r/StructuralEngineering • • 10h ago

Structural Analysis/Design Does the lack of a common standard for zooming/panning/orbiting/scrolling drive anyone else nuts?

34 Upvotes

It seems like nearly every software I use tries to use a different system.

Then you also get software like RAM Concept which has the most obnoxious orbiting tool I've encountered. I've got no idea what point it is rotating around.


r/StructuralEngineering • • 2h ago

Structural Analysis/Design How do you model the sloped floor swimming pool in Etabs?

3 Upvotes

I have never analyzed and design swimming pool. I understood for the horizontal floor but I don't have the slightest idea how do I do it in slanted floor mainly what complications may arrive while designing it.

Swimming pool is in the ground. -RCC to be used and structural walls to be used on sides and floor.


r/StructuralEngineering • • 1d ago

Structural Analysis/Design What are those things doing?

Post image
153 Upvotes

Those are sprinkled in my building in certain pathways. They're all bolted to the ceiling only, usually where the sidewalls are made of cinderblocks. Curious what they're doing and why only attached to the top.


r/StructuralEngineering • • 19h ago

Career/Education 8 Years in Tekla Steel Detailing, but I'm Losing Hope in This Career. Need Honest Advice.

5 Upvotes

Hi everyone,

I'm from India and have been working in steel detailing for around 8 years, mostly on Tekla Structures. Over this time, I've handled industrial, commercial, and pipe rack projects.

Right now, my plate is pretty full—3D modelling and model updates, GA/shop/erection/part drawings, RFIs, clash checks, and coordination with other teams. The more dependable I get, the more tasks land on my desk, but that hasn't translated into better pay, real appreciation, or decent work-life balance. Getting approval for basic leave is a struggle, and recognition is rare.

At 8 years in, I'm seriously rethinking whether to stay in detailing or pivot. I'm open to picking up new skills or starting fresh in a new area if it makes sense, I just don't want to make a rash move at this stage in my career.

For those who've been through this space:

  1. Is there real long-term career growth in Tekla steel detailing in India?
  2. Would shifting toward BIM management, structural design, or connection design make more sense?
  3. Are overseas roles (Middle East, Europe, etc.) realistic and worth pursuing right now?
  4. Is leaving the industry completely after 8 years practical, or am I throwing away too much leverage?
  5. If you were in my shoes at year 8, what move would you make?

I'm looking for grounded, practical perspectives rather than generic motivation—whether that means pushing for a title/pay reset, switching firms, looking abroad, or changing tracks altogether. I don't want to look back in 5–10 years feeling stuck in the exact same loop.

Appreciate any honest thoughts and experiences.


r/StructuralEngineering • • 16h ago

Structural Analysis/Design Framing doubt for a 1.6m wide beam carrying floating columns

1 Upvotes

Hi there i am a fresher structural engineer working in a small structural consulting firm in India. I have been working on a G+9 residential building where i this framing shown in the image below. It is the plan view of that frame.

There are 4 columns in it, C26 and C27 are the floating columns, GB1 is the beam on which the floating columns sit on it is shown in yellow color in the image and column C50 and C49 are the columns that support the GB1 beam.

The locations of the floating columns caused us to have a very wide beam of width 1600mm which is partially supported on column C49 as the column size is limited by the architecture. Now as this column only supported only half the width of the beam my seniors told me to model a cantilever which is shown as the red hatch in the image. When i asked them about the reason for the cantilever they told me that it was to support the beam or else it will be unstable.

They told me to model it in etabs as shown in image below. So in the image the yellow center line is the GB1, the 2 blue lines are modelled as rigid arm between floating column and GB1 so as to take in account the eccentricity without an instability error in etabs. the red line is the hatched cantilever i which i talked about my senior told me model it as a normal beam.

Now the thing is that in reality the GB1 will sit on column C50 and C49, but in the model it is instead first transferring it full load on that cantilever and then through it to the column which i think is inaccurate. And due to the same that cantilever failed in shear it shear stress was around 9.3 N/mm2 almost 3 times more than the limiting values as per the Indian code.

I told the seniors about this and also how this is not a real behavior, their response was to design that cantilever for only half load that is coming on it now. When i asked for the reason, they told me that the column C49 only cover half width and rest half is that cantilever so the load on it will also be 50-50% between them. Even with that half load it took the section of 1.5m depth for that cantilever bring the shear stress in limit which still required shear reinforcement.

My doubt is that do we even need that cantilever here. My thought is to design that wide GB1 beam as a flat slab instead and check moment in both directions and shear around the column C49 for punching shear.

Can anyone clear me out on my situation and my thoughts on it.


r/StructuralEngineering • • 21h ago

Structural Analysis/Design Tools or workflows to automate ISO 14122 maintenance access & platform generation from 3D models?

0 Upvotes

Are there any tools, CAD plugins, or parametric workflows that can take an imported 3D plant/equipment model (STEP, IFC, or native CAD) and automate ISO 14122 maintenance access?

Specifically, I’m looking for something that can
Auto-generate layouts walkways, stairs/ladders, and guardrails


r/StructuralEngineering • • 23h ago

Career/Education Payrise after obtaining RPEQ

1 Upvotes

Structural Engineer in QLD. Looking to get my RPEQ next year with 5 years ish experience. Will be undertaking sign-off responsibilities as well. How much payrise should I be asking for? Currently sitting ~100k + super


r/StructuralEngineering • • 1d ago

Structural Analysis/Design If I am not mistaken Seattle is in an earthquake zone. Is this structure a wise choice

Post image
39 Upvotes

r/StructuralEngineering • • 1d ago

Career/Education Managing schedule/workload

10 Upvotes

Not a complaining post.

I’m in a smaller firm where I have pretty good freedom to manage my schedule and clients. I like to pretend that I have a good handle on my schedule but it’s mostly guesswork and talking to clients before I blow through a deadline. Just wondering if anyone has any good rules of thumb, planning tricks, or software they recommend for forecasting how much time you need between milestones.


r/StructuralEngineering • • 1d ago

Structural Analysis/Design Foundation strapping not attached to joists?

Post image
0 Upvotes

Is this a concern? ICF foundation.


r/StructuralEngineering • • 1d ago

Op Ed or Blog Post Permits

1 Upvotes

Have you ever handled getting a permit for a client or contractor? Customer wanted me to do it like it was regular thing.


r/StructuralEngineering • • 2d ago

Photograph/Video Is this timber splitting an issue?

Post image
52 Upvotes

I'm in a Ethics PDH training and above me is a wood truss that I am curious about its structural integrity.

Building is from 1939 but that's about all I know.

I am in a 115mph wind speed area and ground snow is probably 40psf at most.

Any help from those with more timber knowledge?


r/StructuralEngineering • • 2d ago

Structural Analysis/Design Ohio Residential Code

6 Upvotes

Anyone here from Ohio?

the code requires anchorage for a steel beam in an open pocket. Anyone ever see this done?


r/StructuralEngineering • • 2d ago

Career/Education SE Lateral breadth PPI course

2 Upvotes

Hello all, I am preparing for SE lateral breadth and wanted to ask if someone had got the On demand monthly course for PE Structural (SE) and if yes, how was their experience. I am looking for practicing questions based on whatever I have studied.

Thank you,


r/StructuralEngineering • • 2d ago

Photograph/Video Chimney bracing

Thumbnail
gallery
3 Upvotes

Thoughts?


r/StructuralEngineering • • 3d ago

Humor 20psf attic LL in action

133 Upvotes

r/StructuralEngineering • • 2d ago

Structural Analysis/Design Running an RSA for X seismic, but producing reactions in the Y and Z as well?

1 Upvotes

I'm running RSA analysis in RISA for the X direction, there's only loading in the X, but the reactions are showing Y and Z reactions as well as an X reaction. Do I need to design my foundations for those reactions? They're pretty significant.


r/StructuralEngineering • • 2d ago

Structural Analysis/Design NYSDOT simple span steel girder with isotropic concrete deck overhang design being prescriptive

3 Upvotes

Surely someone has gone down this rabbit hole already after not accepting “it’s in the BD sheets” as an acceptable reasoning and I’m hoping to gain some insight.

On the last bridge I designed, it was a traditional reinforced deck, and, based on my current understanding, the additional reinforcement in the overhang of the deck had to be designed so the overhang would not fail before the barrier (TL-5).

With an isotropic reinforced deck, this design is not required and it is a prescriptive #6 at 8” with a 2’-6” development past the fascia girder.

The bridge manual in 2014 states the isotropic deck overhang reinforcement is to be designed, but that changed in subsequent issues of the bridge manual.

After going through the process of designing the overhang reinforcement for the traditional reinforced deck and having a better understanding of why that reinforcement is required, I am uneasy about the prescriptive design without some logical reasoning.

I am assuming there has been TL5 barrier tests with the prescriptive isotropic reinforcement for varying overhang widths between the allowances for use with isotropic reinforcement, and I am hoping someone can provide any sort of reference or information on this testing or insight on the reasoning behind this difference between the two types of decks in regards to the additional overhang reinforcement.

Thank you to anyone spending any of their time trying to help me out.


r/StructuralEngineering • • 2d ago

Structural Analysis/Design Available for a part-time Engineering assistance(uk)

4 Upvotes

I am a Structural Engineer currently pursuing an MSc in the UK. I have professional experience working on international structural engineering projects.

My experience includes steel design, Timber-frame and light-gauge steel (LGS) design, Reinforced concrete design, Foundation design, Engineering calculations, reports and technical documentation.

I am currently looking for a part-time opportunity to assist structural engineers, consultants or engineering companies with calculations, design tasks, drawing reviews, documentation or any other engineering-related work where I can contribute.

I am flexible regarding the workload and remuneration, as my main aim is to gain further practical experience, develop my skills and contribute to ongoing projects alongside my MSc studies.

If anyone is looking for an additional pair of hands to support their workload, I would be happy to connect and discuss how I could help.


r/StructuralEngineering • • 2d ago

Failure Historical Buildings tore down.

0 Upvotes

Can a city take down your buildings under an emergency demo due to "unsafe structure" wo even having a structural engineer report? There was no real threat of unsafe structure. Is this the right place to ask?


r/StructuralEngineering • • 2d ago

Wood Design Thoughts on this timber connection?

Thumbnail
gallery
0 Upvotes

Haven’t done any timber design (last one was back in college lol). This is in a high wind country, and is attached at the apex haunch of a wood rafter about 10m wide, structure is open. I’m worried the connection support would split or loosen over time due to high winds.

Support looks like a 2x6


r/StructuralEngineering • • 3d ago

Failure Bus video captures moment Brooklyn building collapsed

19 Upvotes

Previous threads have speculated about unsafe excavation around the foundation. This video is the only one I've seen so far showing the dynamics at the moment of the collapse.

Gift article so no paywall.

https://www.nytimes.com/2026/11/18/nyregion/brooklyn-building-collapse-video.html?unlocked_article_code=1.RlE.qbFt.S7Py3NTdq_pP&smid=nytcore-ios-share


r/StructuralEngineering • • 4d ago

Humor Thanks American Wood Council, I'm happy we got that cleared up

Post image
319 Upvotes

r/StructuralEngineering • • 3d ago

Wood Design Structural Integrity.

116 Upvotes