r/EnergyStorage • • 5h ago

Hello, I hope to hear your opinions.

1 Upvotes

Hello, I wanted to get some of your opinions on a project idea related to energy, as it works like a portable battery relying on several sources including solar, kinetic, pressure, and sound energy, playing a role in charging the battery. The primary sources are solar energy and pressure, while sound has a secondary role with a small amount of power, and kinetic energy kicks in when the others fail by spinning a motor to generate energy. To ensure the battery works without damage, there will be two of the same model to guarantee good performance and avoid pressure on the battery. Also, there will be diodes and fuses to cut off the current in case of a fault, and an external insulated casing to ensure safety, with the primary goal of charging a phone or a small device. I hope to get your thoughts on this.


r/EnergyStorage • • 19h ago

China grid-connects world’s first artificial-cavern CAES plant

Thumbnail
pv-magazine.com
2 Upvotes

CAES facility is 300 MW/1,800 MWh and has an 8-hour charging cycle, with 6 hours of continuous discharge.The 300 MW/1.8 GWh project uses excavated hard-rock chambers, expanding compressed-air storage options beyond natural salt caverns.

Cost $368 million! Wow!

13 CAES projects are under construction, totaling 4.95 GW/23.95 GWh!


r/EnergyStorage • • 1d ago

again battery launches, bringing a new way to repurpose used EV batteries to market.

Thumbnail kickstarter.com
4 Upvotes

again is a Wilmington NC based startup that uses decommissioned EV batteries to deliver new portable power accessories


r/EnergyStorage • • 1d ago

MyEnergi Libbi Battery intervention during winter?

Thumbnail reddit.com
2 Upvotes

Cross-posting if anyone has any thoughts / advice / guidance


r/EnergyStorage • • 2d ago

China dominates battery graphite, but this startup could break the monopoly

Thumbnail
techcrunch.com
13 Upvotes

r/EnergyStorage • • 2d ago

Looking for some reflection on an idea with sand batteries.

Thumbnail reddit.com
1 Upvotes

r/EnergyStorage • • 3d ago

МК-29

0 Upvotes

Я из России мне десять лет и я хочу показать концепцию нового аккумулятора на основе титана и алюминия (не готовая схема просто концепция)

Титан соприкасается с раствором хлорида титана вот реакцияTi-Ti4+ +4e- и также с алюминием Al-Al3+ +3e-

А также между электролитами и пластинами катионообменная мембрана (CEM)

Прошу не химиков или тех кто разбирается в аккумуляторах сказать в комментариях насколько эта идея возможно в реальности?


r/EnergyStorage • • 3d ago

Quarterly Review

Post image
4 Upvotes

r/EnergyStorage • • 3d ago

Installers and EPC buyers: when a quote says 100 kWh, where should delivered energy actually be measured?

0 Upvotes

Two suppliers quote a 100 kWh battery system. One means nominal DC battery energy; the other describes usable energy at an AC connection point. Comparing the headline numbers can leave an installer accepting a different deliverable from the one the customer expected.

Disclosure: I work with EITAI, a storage-battery manufacturer and inverter distributor. This is a procurement discussion, not a claim about a particular product.

I would resolve three things before comparing quotations.

  1. Agree on the energy boundary.

Ask whether the quoted figure is nominal DC energy, usable DC energy within the permitted operating limits, or usable AC energy. For an AC figure, identify the meter location and whether auxiliary consumption is included.

Illustrative arithmetic only: assume a fictional 100 kWh nominal system provides 90 kWh of usable DC energy under the agreed conditions. With an assumed 95% discharge-path efficiency, that becomes 85.5 kWh AC. If 2 kWh of auxiliary consumption must also be deducted within that measurement boundary, net delivery becomes 83.5 kWh.

Those are invented assumptions, not EITAI specifications or recommended settings. Real usable energy needs model-specific evidence. If a supplier already states net usable AC energy under those conditions, do not apply the same deductions again.

2. Compare the operating conditions, not only the units.

Ask for the output power at which energy was established, temperature conditions, start/end criteria, battery age and applicable equipment configuration. A quantity in kWh without its conditions is a weak basis for accepting a specific delivery obligation.

Also separate discharge-path efficiency from round-trip efficiency. The latter accounts for energy going into and coming back out of the system; it should not automatically replace the one-way assumption in the example above.

3. Define the record that will close acceptance.

My proposed bid-comparison sheet would contain:

- Capacity definition and measurement point

- Auxiliary consumption included or excluded

- Required operating power and test conditions

- Source of the claimed usable-energy figure

- Agreed test procedure, responsible party and evidence to retain

- Treatment of interruptions, alarms and configuration changes

Have the responsible engineers agree the procedure within manufacturer instructions and local requirements. Do not improvise protection settings to reach a target figure.

For a distributor, a consistent definition helps make repeat orders comparable. For an EPC buyer, it helps connect the quotation to a measurable handover requirement. Commissioning evidence and ongoing performance monitoring have different purposes; one short demonstration does not establish lifetime performance.

Two useful references:

SAM's battery documentation distinguishes nominal and usable capacity, power-conversion losses and ancillary consumption:

https://samrepo.nlr.gov/help/battery_storage_btm.html

DOE/FEMP describes a method using metered charge/discharge history for operational performance assessment. Its long-term approach is not a substitute for a project-specific acceptance procedure:

https://www.energy.gov/cmei/femp/articles/battery-energy-storage-system-evaluation-method

For installers and procurement teams: which measurement boundary do you normally specify? And which missing definition has caused the most handover rework? Please keep customer details anonymous.


r/EnergyStorage • • 3d ago

La Cina congela l’aria per conservare l’energia solare: 10 ore di accumulo senza litio - la Repubblica

Thumbnail reddit.com
3 Upvotes

r/EnergyStorage • • 3d ago

REPORT: U.S. Exceeds 200 GWh of Energy Storage Capacity Installed to Date

Thumbnail
seia.org
52 Upvotes

During Q3, utility-scale storage deployment was led by Texas (12.3 GWh), Arizona (7.7 GWh), and California (6.8 GWh). But gains are growing throughout the country—so far this year, 11 states have beat their annual records for storage installation.


r/EnergyStorage • • 3d ago

Introducing FAERO™: an extension of our FEST® platform, designed for even higher power – debuting with an anode-free design

Thumbnail gallery
1 Upvotes

r/EnergyStorage • • 4d ago

Installers and EPC buyers: what counts as battery-inverter compatibility evidence before you release a purchase order?

0 Upvotes

A supplier sends an approved-battery list. Another sends a video of a battery charging through an inverter. Both are useful. But would either be enough for you to approve an order and accept responsibility for commissioning?

Disclosure: I work with EITAI, a storage-battery manufacturer and inverter distributor. I would like to compare how installers, distributors and EPC teams assess compatibility evidence before committing to equipment.

I would separate the review into three decisions.

  1. Is the proposed combination actually covered by the manufacturer's documentation?

Keep the full battery and inverter model codes, hardware/BMS identifiers where relevant, firmware versions, document revision/date and intended market together. A brand logo is not a model matrix, and a low-voltage listing does not establish coverage for a high-voltage installation.

This matters commercially because the quoted product and the delivered product need to be the same reviewed configuration. If a BMS, inverter variant or firmware changes after approval, agree who reviews that change and whether any tests must be repeated.

2. What did the factory demonstration or pairing test establish?

A charging clip can show equipment operating together at that moment. For an acceptance decision, I would also request a test record that identifies the equipment, software, operating mode, test duration, conditions, measured results and agreed pass/fail criteria.

Ask whether the record covers only initial communication, or also the operating functions your project needs. Examples to discuss with the responsible engineers include charge/discharge control, SOC reporting, response to BMS limits and permitted recovery after a communication interruption. The method must follow the manufacturers' instructions; these are review questions, not instructions to create faults on live equipment.

A useful distinction: a finished-battery production test marked 'Pass' and a battery-inverter interoperability test are different records. Keep both, with their scope stated.

3. What remains to be accepted at the site?

The site has its own supply, loads, metering, operating modes and local requirements. Define which functions require witnessed commissioning and which measurements will close the acceptance record. If backup operation is part of the project, include the actual agreed backup loads and transition behavior in that review.

The factory pairing record supports this work; it does not contain every site condition. Agree who owns each open item before dispatch, rather than leaving the installer to resolve an unspecified boundary between battery, inverter and site design.

Here is a compact evidence register I would attach to a technical bid comparison:

- Equipment configuration and document revision reviewed

- Manufacturer compatibility evidence and its limits

- Factory test configuration, results and unresolved items

- Site functions still requiring commissioning evidence

- Responsibility for each open item and the acceptance sign-off

- Change-control contact and required record updates

For a distributor, this also creates a repeatable configuration record for the next order. For an EPC buyer, it makes exclusions and responsibilities visible alongside capacity and price. A short, traceable record can be more useful than a folder of screenshots with no equipment identifiers.

Manufacturer references that informed this distinction:

Solis explains lab matching and firmware interoperability for its RHI-1P(5-10)K-HVES-5G-US series. That article is series-specific, not a universal compatibility rule:

https://usservice.solisinverters.com/support/solutions/articles/73000560488-battery-compatibility-explained

Victron separately documents tested batteries and conditions for other third-party batteries, illustrating why one manufacturer's policy should not be assumed to apply to another:

https://www.victronenergy.com/live/battery_compatibility:start

For installers and EPC teams: which missing document or unrecorded configuration change has caused the most commissioning rework in your experience? And what is the minimum evidence package you require before approving shipment? Please keep customer and project details anonymous.


r/EnergyStorage • • 4d ago

Do satellite data/ remote sensing play a part in BESS operations?

1 Upvotes

Let me preface by saying that I have no background in electrical systems, grid technology, or energy storage systems. My motivation for asking this question is purely from a remote sensing application point of view.

I have a vague understanding of how the power grid works. There are the generators, the transmission lines, distributors, and then the last mile delivery. Somewhere along the way, one also needs storage systems in order to regulate the grid, keep it stable etc.

Now, power as a commodity is unique that it cannot be stored in its original form. It needs to be converted into a different form of energy such as potential energy of water in a dam, or as charge in a battery. When the grid needs to offload power, it is used to run water pumps to fill up those reservoirs or to charge the battery storages. The reverse happens when power needs to flow back into the grid.

I understand that BESS or BEGS are more recent innovations and have several advantages over traditional systems. My first question is: what are those advantages? Are these economic advantages or purely technical?

Second, and to my main question, which relates to how battery systems react to signals from the grid to charge or discharge. Here I understand that the operators react to signals from the grid somehow (how?) and whether they use satellite data to monitor the grid and incorporate those signals into whatever battery operations is happening?


r/EnergyStorage • • 4d ago

In just four years, annual battery storage additions grew tenfold as costs declined, driving rapid deployment.The same increase in solar capacity took nine years, and wind 15 years.

Post image
13 Upvotes

"Deployment of storage capacity is outpacing existing policy targets. Storage additions hit a record 118 GW in 2025, including 108 GW of battery storage. If that pace were sustained through 2030 with no acceleration, energy storage would reach 1,020 GW, more than the sum of current national targets. Additions have been growing at almost 80% a year since 2020, which is much faster than the modest growth needed to hit the full 1,500 GW storage pledge. Storage additions are at least in part being driven by the dramatic declines in battery costs.

Countries with ambitious storage targets tend to have ambitious solar targets too. But several of the world’s biggest solar markets still have no 2030 storage target. Given the important role of storage in supporting renewables deployment, national storage targets can signal investment certainty and ensure grid stability." https://ember-energy.org/latest-insights/storage-target-ambition-is-rising-but-not-fast-enough-to-reach-the-goal/


r/EnergyStorage • • 6d ago

Storing lithium batteries

Thumbnail reddit.com
1 Upvotes

r/EnergyStorage • • 6d ago

A battery can have enough kWh and still fail to start your pump. What should a backup quote specify?

0 Upvotes

The fridge, Wi-Fi and a few lights sound like a modest backup plan. Add a water pump or an air conditioner, and the question changes: can the system handle them starting while other loads are already running?

Disclosure: I work with EITAI, a battery manufacturer and inverter distributor. My interest here is making storage specifications easier to question before buying.

Two separate checks help:

  1. Energy: how long can the chosen loads run? For an illustrative constant 0.5 kW load over 8 hours, the load needs 4 kWh. That is not a recommended battery size: conversion losses, reserve settings and operating conditions still need to be accounted for.
  2. Power: can the complete system supply the loads at the same time, including startup? More stored energy alone does not establish that. Ask for the backup output's continuous rating and its supported surge power AND duration, checked against the actual equipment.

Here is a short brief you can copy into a supplier discussion:

Country and supply voltage/phase:

Circuits that must work during an outage:

Measured or documented running loads:

Largest starting load and documented starting requirement:

Required backup hours:

Existing inverter's exact model:

Planned battery's exact model:

Who confirms the backup circuit design and commissioning:

Also ask which circuits will actually receive backup power. A battery on the quotation is not, by itself, confirmation that every circuit will work during an outage. Have a qualified local installer verify the design and local requirements.

For background, the US Department of Energy separates energy capacity from power capacity:

https://www.energy.gov/cmei/systems/solar-integration-solar-energy-and-storage-basics

California's backup-power guide also explains why startup loads matter:

https://ww2.arb.ca.gov/capp/cst/tch/welcome-to-the-zero-emissions-residential-backup-power-tool

For people who already have backup storage: which appliance or requirement changed your original plan the most?


r/EnergyStorage • • 6d ago

Water-based batteries store more energy in iodine with new electrolyte design

Thumbnail
techxplore.com
27 Upvotes

r/EnergyStorage • • 6d ago

[Market Discussion] Utility-scale BESS in Chile (2026): Moving beyond Northern solar arbitrage into HV transmission-connected assets — curious how foreign investors & developers are viewing LatAm right now

Thumbnail
gallery
5 Upvotes

Chile has quickly become the testing ground for utility-scale energy storage in Latin America, now surpassing 3.5 GW of operational BESS and over 5.3 GW under construction as of late 2026. However, working on the ground here in grid-scale origination and electrical engineering, the gap between how the market looks from abroad and what actually reaches Financial Close right now has widened considerably.

Wanted to share a few real-world observations from our engineering and development desk in Chile, and hear from international investors, IPPs, off-takers, or specialists who are either evaluating LatAm or already active in the region:

1. The geographic shift away from pure solar-curtailment arbitrage Nearly 79% of all BESS capacity currently under construction in Chile is concentrated in just three northern desert regions. Predictably, daytime/evening merchant spreads in those hubs are starting to show signs of cannibalization, and local/international project finance lenders are heavily discounting pure merchant exposure. Meanwhile, non-saturated high-voltage transmission corridors outside the northern hubs are showing compelling structural spreads and capacity value without the queue congestion—provided you can secure clean land y bay access early.

2. High-voltage transmission vs. distribution bottlenecks Earlier this year, regulatory friction led to a nationwide freeze on processing stand-alone BESS connections at the distribution level pending new technical rules. Because of that—and prior investor headaches in smaller distributed regimes—the cleanest path for institutional capital right now is connecting directly at high-voltage zonal or national transmission substations under Open Access rules, paired with realistic, unbundled substation CAPEX modeling from day one.

3. 2026 Grid-Forming & EMT (PSCAD) compliance is the new filter

Following regulatory updates in February 2026, every new BESS entering the Chilean grid is now subject to strict Grid-Forming (GFM) mandates—including overcurrent capability of at least 1.3 p.u., fast phase-jump recording, islanding stability, and OEM-validated EMT (PSCAD) models prior to commercial operation. Early-stage pipelines that treat interconnection studies as an afterthought are hitting major delays at the system operator level.

4. Bankability = Capacity + Contracted Cash Flows

Non-recourse project finance liquidity from tier-1 international banks has been remarkably strong in Chile throughout 2026, but it hinges on combining regulated sufficiency capacity payments (which require careful modeling of the grid's reserve margin factor rather than taking nominal tables at face value) with structured Tolling Agreements or firm evening PPAs serving energy traders and industrial portfolios.

Where we are focusing right now:

Instead of scouting sites manually, our team built an automated nodal origination and grid-analytics engine that ingests official power-flow topologies, historical nodal marginal costs, transformer loading, and environmental/land layers across the entire national grid. That has allowed us to originate and structure utility-scale stand-alone BESS opportunities up to Ready-to-Build (RTB) using disciplined Stage-Gate frameworks that minimize early capital at risk before grid admissibility is locked in.

Questions for the community (especially funds, IPPs, and grid specialists looking at Chile / LatAm):

  • For foreign investors, family offices, or IPPs evaluating LatAm: what is currently your biggest hurdle to entering Chile or co-developing pre-RTB assets (offtake structure, currency/UF mechanics, local permitting visibility, or finding de-risked grid nodes)?
  • Are you seeing more appetite from investment committees for entering via Stage-Gate Joint Development Agreements (JDAs) at early interconnection stages, or waiting strictly to buy full RTB packages at a premium?
  • For GFM / power systems engineers: how are OEMs handling validated PSCAD model delivery timelines in your markets compared to Chile's new grid code requirements?

Happy to exchange notes in the comments or connect via DM with anyone looking into the Chilean / LatAm storage market, exploring co-development synergies, or working on HV grid-forming integration.


r/EnergyStorage • • 7d ago

How did you get your generator or battery system, and what did it cost?

1 Upvotes

I'm developing a flex-fuel generator and trying to understand how homeowners actually buy backup power. Did you purchase, rent, lease, or use a service for the generator you have now? And roughly what did it cost, or what do you pay?


r/EnergyStorage • • 12d ago

Is sodium ion overhyped?

Thumbnail
youtu.be
3 Upvotes

r/EnergyStorage • • 12d ago

Invinity Endurium Vanadium Flow Battery Performance Upgrade

Thumbnail londonstockexchange.com
2 Upvotes

r/EnergyStorage • • 13d ago

Non-flammable membrane helps fluoride-ion batteries pass 50 cycles

Thumbnail
interestingengineering.com
14 Upvotes

r/EnergyStorage • • 13d ago

With 800V DC transitions slowing down, how are you handling thermal creep and arc mitigation on high C-rate 1000V/1500V battery racks?

Post image
3 Upvotes

There's been a lot of high-level talk in the industry about the slowdown of next-gen 800V DC transitions due to cost constraints and standardization lag. But on the integration floor, we still have to deliver real-world systems today.

Even sticking to proven 1000V/1500V architectures (or ~150 kW battery racks), pushing high C-rate discharging cycles introduces serious front-line headaches:

  1. Extreme thermal rise on heavy busbars: Contact resistance and ambient heat buildup under continuous cycling make thermal dissipation a tight packaging challenge.
  2. Arc-quenching / DC breaking capacity: Standard circuit breakers are often too slow to prevent catastrophic arc flash and semiconductor damage under massive prospective DC fault currents.

Snapped a quick photo from the enclosure floor (attached):

Color-coded heavy copper busbars bolted directly to 1250A high-speed DC fuses (low I²t).

For the power engineers and panel builders in this sub:

  • When packaging MW-scale battery racks or central inverter DC inputs, what has been your biggest headache lately—thermal dissipation / airflow clearance, or achieving selective DC clearing coordination without running into absurd component lead times?

Curious to hear how other teams are tackling this balance in their current builds.