively more cracked. Been here for 11 ish years now. Not sure if it’s something that’s a ‘oh shit i should really get this checked out’ or just a moderate concern. TIA
r/AskContractors • u/Additional-Pickle727 • 9h ago
Microcement application question
hired a contractor to put concretta microcement over my existing tile. The product specs you can put it directly over the clean tile.
But it appears he has put a Valspar paint primer over the tile. Then used S mortar with fiberglass mesh on one wall. He plans to put the concretta will over the mesh.
Will the mesh and mortar stick to tile? Will a primer formulated for paint in between the tile and mortar be an issue in the future?
r/AskContractors • u/Grey_Boulder • 10h ago
Stair Retread Question
Hello Contractors!
My wife and I are retreading our stairs with those oak kits from a big box store. The stairs originally had carpet. When ripping up the carpet, we noticed on each riser that the previous homeowner/contractor put 2x8s cut to 7 3/8 out to extend it out. I’m assuming to create a backer for the carpet? Should we keep these in place? Keep in mind we had to remove some treads because they were damaged. It seems like maybe the original stringers were cut incorrectly and that’s why they installed 2x8’ was to have support under the end of the original tread. So far we have been putting 3/4 inch plywood on every tread to act as a support for the retread kit which is then supported at the end by the 2x8 that’s in place. They are all measuring 9 3/4 depth.
Are we going to cause any structural issues by leaving these 2x8’s in place? My biggest concern is making sure all the steps prior to the retread are within the 3/8inch code and so far, all of them are, but there are some funky backer pieces making that happen. It seems like every step farther down from the top we are having more “additions” to the riser to ensure the tread has support to the end.
Any insight would be appreciated.
r/AskContractors • u/MrShnatter • 18h ago
Other Some questions about commercial construction?
My church put on an addition over the last few years. I am handy and have helped them out with simple repairs over the years.
But I'm getting frustrated volunteering my time for what I think is poor construction issues.
Wonder if people can shed some light on 'am I being too picky', or these are legit issues and or how you suggest things work out with these things.
A key issue for me is that the used a congregant member as the GC. Most people would think that person would have a vested interest in making sure things go smooth. But I don't feel that's the case.
- There's a slow leak over an exterior doorway when there's a heavy rain. could the gaps in the grout potentially be the cause? They are asking if I could identify the leak and fix it. I think on a couple year old building, that it's the GCs job (at no charge?).
- Wat do you think of the gap around the conduit for this exterior ceiling light? I could caulk / seal it, but feel I or any other volunteer or paid person should have to deal with that - it's shoddy construction / hold the GC accountable?
- I was told that emergency lighting was needed OUTSIDE the exit doors to get the CO? I know commercial buildings have emergency lighting inside. Supposedly the outside emergency lighting needed to be added after most construction so they could get the CO. Is exterior emergency lighting a new thing?
- An LED light over 1 exterior door (not the emergency lighting lights) isn't going on reliably - sometimes comes on during the day. Sometimes not at night. People don't know if it's on a timer or light sensor. The building plans just show the light (K) and lights on the walls of the stairs (L) leading to the doors are on 1 circuit and go to panel PP1, breaker 39 (and yeah, the plans they have show 2 ceiling lights not the 1 that's there).
That breaker #39 is listed as 'spare' in the list inside the panel and it's turned off.
It's an LED so it hasn't likely burned out already. I spent an hour unsuccessfully just trying to figure out why there's not power in the junction box of the light. In construction like this, would you think there'd be a manual the GC would create detailing things like that or who in a commercial situation knows that a light is controlled by a timer in that location, or light sensor on this outside wall? or should the plans show a timer or sensor in the circuit? (maybe not where it was installed, but at least I'd know what I'm looking for)
Am I wrong to be frustrated in having to invent the wheel / figure out how a light is controlled / where a leak is coming from / caulking openings in a 2 - 3 year old building? I want to help / volunteer and I DO like fixing things. But feel they should hold the GC accountable and kinda resent them looking for free labor instead.
Am I wrong?
r/AskContractors • u/DrewDownToLearn • 19h ago
Low Spot
I’ve got a low spot in my walkway, which I assume was caused by faulty workmanship years ago. Is there any fix to this without removing the whole section?
r/AskContractors • u/Particular_Truck_258 • 17h ago
[For Hire] Custom Website Development, Redesigns & SEO Services
Hey everyone! I'm a web developer specializing in custom websites, website redesigns, e-commerce development, and SEO to help businesses improve their online presence.
Here's an example of my work: https://nodoubts.ca
If you're looking for a new website or want to improve your existing one, feel free to DM me!
r/AskContractors • u/ObiethePitBull • 1d ago
Contractor skipped Wedi sealant on basement shower/other waterproofing concerns. How worried should I be?
Getting a basement bathroom redone and I'm not a tile guy, but some of this doesn't look right to me. Photos attached. Trying to figure out what's a real problem vs me overthinking it before they finish up and I finalize payment. I realize I probably should’ve asked these questions earlier.
Setup is a traditional mud bed pan with a 40 mil PVC liner (Oatey), then Wedi Sentinel Pro board on the walls over it. Liner goes up the wall maybe 6"? Tile is all up now, floor is grouted but not the walls.
Stuff I noticed:
- No Wedi joint sealant on any of the seams or screws. They said they put silicone in the screw holes before screwing, saw no sign of silicone (figured that would leave some residue). Inside corners have some kind of tape and mud, outside corners have nothing.
- Hansgrohe iBox valve. I can't tell if anything is sealing the board to the valve body. Didn't see the black sealing collar on the face of the board. Trim isn't on yet.
- Spout: nothing sealing the hole in the board that I know of
- The liner corners at the curb (where it folds over and down the outside) weren't sealed or taped as far as I can tell.
- The niche looks like it had the inside corners taped, but not outside or top
- They put board on top of the curb and screwed it down, through the liner into the wood. After I said something they put silicone over the screw heads.
- Curb is now capped with a quartz-like piece (2 cut pieces). It's dead level, no slope back into the shower. Glass is going on top of it, door will be on side perpendicular to wall
Questions:
- What do I need to ask them for clarification on?
- With a liner under everything, are the unsealed Wedi seams actually a big deal?
- Should I make them inject sealant around the valve before the trim goes on?
- Screws through the liner on the curb top: how bad is this with a quartz cap over it?
- Level curb with glass on top, is that acceptable?
- Anything else I should ask them to fix or show me before I pay?
Not trying to bash the contractor, just want to know what's worth pushing on. Thanks for any help